Projects Manager
Al Raya Realestate
Total years of experience :15 years, 7 Months
Projects Manager in a real estate development company, representing the owners (real estate developers), reporting to the CEO, in a construction project of two towers in Jeddah (5 stars hotel and offices/clinics). The project budget above 250 m SAR (about 67 m USD). I'm incharge of all managerial, technical, contractual, and administrative issues, including but not limited to time management, cost controlling, scope identification, quality of installation, health and safety, material supply and manage the relationship with stakeholders (owners, contractors, consultant, suppliers and the financing bank). We already handed over two hotel projects and two residential buildings in 2018/2019 and now we are in the finishing phase of the last two towers.
Project Manager in a real estate development company, representing the owners (real estate developers), reporting to the CEO, in a construction project of two towers (J View) in Jeddah (5 stars hotel and offices/clinics). The project budget above 250 m SAR (about 67 m USD). I'm incharge of all managerial, technical, contractual, and administrative issues, including but not limited to time management, cost controlling, scope identification, quality of installation, health and safety, material supply and manage the relationship with stakeholders (owners, contractors, consultant, suppliers and the financing bank). The project in the finishing phase.
■ Planning, Cost Controlling and Coordination of:
KAIA (Jeddah): The New King AbdulAziz International Airport, concrete works of multi-building with a contract value (+500 m SR)
Abraj Kudai Project (Makkah), concrete works of +35 floors tower with a contract value (+150 m SR).
Plot.3 Project (Makkah)- Security Building, concrete works of +15 floors tower with a contract value (+150 m SR).
■ Estimation:
For more than 10 projects;
Studying the contractual condition and Estimating the Indirect Cost such as (General requirements, preambles, staff (administration and supervision), equipments (machinery, cranes and lifting plant), temporary offices, site fencing with gate house and signboards, security and safety, transportation of workpeople, bonds and insurances), and create an execution plan includes the required duration, resources cash flow (in/out).
- Team Leader of the primary handover Committee of Al-Ajwa Arac Hotel (Manaber Al-Hamra'a).
- Member of the primary handover Committee of Al-Madina Aramas Hotel.
- Member of the primary handover Committee of Al-Aqeeq Arac Hotel.
- Member of the primary handover Committee of Al-Readat Arac Project.
- Member of the working group of hotels furnishing.
- Member of the committee of bids opening.
- Member of the committee of competing bids analysis.
- Member of the committee of sale of materials.
- The founder of the file of experiences and lessons learned from previous projects of the company.
■ Plot #5023 (Al-Ajoua Arac Hotel):
Project Manager (Owner Representative),
Located in Al-Madinah Central Area,
(Finishing and Closure Phases - 10 Floors, G.F, Mez. and 4 Basements)
■Plot #5026-5027 (Riyada Arac Hotel)
Project Coordinator,
Located in Al-Madinah Central Area,
(From foundation - 10 Floors, G.F, Mez. and 6 Basements
■Plot # 3081-3082-3137 (Taiba Aramas)
Project Coordinator,
Located in Al-Madinah Central Area,
(Finishing Phase - 10 Floors, G.F, Mez. and 6 Basements)
■Plot # 121-122 (Al-Aqeeq Hotel)
Project Coordinator,
Located in Al-Madinah Central Area, (Finishing Phase - 14 Floors, G.F, Mez. and 4 Basements)
■Plot #5022 (Al Isra'a Crom Hotel)
Project Follow-up Engineer,
Located in Al-Madinah Central Area,
(From Excavation to Operation - 10 Floors, G.F, Mez. and 3 Basements)
■Plot #5009
Project Follow-up Engineer,
Located in Al-Madinah Central Area, (Design and Tendering Phases)
■Plot #5040
Project Follow-up Engineer,
Located in Al-Madinah Central Area (Design Phase)
Master of Project Management (Construction and Infrastructure) – with the dissertation of (Mitigating and Resolution of Claims and Disputes in Construction Projects in Saudi Arabia)
Business Englis (BEC)
Master of Business Administration-MBA with Major in Business Administration (Learning Distance) (Real life institution that awards associate)
Graduation Project: Design and Analysis of a High Rise Building, Earthquake Resistant with Pile Foundations, with Prof. Nuri Al-Muhammadi.