Basem Mustafa, Infrastructure, Potable Water System, Sanitary Waste , Irrigation WaterWater System Project Manager

Basem Mustafa

Infrastructure, Potable Water System, Sanitary Waste , Irrigation WaterWater System Project Manager

Multi Work Co,

Lieu
Arabie Saoudite
Éducation
Master, mechanical eng.
Expérience
26 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :26 years, 9 Mois

Infrastructure, Potable Water System, Sanitary Waste , Irrigation WaterWater System Project Manager à Multi Work Co,
  • Arabie Saoudite - AlJubail
  • Je travaille ici depuis octobre 2016

Duties and Responsibilities:
- Study all the Contract Documents, BOQ, Drawings, and Specifications.
- Preparation the Technical Quires, Method statements and materials submittals.
- Prepare Construction Plan to meet the Project Schedule.
- Organized the Groups of manpower and Equipment’s to give a good accomplishment.
- Prepare and discuss the weekly report and monthly report with Management.
- Supervise the Construction work and follow up the site work with Site engineers.
- Supervise Mechanical, Civil.., work and all other activities on site.
- Follow up with safety Department all the work, requirements & Safety precaution on daily basis.
- Supervise the installation of By Bass pipe line to maintain the water supply for consumer during replacing the Asbestos pipe with HDPE & GRP pipe line.
- Coordinate with Q.C to perform Hydro testing, Chlorination & commissioning for the pipe line and other activities.
- Coordinate with Safety Departments to comply with the entire safety requirement on site.
- Follow up the materials request with procurements.
- Prepare the Monthly invoice
- Attend Weekly progress meeting with consultant & Client (Marafiq).

Construction Manager à Al-Harbi Trading & Contracting Co.
  • Arabie Saoudite - AlJubail
  • octobre 2008 à août 2016

Im Construction Manager / Mechanical superintendent working in Al- Jubail for Al- Harbi Co.
Im supervising all mechanical work, study the drawings, method statement, stress analisys and bill of materials, as built drawing and all paper work.
im supervising the installation of GRP, uPVC, GRE, DI pipes for all the systems, PW, SWW, Storm Drainage, Irrigation Distribution Water System.
Im attending progress meetings with Royal Commission.
Regards

MECHANICAL ENGINEER à ARAB TOWER
  • Jordanie - Amman
  • septembre 2006 à août 2008

CONSTRUCTION work

senior mechanical Engineer à Hassan al Kouz Co.
  • Jordanie - Amman
  • juillet 2004 à août 2006

Duties and Responsibilities:
- Study drawings / construction plan and specification to prepare the specification& quantities of pipes, manholes, ladders, fittings, pumps ….. and all required materials.
- Design pipes, pumps, tanks, filtration, instrumentation as per plant capacity requirement.
- Developing and completing the technical calculation, technical document and schedules.
- Liaise with contractors in designing PLC/ HMI/SCADA systems to link with numerous instrumentation and pumps, this entails new plant to troubleshooting and mending existing plant.
- Integrated management system for ISO certification.
- Supervising the installation of all equipment plant & utilities (Boilers, Dryers, Chillers, pumps).
- Installation (150mmΦ - 1200mmΦ) pipe works such as (mild steel, SS, uPVC..)
- installation the pumps, Air Valves, butterfly valves, gate valves and all mechanical work.
- Preparing of progress report to coordinate to planning engineer and other project discipline.
- Preparing As Built Drawing.

MECHANICAL ENGINEER à ADRITEC
  • Jordanie - Amman
  • août 2002 à février 2004

Duties and Responsibilities:
- Preparing and Implementing action plant effectively to maximize overall equipment efficiency of production machines.
- Distribution of load to operators to in order to achieve daily production target
- Assigned to monitor and checking pipe production and pipe run at the pipe rack.
- Utilization of manpower accurately.
- Troubleshooting and solving technical problems
- Ensure proper hose keeping and coordinating with workers and implementation of safety audit.
- Record preparation of tool history coordinating with purchase, planning, stores, tool room.
- Supervising the uPVC pipe extrusion line and production of injection equipment.
- Giving instruction on preventive & corrective maintenance programs for the mechanical equipments.
- Responsible for preparing foreign purchase requisition for the mechanical spare parts.
- Preparing and submit accomplishment reports to supervisor.
- Coordinate with the Q.C to check the quality of product.

MECHANICAL ENGINEER à JORDAN CO.
  • Jordanie - Amman
  • août 2001 à août 2002

Duties and Responsibilities:
- Create and maintain company quality documentation, such as quality manuals, quality procedures, etc.
- Implementing improved operational process leading to improvement in performance and efficiency.
- Establishing quality control procedure.
- Establishing and meeting quality assurance target.
- Responsible for all levels of quality control / quality assurance.
- Support the Quality Inspectors to ensure that products and processes comply with the relevant requirements of the quality management system.
- Servicing & Calibration of all types of gauges.
- Preparing clear explanatory document such as customers charts.
- Organize and manage quality assurance function in close co-operation with the customer and with company management team.
- Identifying relevant quality -related training needs and delivering training.
- Formulate and mange the development and implementation of goals, objective, polices, procedures and system pertaining to the QC/AC.
- Directing technical test, and prepare reports.
- inspection the row materials, product under manufacturing and finished products through Q.C supervisor and laboratories.
- Achieve ISO 9001 and application of this system platforms and departments of the company.
- Interface with Engineering and Operations to ensure transfer to Production of new products are in accordance with approved data.

MECHANICAL / PIPING ENGINEER à JORDAN PETROLEUM / REFINERY
  • Jordanie - Amman
  • janvier 1997 à mai 2001

Duties and Responsibilities
- Prepare work schedule for mechanical equipment installation and piping works.
- Oversee the placement and Installation of Pumps, Valves and meters along the pipeline.
- Supervising the installation of pipes (Alignment, welding, testing).
- Prepare method of statement, Hold points and all documents related to the Hydrostatic testing.
- Searching for visual clues of pipeline leaks, breaks, washout or other damage to the pipeline.
- Research and develop new and better machinery system for more productive and competitive.
- Supervise the work of Petroleum Refiner Furnace.
- Operates a variety of motorized vehicles such as backhoes and bulldozers
- Lays pipe along with the other members of the team

Éducation

Master, mechanical eng.
  • à Czevetokrzyski University
  • juillet 1996

Specialties & Skills

ADVANCED SAFETY COURSE
FRP PIPE CUTTING & LAMINATION
ISO 9001-2000
WINDOWS, PROFESSIONAL XP, MS OFFICE APPLICATION & INTERNET
AUTOCAD 2014,
DE-WATERING

Langues

Arabe
Expert
Anglais
Expert
Norvégien
Expert
Polonais
Expert

Adhésions

JORDANIAN COUNCIL
  • MECHANICAL ENGINEER
  • January 1997
SAUDI COUNICL
  • MECHANICAL ENGINEER
  • April 2008

Formation et Diplômes

AUTOCAD (Formation)
Institut de formation:
AL-ITIHAD
ICDL (Formation)
Institut de formation:
AL-THIQA CO.
GRP PIPE (Formation)
Institut de formation:
AMIANTIT

Loisirs

  • FOOTBAL, TENIS, TRAVELLING