Engineer Profession
Private Practice
مجموع سنوات الخبرة :23 years, 2 أشهر
Conduct Lot surveys (Boundary
Relocation, Topographic Survey etc.)
Port of Morsby, Papua New Guinea
Project Handled : Embassy of Japan Project
at Papua New Guinea
Job Description :
•Establish Control points to be used in the project.
•Establish gridlines and levels for reference
•Set out alignment pile locations
•Conduct joint survey with consultant prior to drilling of pile.
•Conduct joint survey with consultant prior to concreting works.
Al Jaber & Partners for Construction & Energy Projects
Doha P.O. Box 23007
Doha, Qatar
Project Handled : Al Muntazah Steet Extension Project
Doha, Qatar
Job Description :
•Provide / Conduct survey works as needed by the project.
•Set Out alignment of Utility lines (TSE - Treated Sewer Effluent)
•Set out alignment and levels of Underpass
•Set out alignment and levels for flyover
•Conduct joint survey with consultant prior to concreting works.
May 14, 2008 - March 31, 2011 : Surveyor (Civil and Building section)
Obayashi Corporation
JT Metro Joint Venture
Union Square. P.O. Box 182845
Al Maktum Road corner
Omar Bin Al Khattab Road,
United Arab Emirates
Project Handled : Greenline - (OGS-Civil and Building section)
North 1, North 2 and South Section (Civil and Building Section )
Kajima-Kumagai-Song Da J/V
Dai Ninh Hydropower Project
Ta In Commune, Duc Trong District
Lam Dong Province, Vietnam
Project Assigned/ Handled : Intermediate Adit and Headrace Tunnel to
Intake
Job Description :
•Establish Horizontal and Vertical Control points to be used in TBM (Tunnel Boring Machine)
•To Monitor the Segment Invert as well as the Alignment
•Prepare Monthly quantities of the Tunnel
•Check the Alignment of the TBM
San Miguel Properties Inc.
24/F SMPC Bldg.; St. Francis Ave., Mandaluyong City,
Philippines.
Job Description :
•Due Diligence work for the Balayan, Batangas Project (Project Seaside)
•To be able to verify if the technical description is a close polygon and if the area conforms with the area as seen on the title.
•To verify if the lots are contiguous.
•Monitor the relocation survey of the perimeter of the consolidated property.
Project Handled : Asturias Housing Project.
Calatagan, Batangas
Philippines.
Job Description :
•Consolidation of lot properties, establishing new property lines
•Design of road elevations for the housing project
•Computation of the volume of earthworks to be done.
EDZA Engineering Consultancy
28 Saddle Street, Rancho Estate II,
Marikina City. Philippines
Project Handled : Rockwell Land Corporation
Estrella St. Cor Amapola St.
Makati City. (OFF SITE PROJECT
Job Description :
•To be the owners representative in all survey works done seeing
to it that the lines and grades are according to plans and specifications.
A.A. Walsiyen Jr. And Associates
Geodetic Engineers - Land Surveyors
Baguio City. Philippines.
Job Description
•Conduct actual Survey work (boundary relocation survey, topographic survey) and prepare plans using gathered data from
the field.
Education : High School (
) :