Piping/Mechanical Draftsman
Samsung C&T Corporation
Total years of experience :18 years, 9 Months
Preparing/Revising of Process & Instrumentation Diagram (P&ID) & Process Flow Diagram as per Lead Mechanical Engineer’s comments/Instructions. Revising of Mechanical, Piping, Electrical, & Civil drawings for construction and As-built. Preparing/Revising of General Arrangement Drawing, Plant Layout, Piping Arrangement drawing including Isometric drawings with BOM and drafting of Piping support drawing. Review and check the drawings to ensure accuracy and correctness prior to their formal issue for construction. Undertakes pre-engineering site surveys in order to confirm the correctness of drawings/documents and suitability of allocated site for project implementation. Produces 3 dimensional (3D) modeling using AutoCAD. Monitoring all incoming and outgoing documents and drawings for mechanical and piping discipline. Adept at prioritizing workload and meeting deadlines with precision, accuracy and minimal supervision Coordinating with other discipline to avoid any mistake during the design/construction stage. Other task given by other department.
Department: Engineering
Project Involve: Project: District Cooling Plant (DCP 08 & 09)
Client: ALDAR Properties PJSC/Tabreed Cooling Company
Erection Site: YAS Island, Abu Dhabi, UAE
Plant capacity: 6500TR
Inclusive Date: June 2008 ~ September 2009
Duties and responsibilities: • Responsible for Rectification of P&ID's as per Engineering Manager's comments and preparation of concept/construction drawing.
• Responsible for Checking of Sub-Contractors drawings and documents for Mechanical Vendor
Drawing, Piping, electrical, MEP.
• Coordination with Sub-contractors in regards with the output of drawings and problems
encountered during design & engineering stage.
• Documentation - (Drawing & Document control (Includes Vendor Print) for engineering
department)
• Generating 3D model to easily distinguish the interference between plant services.
• Conduct site investigation for the Preparation of Site instruction drawing/field change request into benefit of solving the concern problem.
• Checking of Plan & Detail drawings for Construction, Erection (including Bill of Material for
Isometric drawings), and As-Built drawing for Piping, Electrical and MEP.
• Responsible of Preparation of Concept drawing (including P&ID) for proposed DCP and material estimation.
• Assisting the engineering manager by direct reporting the status of drawings and documents.
• Other task given by other department.
Company: System Generators Outsource Inc.
(Sysgen Outsource Inc.)
Address: 178Salcedo st. Legaspi Vil., Makati, Metro Manila, PH
Position: CAD Engineer
Department: CAD Group-Detailing Group
Inclusive Date: April 2007 - April 2008
Project Involve: Project: Perris Valley RWRF Expansion Plant
Client: Keiwit Pacific Company
Erection: Riverside Country, California, USA
Detailing of Piping System for Waste Treatment Plant Facilities such as
Clarifiers, Plant Aeration Basins, Piping for Scum fit, and Digester
Tank, etc
Project: Perris Valley RWRF Expansion Plant Underground
Piping 3D Model
Customer: Keiwit Pacific Company
Erection: Riverside Country, California, USA
I. Duties and responsibilities: • Responsible for preparation of Construction and Erection drawings.
• Provide detailed engineering drawing and Isometric drawing with Bill of Material.
• Provide/Extract the piping isometric drawing from the generated 3D model.
• Apply Quality Control system in the preparation of all design input.
• Generating 3D model based on plan and section drawing to distinguish the interference between Piping and other plant services.
• Checking of Isometric drawings output of co-cad engineer for quality generated drawings.
Company: Fujisash Phil. Inc.
Address: FCIE, Dasmariñas, Cavite
Position: AutoCAD Operator/Draftsman
Inclusive Date: May 2006 ~ April 2007
Project Involves: • HIGH RISE BUILDING
I. Duties and responsibilities: • Detailing of steel/Aluminum door and windows for high rise building.
• Checking of detail drawing before submitting to client.
Company: Babcock Hitachi Philippines Incorporated
Address: San Roque, Bauan, Batangas
Position: Design Engineer 1
Inclusive Date: June 2005 - April 2006
Project Involves: • TAKUMA Ltd Co., JAPAN
Project Name: TKM-SSP
• SUMITUMO HEAVY INDUSTRIES, JAPAN
Project Name: SHI-DOP
• TAKUMA Ltd Co., JAPAN
Project Name: TKM-INE
Takuma Model W-650SE Waste Heat Recovery Boiler
I. Basic Function or Nature of Work: Responsible for preparation of fabrication and erection drawing including engineering
calculation work.
II. Specific Task and Responsibilities: • Prepares the material allocation needed in a particular component to be able to fabricate in the shop floor.
• Prepares the details, fabrication drawings (with BOM), and pertinent documents prior to fabrication and issuance of necessary documents to shop floor for fabrication.
• Prepared detail drawing of welding-end preparation for pipes, valves and fittings.
• Preparations of Material Withdrawal Table (MWT) and material take-off of the necessary
materials for fabrication.
Civil Status: Married
Language Spoken: English, Tagalog
I hereby certify that the above information is true and correct to the best of my knowledge and ability.
Applicant
• Graduate of Bachelor of Science in Mechanical Engineering. • Proficient in AutoCAD 2000~2013 (2D and 3D Modeling) and Microsoft Office. • Having the ability to make, read, understand and interpret engineering plans, drawings and documents. • Basic Knowledge in operating the SMARTPLANT REVIEW. • Basic Knowledge of PDS and Microstation. Company: Samsung C&T Corp. (Engineering & Construction) Address: Abu Dhabi, U.A.E Position: Piping/Mechanical Draftsman / CAD Operator Department: Engineering Project Involve: Project: Emal Phase II Project (Emirates Aluminium Comp. Ltd) Client: EMAL Emirates Aluminium Erection Site: Al taweelah, Abu Dhabi, UAE Plant capacity: 1024MW