Senior Electrical Engineer
ABS International
مجموع سنوات الخبرة :27 years, 2 أشهر
Supervision team of a QAR 508 MN project (Energy City Headquarters and Data Center)
-Bahria Villa for Mr Kuwari QR 30, 000, 000.00 turn key project
-Mall of Qatar QR 355, 000, 000.00 construction
manager
Private villa Al Hilal QR12, 500, 000.00
Private Villa The Pearl QR 9, 500, 000.00
5 Villas compound Bu Hamour QR 6, 000, 000.00
19 Villas compound Izgawa QR 17, 500, 000.00
-Control of all MEP shop drawings & submittals.
-Ammending consultant's comments.
-Coordinating between consultants and sub-contractors.
-Coordinating with the arch. engineers in order to install all the trades in proper way and accordingly finalizing the builders drawings.
-Attending the weekly progress meeting with consultants, clients and project management.
-Monitoring the MEP progress on sites
-Reporting to the Project Manager
projects:
1- 2B+G+M+14 Oasis Residence @ Al Barsha South, Dubai.
value 29, 000, 000 AED
2- 2B+G+5 Offices Building @ Media City, Dubai
value 22, 500, 000
3- 2B+G+5 Offices Building @ Media City (Tower 2), Dubai
value 24, 500, 000
-Managing the Maintenance and commissioning Divisions in the company with all related duties
General maintenance for all EPS production machines, water boosters, chillers, pumps, boilers and diesel generators
Provided one week of On-Hand training for Bahwan’s staff (team of 1 engineer, 2 supervisors and 6 technician) to use the Indoor Air Quality equipment of VACsystem industry, USA
• Maintenance for HVAC systems in several locations in Abu Dhabi and Dubai including (6 ) six palaces for H. H. Sheikh Zayed Bin Khalifa Al Nhayan,
• Maintenance for all Automated cleaning Systems of industrial kitchens
• Preventive maintenance schedules for all systems in all locations
• Training technicians on the VACsystem (USA) products of indoor air quality.
• Quoting for maintenance tenders.
• Quality control, work estimation and monthly progress monitoring.
• Maintenance for chilled water pumps, chillers, boilers, EPS pressing machines, EPS Block machines, Air compressors, steam system piping, valves and fittings.
• Preventive maintenance schedules for all systems, machines and diesel power generators.
• Design & execution of Polystyrene sheet cutter
• Design and execution of recycling crusher.
• Production control
• Maintenance for injection & drawing PVC Machinery
• Preventive Maintenance schedules for the machines, pump set, cooling tower and the diesel power generators.
• Design & execution of machinery complementary parts:
1. Conveyer for the PVC pipes
2. In-cycle cutter for the pipes up to 10”
3. Recycling Crusher
4. Polyethylene recycling crusher
• Providing training for fresh technicians
In the Power Automation and Panel Division.
Assembling and testing of the follows:
• Control and power panels for booster pumps, pumping stations and submersible pumps
• ATS & Synchronization panels for Diesel Generators
• MDB, SMDB and Final Distribution Panel Boards.
Installation of a new production unit in CEMENT NATIONAL of Anfeh under supervision of
DURO DAKOVIC MONTAZA CONTRACTORS
Duties included:
• Cable trays
• Lighting installation.
• Instrument
In Maintenance of the 3rd power production unit in ZOUK power plaint, Zouk Mkael, Lebanon.
Job included insulation test and re-insulation of MV water pumps, LV water pumps and motors, instruments & reconditioning of the unit starter panels.
Installation of the soft water supply stations in north Lebanon under supervision of KOK DONG CONTRACTORS, Korea
• Installation & maintenance of power generators up to 600 KVA
• Installation & maintenance of water boosters, centrifugal and submersible pumps up to 300 KW
• Design, execution, installation and commissioning of remote starters for generators, power & control panels for water pump sets.