مجموع سنوات الخبرة: 11 سنوات, 8 أشهر
أبريل 2016
إلى حتى الآن
Technical Engineer
في bmb Group
البلد :
مصر - القاهرة
فبراير 2015
إلى مارس 2016
Technical Engineer
في Flora Group W.L.L
البلد :
قطر - الدوحة
• Installing, configuring & maintenance of Q-Matic System’s hardware & software. Monitoring & Maintaining of real time updates of different branches.
• CCTV Installing
i.e.
Axis - Felix - HikVision
DVR Software Installing or Net configuration and Web address configuration, Access Control system Installing, Access Control System Software Installing.
• Installating, troubleshooting and support for different products like Time attendance system, Barcode Printers, ID Card printers
i.e.
Fargo - Zebra - Polaroid
• Responsible for the different types of product (Company having range of product ) site survey, installation and after that support calls.
• CCTV Installing
i.e.
Axis - Felix - HikVision
DVR Software Installing or Net configuration and Web address configuration, Access Control system Installing, Access Control System Software Installing.
• Installating, troubleshooting and support for different products like Time attendance system, Barcode Printers, ID Card printers
i.e.
Fargo - Zebra - Polaroid
• Responsible for the different types of product (Company having range of product ) site survey, installation and after that support calls.
يناير 2013
إلى يناير 2015
Maintenance Enginner
في Gargour Technologies
البلد :
مصر - الإسكندرية
installing, maintaining barcode printers and reading Scanners Technologies, to be used in applications and solutions as Asset tracking and warehousing
i.e.
- Zebra
- TSC
- Paxar
- Honeywell
- Bizerba
- Datamax
- installing and maintaining fingerprint Devices & access control systems
i.e.
Granding - zk
- Installing and maintaining Handheld Devices in big sites like Carrefour Egypt
i.e.
Motorola - honywell
Latest Project :
installing QX-HAWK industrial imager Scanner for Production Control in ExxonMobil "Egypt" on 4 lines (.25 Liter - 1 Liter - 4 Liter - 20 Liter) to check the validity of the
barcode if there is a wrong Bottle at the production line a signal will be sent to the line to be stopped till the problem is solved
i.e.
- Zebra
- TSC
- Paxar
- Honeywell
- Bizerba
- Datamax
- installing and maintaining fingerprint Devices & access control systems
i.e.
Granding - zk
- Installing and maintaining Handheld Devices in big sites like Carrefour Egypt
i.e.
Motorola - honywell
Latest Project :
installing QX-HAWK industrial imager Scanner for Production Control in ExxonMobil "Egypt" on 4 lines (.25 Liter - 1 Liter - 4 Liter - 20 Liter) to check the validity of the
barcode if there is a wrong Bottle at the production line a signal will be sent to the line to be stopped till the problem is solved
يناير 2014
إلى يناير 2015
IT Technical Support Engineer
في Al Wasl International Group
البلد :
مصر - الإسكندرية
Part Time
• Responsible to perform PC troubleshooting, support, resolution functions, and operations independently
• Resolve network communication problems independently
• Building and maintaining the network infrastructure
• Responsible to perform PC troubleshooting, support, resolution functions, and operations independently
• Resolve network communication problems independently
• Building and maintaining the network infrastructure
فبراير 2012
إلى يوليو 2012
IT Executive
في SELECT- MOBILES Co.
البلد :
مصر - الإسكندرية
• Maintaining VPN network, cyberoam Firwall
• Responsible to perform PC troubleshooting, support, resolution functions
• Responsible to perform PC troubleshooting, support, resolution functions
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني