Coating Inspector
ITP
مجموع سنوات الخبرة :16 years, 10 أشهر
Review /Comment and approval of all projet technical documentation ralated painting/coating/fireproofing and Insulation activity such as :
Site /Technical Query
Procedure.
Project specification.
TWI (Technical Works instruction)
WMS (Work-Method-Statement)
PSS (Painting Summary System)
QCP/
New Booster Station BS-171 at West Kuwait
BS-171
Slug Catcher
Gas Gathering
Assessment and Management of the Customer Agreement and the subcontractors.
Review-commented and approval all the technical and project documentation.
Follow up painting /coating and insulation daily activities according to the project planning
and all the approved project documentation (QCP-Procedure etc).
Management and Coordination of the constraction resurse such as
Gas Injection and Water Injection Network
Construction and installation of Water oil and gas High pressure separator installation
Construction of several Trunk lines e Flow lines differents diameters for triphase liquide transportation
Project PC1 and PC2
M’Boundì Field Development Enhancement Project PW6
Congo M’Boundi Oil Center
Name of employer: Sicim S.p.A. (EPC company)
Job Responsibility:
Supervision of mechanical and control activity of the various work phases such us: slope, slippage, bending, welding line, CND, paint-wrapping of welded joints, open excavation, backfilling and installation of the final line
QC Coating Inspector for pipeline joints cover application using heat shrik sleeve (Canusa e Raychem)
Managing and coordination of crew for surface preparation and coating application (HSS) in base
of the procedure quality control plan approved
Welding inspector for all the field ad shop welding according with all the WPS approved.
Painting inspection and make the relative quality report.
Pile
Louakouala oil center fire fighting system revamping (On-shore)
Multidisciplinary works M’boundi (on-shore)
Wells-Head connection of news platforms (Loango DP4-DP5-DP6) (on/off-shore)
Moto Pompe ZAF1 and DP1 (on/off-shore)
PWX-Revamping Project, ESD-PSD Upgrading
Following all the inspection relating the activity such as Painting-Coating-Fireproofing and insulation for both area on/off-shore as describt below.
Review-commented and approval all the technical and project documentation.
project crews managing and subcontractor’s coordination.
Work method statements preparation
Work Planning preparation relating the painting-insulation activity.
Follow up painting, coating and insulation application activities according to the project planning Procedure and the Quality Plan approved.
Salt Water Pipeline 24’’
CEC to CED Nr. 2 Pipeline 16”
MAGALLOY pipeline 16”
of mechanical and control activity of the various work phases such us: slope, slippage, bending, welding line, CND, paint-wrapping of welded joints, open excavation,
backfilling and installation of the final line.
QC Coating Inspector for pipeline joints cover application using heat shrik sleeve (Canusa e Raychem)
Managing and coordination of crew for surface preparation and coating application (HSS) in base
of the procedure quality control plan approved
Welding inspector for all the field ad shop welding according with all the WPS approved.
School Name: