Deputy Manager( 5E-Product, Design &Development, FEA, testing, Project)
Jk fenner
Total des années d'expérience :15 years, 9 Mois
Task :
Coordinate the project.
Responsible for the team Performing linear and non-linear calculation.
Project relevant to Product development process (APQP)
Coordinating Proto Building &Testing - DVP PLAN
Coordinate for SAP Bom, SAP ROUTING & SAP MATERIAL PART CREATION.
Approval for Costing of the parts in SAP.
Field failure 8D analysis.
Managed FE analysis for structural Design
Support structural calculation of small frame truck design
Support Engineering change activity for engine parts and Frame from global led team.
Developed dynamic method for 4-cylinder tube vibration calculation
Developed structural calculation method for scroll fixed and orbiting parts
Combined ARAI - Danfoss, First in INDIA developed vibration measurement method
Conducted Structural Calculation of various compressor and RC Engine components
Reduced the mass of the casting parts by 12% which significantly reduced the assembly mass.
Clamping analysis of bolted components in the system through ANSYS & cetim simulations
Performed linear and non-linear calculation for OPTMA Series, Maneurop, and Scroll.
Performed thermal calculation for OPTMA Series, Maneurop, and Scroll.
Optimization of components (Hydraulic valves, OPTMA Series, Maneurop, Scroll.)
Performed dynamic calculation for engineering models (with 20% limit- OPTMA Series, Maneurop, Scroll.)
Proposed cost reduction techniques without compromising on the quality to Design team.
Assisted design team with various products for development at different design stage.
Supported Engineers in Danfoss global product in solving the queries related field failure & 3D printing.
Prepare a detailed report with recommendation using Ms-PowerPoint
Vibration measuring for copper tube using B&K 2270
Support oil and gas project
CAD work
TAG gathering
Migration project
Design and development of automobile product
creating 3D model, and getting approved
Coordinator for proto type product
Coordinate for testing.
APQP
PPAP
in