Operational Engineer
Byco Petroleum Pakistan Limited
Total years of experience :10 years, 11 Months
Position: Graduate Trainee Engineer
Field of work: Operations/Process
Period: June 2015 to Present
Areas covered: Utilities and currently working on Crude Distillation Unit.
Pakistan’s Largest Reverse Osmosis Plant producing 3, 25000USGPD of Demin Water (Dissolved Air Flotation, Multimedia Filters, Sea Water Reverse Osmosis (SWRO), Brackish Water Reverse Osmosis (BWRO), Electro-deionization-Demin Water (EDI).
Assignments Performed At RO Plant:
Unloading and Loading of Multi Media Filters (MMF).
Cleaning of SWRO membranes and their preservations.
Successfully overcoming the challenge of High TDS from SWRO membranes and passage of Turbimax from MMF.
P-D Air Compressors- Double stage Double Acting.
Handling troubleshooting in case of compressor tripping.
Induced Draft Cooling Towers with a recirculation of 2130 m3/hr. and volume of 1000 m3.
(42barg) 3 Water tube Boilers of 67 TPH flow.
Ensure Safe start up, shutdown & smooth operation of all above units.
Implementation of Permit to Work (PTW) Procedures.
Preparation of checklists for safe start-up and shut down different equipment like Pumps compressor, turbines fin fan coolers etc.
Pre-Engineering
Beacon house School System Islamabad A 2009