CARLOS  CELESIO, Project Architect

CARLOS CELESIO

Project Architect

D-REKAB Contracting

Lieu
Philippines
Éducation
Baccalauréat, Architecture
Expérience
38 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :38 years, 3 Mois

Project Architect à D-REKAB Contracting
  • Arabie Saoudite
  • Je travaille ici depuis octobre 2008

-Experience in Project Management and Manpower Distributions.
-Capable in Architectural designing and Shop Drawing preparation.
-Capable in Project implementation and supervision.
-Check & review all detailed Shop Drawings prior to submittal
-Check and monitorsthe quality of workmanship and material application.
-Experience in Fit Out Works and Internal Decors.
-Monitors and supervise every piecework subcontractors.
-Well experienced in AUTOCAD, EXCEL & WORDS SOFTWARE.
-Experienced in preparing BILL OF QUANTITIES AND ESTIMATES,
-Having special experience in Aluminum Fabrication and Installations.
-Well experience in Making Cutting listsin both Aluminum and Glasses,
for Curtain Walls, Skylights, windows, Doors, Louvers, Canopies,
-Frameless Doors, Automatic Sliding Doors and any other items pertaining
to Aluminum works
-Capable in monitoring the proper aluminum fixations and glass erection
-Experience in Project Scheduling using Microsoft Project professional.

ARCHITECT
  • novembre 2006 à mars 2008

@ SUHAIR & FAYEZ Partnership as an

Project Engineer à RAMAH ALUM. CO. LTD
  • Arabie Saoudite - Riyad
  • janvier 2002 à janvier 2006

Responsible for project management involving alum. Works such as:
STRUCTURAL GLAZING, CURTAINWALLS, SPIDER SYSTEM, SKYLIGHTS, ALUM.
CLADDING, DOORS,
WINDOWS, CANOPIES etc.
SCOPE:
Responsible for the execution of the project as per the approved design and
specifications.
Responsible in checking and controlling the Shop Drawing for client’s approval.
Responsible preparing the correct cutting lists for aluminium and Glasses.
Responsible for checking the actual site status to gather all information to finalize
method of fixation.
From the

Architect à MAHMOOD SAEED COLLECTIVE CO
  • Arabie Saoudite
  • janvier 1999 à janvier 2001

SCOPE: Responsible for construction design & implementation
1. Project implemented
a. Interior rental spaces arrangement

Control Engineer à FIVE ANGLES CO. LTD. INC
  • Philippines
  • janvier 1998 à janvier 1999

Responsible for all finishing works.
From the

Architectural Designer à EJ SINTOS ARCHITECTS & ASSOCIATES
  • Philippines
  • janvier 1993 à janvier 1998
Architectural Designer
  • Philippines
  • janvier 1988 à janvier 1993
Architectural Draftsman à TREND-SETTERS CONSTRUCTION CORP
  • Philippines
  • janvier 1984 à janvier 1988

To give appropriate budgetary estimates and project cost for clients awareness cost wise
2) To prepare shop drawings and all other necessary drawings needed in the implementation
3) To provide project schedule for all activities for all discipline.
4) To give full or partial supervision to the project whenever necessary.
5) To make weekly and monthly progress report

Éducation

Baccalauréat, Architecture
  • à CAGAYAN DE ORO COLLEGE
  • mars 1986

Specialties & Skills

Project Management
MS Project
Progress Reporting
Drafting
Site Supervision
ARCHITECTURAL DESIGN
ARCHITECTURE
CUSTOMER RELATIONS
ENGINEERING