Chandan Singh, MEP Engineer

Chandan Singh

MEP Engineer

Elegancia Hospitality Group.

Lieu
Inde
Éducation
Master, Operations Management
Expérience
26 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :26 years, 9 Mois

MEP Engineer à Elegancia Hospitality Group.
  • Qatar - Doha
  • juillet 2015 à février 2016

• Performed as MEP Engineer in Elegancia Hospitality Group, Doha Qatar at site of Dukhan and Laweena Palaces as MEP in-charge for all engineering related work in the Palaces. Supervised all the mechanical and electrical woks throughout the Palaces.
• Played a key role in execution and maintenance of hotel air conditioning plants, hot water boilers, water coolers, refrigeration kitchen equipment, L.P.G.Banks, firefighting equipment, lifts/elevators and petty civil works as engineering- in-charge.
• Handled renovation and up gradation of hotel engineering works and supervised yearly license for Pollution Control.
• Prepare Cost estimation of project compiling the cost of Materials, Manpower, Equipment, Subcontracts, Overheads etc. required for the execution of the project.
• Review and approve the proposed electrical test procedures for materials / equipment / plant to be tested on Site by the Contractor. Witness such tests and review the related test reports.
• Liaise and coordinate with various contractors, clients, government and statutory bodies to settle techno-commercial disputes/ clarifications during the execution of the project.

Quality Engineer Mechanical à Velosi certifications LLC.
  • mai 2013 à mars 2014

. Performed as MEP Quality & Testing and Commissioning Mechanical Engineer from Velosi Certification LLC
Doha, Qatar. In NDIA site from obi third party Quality Engineer at CP-65 Airport- Airlines operations Facility site.
2. Development and construction of the facility Fire Hazards Analysis including fire modeling/analysis.
3. Prepare and defend the fire protection aspects of process and industrial safety documents required for construction of
the AOF Building.
4. Develop and implement the fire protection program for the AOF Building.
5. worked closely with the Fire Protection Design Engineers, Construction, and Site Fire Department.
6. Maintain an awareness of fire safety issues in AOF Building.
7. Provide an evaluation of fire safety in all engineering analysis prepared for structures, systems, and components,
including control of combustibles and material selections.
8. Develop fire protection inspection protocols and interface with inspectors, as required.
9. Coordinate development and maintenance of FHA.. Performed as MEP Quality & Testing and Commissioning Mechanical Engineer from Velosi Certification LLC
Doha, Qatar. In NDIA site from obi third party Quality Engineer at CP-65 Airport- Airlines operations Facility site.
2. Development and construction of the facility Fire Hazards Analysis including fire modeling/analysis.
3. Prepare and defend the fire protection aspects of process and industrial safety documents required for construction of
the AOF Building.
4. Develop and implement the fire protection program for the AOF Building.
5. worked closely with the Fire Protection Design Engineers, Construction, and Site Fire Department.
6. Maintain an awareness of fire safety issues in AOF Building.
7. Provide an evaluation of fire safety in all engineering analysis prepared for structures, systems, and components,
including control of combustibles and material selections.
8. Develop fire protection inspection protocols and interface with inspectors, as required.
9. Coordinate development and maintenance of FHA.
10. Support reviews of the Fire Hazards Analysis submittals.
11. Develop-and-maintain-the-Fire-Protection-Program-Plan.

10. Support reviews of the Fire Hazards Analysis submittals.
11. Develop-and-maintain-the-Fire-Protection-Program-Plan.

In charge - Five Star Hotel Project à CHL INTERNATIONAL, Dushanbe
  • Tadjikistan
  • décembre 2010 à mai 2012

CHL INTERNATIONAL, Dushanbe since Dec '10
In charge - Five Star Hotel Project

• Overall responsible for developing concept design and fit for purpose engineering solutions for projects and to undertake periodic valuation, assess contractor's financial claims and process payments of contractor for the executed work
• Take initiative to produce and approve project technical specifications and also closely monitor the Procedure, fire and gas system
• Interface and coordinate with Onsite Design team and manage to handover all drawings, systems/operations, etc. and to complete 'As Built' drawings for submission to Client/Consultant
• Liaise and coordinate with various contractors, clients, government and statutory bodies to settle techno-commercial disputes/ clarifications during the execution of the project
• Initiated the system of Condition Monitoring Techniques to ensure Safety and to enhance reliability of equipments
• Formulated Project Execution Plan and prepared Project Execution Process Manual.

A.Manager Mechanical à ETA ENGINEERING PVT. LTD
  • Inde - Delhi
  • décembre 2007 à septembre 2010

AM (Mechanical) - Delhi Metro Rail Corporation Division-Fire Fighting works.

• Ensured proper erection and commissioning of all firefighting and fire alarm works at GTB Nagar DMRC METRO STATION.
• Erected and Commissioned all firefighting and hydraulics works at DMRC line - 2, DMRC line - 6, Metro stations ( Udyog Bhawan, Race Course, Jor Bagh, INA Station, AIIMS Station, Green Park, Haus Khas, Malviya Nagar, Saket, Central Sectariat, Khan Market, JLN Station, Jungpura Station) and DMRC line - 3 (AIRPORT METRO EXPRESS LINE) Sector - 21 Dwarika Station
• Handled HVAC work in DIAL (Delhi International Airport Limited) of basement and sub - basement works of PTB (Passenger Terminal Building)

Manager Client Delivery à FIREPRO SYSTEMS PVT LTD
  • Inde - Delhi
  • janvier 2007 à novembre 2007

FIREPRO SYSTEMS PVT LTD Jan '07 - Nov '07
Manager (Client Delivery)

• Erected, tested and Commissioned all firefighting and fire alarm access control system CCTV system, Water leak detection system and Boom barrier installation at Amriprise building sector - 32 Gurgaon and Fire alarm system of BPTP park Central Gurgaon and firefighting systems of Unitech World Spa residential complex at Gurgaon.
• Performed as representative of the company for collecting the payments and handing over the sites after completion of the work, on behalf of the company.
• Acted as a team leader of multi-projects such as BPTP, UNITECH WORLD SPA and AMRIPRISE BUILDING at a time and motivating the different project in charge at above projects.
• Played a key role in firefighting pump room installation works at DMRC, IT Park, Shastri park New Delhi.
• Major clients include BPTP, UNITECH, ABB and AMRIPRISE.

Deputy Project Manager (Electrical) à UNITY INFRAPROJECTS LTD
  • Inde - Delhi
  • juillet 2006 à janvier 2007

Deputy Project Manager (Electrical)

• Monitoring of all the electrical and mechanical works of CAG building at Dindayal upadhayay marg New Delhi.
• Managed tendering, estimation and finalization of sub contractor for the work of air conditioning, DG set, firefighting, fire alarm works and electrical works of LT side power equipments and lightning arrangements of the building including BMS work, access control system, and CCTV system.

Consulting Engineer à STERLING INDIA
  • Inde - Delhi
  • janvier 2004 à juillet 2006

STERLING INDIA Jan '04 - Jul '06
Consulting Engineer

• Supervised HVAC firefighting, BMS, CCTV, Access control electrical works and installation of diesel generators.
• Streamlined air conditioning works at sector - 29 Punihani international hotel private limited.

HVAC Consulting Engineer à STUP CONSULTANTS INDIA PVT LTD
  • Inde - Delhi
  • août 2003 à janvier 2004

STUP CONSULTANTS INDIA PVT LTD Aug '03 - Jan '04
HVAC Consulting Engineer

• Successfully managed air conditioning works at Tata Tele Services Buildings at Ishwar Nagar New Delhi.

Manager (Electrical and Mechanical) à INDRAPRASTHA HOTEL
  • Inde - Delhi
  • janvier 2001 à juillet 2003

Responsibility
Played a key role in execution and maintenance of hotel air conditioning plants, hot water boilers, water coolers, refrigeration kitchen equipments, L.P.G.Banks, fire fighting equipments, lifts/elevators and petty civil works as engineer- in-charge.
Handled renovation and up gradation of hotel engineering works and supervised yearly license for Pollution Control

Manager (Electrical and Mechanical) à Lodi Hotel
  • Inde - Delhi
  • janvier 1999 à janvier 2001

Responsibility
Played a key role in execution and maintenance of hotel air conditioning plants, hot water boilers, water coolers, refrigeration kitchen equipments, L.P.G.Banks, fire fighting equipments, lifts/elevators and petty civil works as engineer- in-charge.
Handled renovation and up gradation of hotel engineering works and supervised yearly license for Pollution Control.

Manager (Electrical and Mechanical) à Aurangabad Ashok Hotel
  • Inde - Nashik
  • avril 1993 à décembre 1998

Responsibility
Played a key role in execution and maintenance of hotel air conditioning plants, hot water boilers, water coolers, refrigeration kitchen equipments, L.P.G.Banks, fire fighting equipments, lifts/elevators and petty civil works as engineer- in-charge.
Handled renovation and up gradation of hotel engineering works and supervised yearly license for Pollution Control.

Manager (Electrical and Mechanical) à Khajuraho Ashok Hotel
  • Inde
  • septembre 1990 à avril 1993

Responsibility
Played a key role in execution and maintenance of hotel air conditioning plants, hot water boilers, water coolers, refrigeration kitchen equipments, L.P.G.Banks, fire fighting equipments, lifts/elevators and petty civil works as engineer- in-charge.
Handled renovation and up gradation of hotel engineering works and supervised yearly license for Pollution Control

Manager (Electrical and Mechanical) à New Delhi Ashok Hotel
  • Inde - Delhi
  • juin 1990 à septembre 1990

Responsibility Handled estimation of electrical light fittings at Health Club of Ashok Hotel and Renovated kitchen equipments

Manager (Electrical and Mechanical) à Kanishka Ashok Hotel
  • Inde - Delhi
  • janvier 1989 à juin 1990

Responsibility
Played a key role in execution and maintenance of hotel air conditioning plants, hot water boilers, water coolers, refrigeration kitchen equipments, L.P.G.Banks, fire fighting equipments, lifts/elevators and petty civil works as engineer- in-charge.
Handled renovation and up gradation of hotel engineering works and supervised yearly license for Pollution Control

Sales Executive Engineer à FRICK INDIA Ltd
  • Inde - Delhi
  • juillet 1988 à janvier 1989

Tender making, Party consultation, going attending Tender Opening Process at different locations
in India.
It includes Sigroli Super Thermal Power Stations, Tender for Cold Storage Plant, and many more.
Discussion/Convincing the party to the Ice Plant/Cold Storages Enquiries.

Site Engineer à LIOYDS INSULATIONS INDIA Ltd
  • Inde - Delhi
  • juillet 1987 à mai 1988

Responsible for HCL (Hindustan Copper Ltd.) Khetri Nagar for insulation of Heat Exchanger of
Copper Melting Refining Plant.
Responsible for Insulation of Oil Tankers at R.S.E.B. Kota (Raj.).Supervised the job at site for a
fortnight only with the help of eight labors.
Did the work for Insulation of BST Pipes (Under ground) at UPSEB Thermal Power Station Tanda
Distt. Faizabad (U.P) with the help of 40 labors (Skilled).The work was completed 70% in just
5 Months.

Refrigeration Engineer à SUPERIOR AIR PRODUCTS Ltd
  • Inde - Delhi
  • octobre 1986 à mars 1987

Did supervision of project for liquification of Air Plant imported from British Oxygen Co. Ltd. London
\{UK\}.
Within five months refrigeration unit of initial input -20 degree Celsius rises up to 40 degree
Celsius as output which was executed commissioned successfully at Faridabad.

Éducation

Master, Operations Management
  • à IGNOU
  • décembre 2011

MBA (Operations Management) IGNOU, New Delhi

Baccalauréat, Mechanical Engineering
  • à YMCA Institute of engineering Faridabad
  • janvier 1986

Post Diploma in Mechanical Engineering, (Refrigeration and Air Conditioning) YMCA Institute of engineering Faridabad, 1986

Specialties & Skills

Firefighting
Access Control
MS-Office
Auto Cad
MS-Project
MS-Visio

Langues

Anglais
Expert
Hindi
Expert
Russe
Débutant
Urdu
Expert

Formation et Diplômes

Fire Fighting Skills (Formation)
Institut de formation:
DFS New Delhi
Date de la formation:
August 2000
Environmental Protection (Formation)
Institut de formation:
India Habitat Center Lodi Road New Delhi
Date de la formation:
June 2000
Fire Fighting Skills (Formation)
Institut de formation:
DFS New Delhi
Date de la formation:
August 2000