Sr.Surveyor
National contracting company
Total years of experience :2 years, 1 Months
1. From October' 2010.01.10 to tilldate
Company: National contracting company(NCC)
1 Layla to wadi Dawasir 380kV OHTL - 300km
2 Shedgum2 BSP to Kingsalman 380kV OHTL -100km
3 Shegum BSP to Al Dairee BSP 380kV OHTL - 120km
4 Shedhum BSP to Qurraiyyah 1 BSP 380kV OHTL - 130km foundation works, template set up, towet pit marking with GPS.concrete for tower foundation .
Electricity Power cable project, Doha, Qatar
Qatar Transmission System Expansion Phase VI
Client - Qatar General Electricity and Water Corporation
Consultant - ENERGOPROJEKT- FICHTNER CONSORTIUM
Main Contractor - ABB Germany - GTC / 116 / 2006 - 66kV
- GTC / 05 / 2004 - 66kV
- GTC / 57 / 2005 - 220kV
Main Contractor - Viscas Corporation - GTC/142H/2006 - 66kV & 220kV
Main Contractor - Mitsubishi Corporation - GTC / 22 / 2004 -132kV
1. From October' 2008.01.10 to 2010.09.01
Company: Khalid Electrical & Mechanical Company (KEMCO) Doha-Qatar, Reputed
Leading Electro-mechanical Contracting Company in Doha, State of Qatar.
Designation: SURVEYOR
2. From October' 2010.09.20 to till date
Company: National Contracting Company (NCC) LTD.KSA
Designation: LAND SURVEYOR
PROJECT ACCOMPLISHMENT
I. Project: KAHRAMAA
Designation: SURVEYOR
2. From October' 2010.09.20 to till date
Company: National Contracting Company (NCC) LTD.KSA
Designation: LAND SURVEYOR
PROJECT ACCOMPLISHMENT
I. Project: KAHRAMAA
Electricity Power cable project, Doha, Qatar
Qatar Transmission System Expansion Phase VI
Client - Qatar General Electricity and Water Corporation
Consultant - ENERGOPROJEKT- FICHTNER CONSORTIUM
Main Contractor - ABB Germany - GTC / 116 / 2006 - 66kV
- GTC / 05 / 2004 - 66kV
- GTC / 57 / 2005 - 220kV
Main Contractor - Mitsubishi Corporation - GTC / 22 / 2004 -132kV
Main Contractor - SIEMENS - GTC /05/2004 - 66kV
II. Project: KAHRAMAA
Electricity Power cable project, Doha, Qatar
Qatar Transmission System Expansion Phase VIII
Client - Qatar General Electricity and Water Corporation
Consultant - ENERGOPROJEKT- ENTEL
Main Contractor - LS CABLE - GTC/142C/2006 - 220kV
1. From October' 2008.01.10 to 2010.09.01
Company: Khalid Electrical & Mechanical Company (KEMCO) Doha-Qatar, Reputed
Leading Electro-mechanical Contracting Company in Doha, State of Qatar.
Designation: SURVEYOR
2. From October' 2010.09.20 to till date
Company: National Contracting Company (NCC) LTD.KSA
Designation: LAND SURVEYOR
PROJECT ACCOMPLISHMENT
I. Project: KAHRAMAA
Electricity Power cable project, Doha, Qatar
Qatar Transmission System Expansion Phase VI
Client - Qatar General Electricity and Water Corporation
Consultant - ENERGOPROJEKT- FICHTNER CONSORTIUM
Main Contractor - ABB Germany - GTC / 116 / 2006 - 66kV
- GTC / 05 / 2004 - 66kV
- GTC / 57 / 2005 - 220kV
Main Contractor - Mitsubishi Corporation - GTC / 22 / 2004 -132kV
Main Contractor - SIEMENS - GTC /05/2004 - 66kV
II. Project: KAHRAMAA
Electricity Power cable project, Doha, Qatar
Qatar Transmission System Expansion Phase VIII
Client - Qatar General Electricity and Water Corporation
Consultant - ENERGOPROJEKT- ENTEL
Main Contractor - LS CABLE - GTC/142C/2006 - 220kV
Main Contractor - Viscas Corporation - GTC/142H/2006 - 66kV & 220kV
Main Contractor - Taihan Electric Wire Co. Ltd. - GTC/142H/2006 - 220kV
III. Project: SAUDI Electricity Company (SECO)
Electricity power cable & over head tower line, KSA
Saudi Transmission System Project Portion #
Client - Saudi Electricity Company
Consultant - SATCH
Main contractor - NATIONAL CONTRACTING COMPANY (NCC) LTD
Job Description: -
• Detail survey of cable route in three dimensional systems.
• Topography survey of land and related property using latest surveying technology.
• Setting out of cable route alignment using geometric co-ordinate system.
• TBM fixing with reference to QND ( Qatar national Datum) PBM.
• Preparing profile drawings, inspection and implementation of HDD jobs.
• As-built surveyed in three dimensional system.
• Sokkia GPS (GRX1) established benchmark (TBM)
• 330kv Tower line survey, bi-section, Tower foundation
• Stake out of 115kv steel monopole route alignment using Geometric co-ordinate system
• 115Kv Under Ground Cable Co-ordinate Stake out (setting out), Topo Surveying
IV. Project: KAHRAMAA
Electricity Power cable project, Doha, Qatar
Qatar Electricity Distribution Network (MV & EHV)
Main Contractor - KEMCO
Job Description: -
• Setting out of distribution power project as per scheme drawing in site.
• Survey of MV & HV Cable circuits distribution for as-built record.
• Field book preparation and submittal to KAHRAMAA.
List of SURVEYING EQUIPMENTS Description: -
I am well familiar with all kinds of latest surveying equipment and here is the list of equipments
/ accessories already used in surveying activities;
• Total Station (Sokkia Model No.Set-5f, SET330R, SET630R)
• Total Station (Leica Model No.303, 405, 406 & 805)
• Total Station (NikonModel No.522, 550)
• Auto level Machine ( Sokkia)
• Auto level Machine (Leica)
• GPS ( Sokkia Model No.GRX-1)
• Sokkia Theodolite
• School of Geomatics - A collage of Geomatics Engineering, Kathmandu, Nepal [Total station, Theodolite & Level Machine operation training in 2005 to2007 ]
• Higher Secondary Education Board, Solukhumbu Higher Secondary School, Solukhumbu, Nepal [Higher Secondary Examination in 2002]
[School leaving Certificate in 1998 ] SOFTWARE KNOWN
• School Leaving Certificate Board, Soloukhumbu Secondary School, Solukhumbu, Nepal