شربل سلوم, Construction Manager

شربل سلوم

Construction Manager

SEG

البلد
لبنان
التعليم
ماجستير, PMP
الخبرات
21 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 8 أشهر

Construction Manager في SEG
  • لبنان - بيروت
  • أشغل هذه الوظيفة منذ سبتمبر 2013

-Managing and revision for daily operation on the site.
-Create and manage the scope, time schedule, and contractual deliverable, tracking, quality assurance, variations order, request for inspections, etc....
-Support subcontractors, engineers to follow the design tender and consultant requirements.
-Preparing and submission of all necessary shop drawings.
-Liaise with the Contracts Department for review of contract terms and conditions

Key achievements: Obtaining fast approvals from the concern consultant and owner in short time period.

Senior Architect في Landmark Retail
  • لبنان - بيروت
  • يناير 2011 إلى سبتمبر 2013

- Project Management and site supervision.
- Preparing request for proposals, and prequalification questionnaires.
- Review cost loaded time schedules.
- Managing team of Landmark and support contractor's engineers.
- Work with MAF (Majed al Futtaim) engineers to understand there criteria in construction and design as well as drawings submission.

Head Of Architectural Department في Aldar Consultancy
  • الكويت
  • مارس 2006 إلى يناير 2011

-Working on design proposals for residential buildings, towers, and resorts from concept phase till design development stage to site construction.
-Control, direction and coordination of the procedures for the preparation of tenders, as well as the organization of the technical and commercial teams and sub consultancy agreements.
-Preparation of technical and financial proposals for different types of projects, including residential and commercial buildings, resorts and private chalets.
-Participating in the preparation and the updating of feasibility studies, cost estimates financial studies along the project lifecycle.

Key achievements: Cost savings over 1 million Kuwaiti Dinar by changing the architectural concept design.

Project architect في Charles Hadife Architects
  • لبنان
  • سبتمبر 2002 إلى يناير 2006

-Working on internal and external design from concept till final design stage.
-Preparing all necessary drawings for submission in accordance with regulations authorities if required.
-Finalizing all necessary shop drawings for executions.
-Designing all necessary drawings related to landscape.

Key achievements: 1st Prize Competition, Lattquieh beach resort.

الخلفية التعليمية

ماجستير, PMP
  • في Project Management Institute
  • يناير 2009
ماجستير, Landscaping
  • في Lebanese University
  • يناير 2008
ماجستير, Master in Architecture
  • في Lebanese University
  • يونيو 2006

Specialties & Skills

Adobe Photoshop
AutoCAD
3D rendering
Management
Construction
Interior
Landscaping

اللغات

الانجليزية
متمرّس
الفرنسية
متمرّس
العربية
متمرّس

العضويات

Order of Engineer
  • Architect
  • January 2007

التدريب و الشهادات

PMP certified (الشهادة)