manager mechanical maintenance
Reliance Industries
Total years of experience :5 years, 10 Months
planning and Material management through SAP system at ASU and PCG gacification plant.
preventive and corrective Maintenance of equipments
Asset criticality and BOM Updations in SAP
Contract field Audits
Scaffolding erection and validation.
Activity charts during Shutdown and slowdown of plants
providing Equipments like crane, hydra, trailer, Manliftters for lifting shifting with duly filled checklists
providing proper work permits, Hazard identification and task based risk analysis.
trying to reach complete 100%PM compliance of equipments in plant.
facilitating the major onetime MOC's with WBS linked work order management in SAP system.
Budget preparations and Utilization for plant performance. through SAP.
Functional location and Equipments creation and ABC indicator at SAP system which difines the criticality of equipments.
painting of structures for strenghtness and maintaining thickness as recommended by Reliability team by taking DFT of applied paints.
project coordinator, preparations for Precommisioning activities of ASU plant and Natural gas firing provisions at CPP plant.
New line erection as per Piping and instrumentation diagram.
pneumatic and hydraulic pretesting of erected lines.
corrections and modifications at site as per the observations
Small modifications as suit to site for the ease of plant operations
modifications and rectification required at site in MRPL
pipeline civil sleeper supports and necessary mechanical supports in existing system strengthening.
manpower assignment, for necessary Precommisioning activities