Electrical Engineer
Al Mariah United Group
Total years of experience :12 years, 11 Months
Performed in-depth electrical acceptance testing of completed hardware, including continuity and high potential isolation testing.
•Maintenance of ACB, Boiler, UPS, IPS, PUMP Controls, Mcquay Chillers, Carrier Chillers, York chillers, Electronics Equipment and BMS control.
•Control panel erection and commissioning.
•Verifying termination of instrument and control panel referring to design diagram.
•Able to sort electrical faults and can make solution for the same.
•Troubleshot electrical equipment problem such as AHU, FCU, and CHILLER control panels.
•Logged detailed and through records of maintenance performed.
•Referenced in-depth knowledge of PLC and control system, especially in relation to test stations and lab safety system.
•PPM for all electrical equipments