Team Leader
AGILITY LOGISTICS (Global Integrated Logistics)
مجموع سنوات الخبرة :23 years, 4 أشهر
Develop a strategy the team will use to reach its goal
Provide any training that team members need
Communicate clear instructions to team members
Listen to team members' feedback
Monitor team members' participation to ensure the training they providing is being put into use, and also to see if any additional training is needed
Manage the flow of day-to-day operations
Create reports to update the company on the team's progress
Distribute reports to the appropriate personnel
Loading and Unloading containers and re-palletize the newly arrived materials if necessary.
Inspect materials for damages.
Perform PPP&M for materials which require attention while receiving and shipping.
Induct received materials in the system using RF Guns.
Tally the Receiving Tally Sheet to match the physical quantities on 1348.
Segregate and put away the materials in allocated locations.
Picking materials from assigned locations as per the MRO’s released.
Ensure Correct Picking and Sorting of materials as per DoDAACs.
To do live inventory while picking materials.
Packing materials into boxes and arrange the same pallets.
Shrink-wrap and strap boxes/materials whenever required.
Ensuring scanning of all drop IDs and updates are done before dispatching the materials.
Perform COSIS for materials while under storage.
Report discrepancies to Team Leader for possible corrective actions.
Perform Manual Allocations when the system is down unduly & operational ground space is limited.
PHIL IPPINE ADVANCED PROCESSING TECHNOLOGY, INC. (PAPTI)
Blk. 15, Lt. 13 Phase 3
1. To ensure correctness of materials, through receives raw material from
Warehouse or material in-process (MIP) from Production and Planning
Control and process job order from line leader/person in-charge.
2. To ensure that slitting / cutting of materials are appropriately done base
On the released job order following the intended material width or size.
3. To avoid or if not minimized discrepancy that may affect quality of next process.
4. Responsible for preparing the following documents / records before leaving the work area like daily output production and downtime, machine loading schedule (OUTPUT ONLY) for PPC reference.
5. Responsible to transfer all slitter materials to next process with correct and appropriate identification.
To ensure free-defect products.
To meet required target output per item on daily / hour basis through recording important
Data on daily report before leaving.
To avoid/ minimized workmanship error during handling of products and also responsible For reporting all problems (minor/major) encountered in every material or products that may
Possibly cause of downtime, work interruption, or product ejection.
1. Bar-coding and Encoding.
2. To ensure correctness of checking finish products for delivery (Import and Export).
EDUCATIONAL BACKGROUND: College:
. Year
Year