ICT/ Facility Mangement Assistant
PPA: Office of the Head of Service
Total years of experience :2 years, 10 Months
Staff Development Centre (SDC), Kpirikpiri, Abakaliki.
Significant Contribution:
• Community Development Group (CDS): Millennium Development Goals (MDGs)
Segment: Well Testing Services (WTS)
Sub-Segment: Subsea (Subsea Landing Strings Services)
•
• Worked with the maintenance team to carry out scheduled and corrective maintenance, which includes:
•• Assembling and disassembling of Lower land String Assembly LLSA (comprises of BOV, Retainer valve, Flapper valve, THOJ adapter), Electrical wiring, continuity, insulation-resistance (IR) checks and installation of pressure and temperature transducers on the LLSA.
•• Tools Routine and Inspection Monthly (TRIM) and Quality Check on Senturion \[comprises of Riser Instrumentation Module (RIM) and Subsea Control Module (SCM)\]. Knowledge of the functions and use of the subsea control systems such as the Master Control Station (MCS), Dual Control Station (DCS), Emergency Shut Down (ESD) panel, Reeler, Human Machine Interface (HMI).
• • Tools inventory and management
• Achievement/ Significant Contribution:
•• Plan and execute the first load out of subsea landing strings to Pacific Sirroko Rig on April, 2013
•• Carry out electrical Insulation Resistance Test on LLSA all without supervision and produce a check list to verification which has been approved for use.
•• Ensure all instrument needed to perform all electrical activities (such as Megger, Mutimeters, e.t.c) are purchased and in good state
• Duties Carried out:
•• Calibration and Installation of pressure transmitters and temperature indicating instrument, process Instruments such as pressure and temperature measuring Instruments (both Electrical and mechanical), laboratory instruments such as pH meters, Autoclaves, Ovens, Incubator, Analytical balance, e.t.c., electrical measuring instrument with parameters such as resistance (Ω), current (Amps), voltage (volts) e.t.c, calibration of aviation instruments like torque wrenches, Installation of alarm annunciator.
•• Implementing calibration procedures based on ISO 9001: 2000 requirements and writing of daily report based on performance of instruments.
• Achievement/ Significant Contribution:
••Part of the team that executed calibration and Installation projects in May & Baker Nig. Ltd, Swiss Pharma. Ltd, e.t.c
•• Part of the team that constructed a standard temperature water bath
Graduated with a Second Class (Upper Division) in Electronics and Computer Technology,specialize in Control and Instrumentation with with knowledge in Electronics, Computer engineering, and Telecommunication