Employer: Siemens Energy Argentina.
Installation Name: Central Termoelectrica San Martin
Customer: TSM Group (web reference: http://www.tsm.com.ar/html/unidades.html )
Hold planning responsibilities for preventive maintenance activities, predictive and corrective maintenance activities of a combined cycle power plant. Direct manager for two engineers.
Project Manager in charge of planning, executing, monitoring and controlling, and closing scheduled activities for Minor Inspection, Hot Gas Path Inspection and Major Inspection of Siemens V-Engine Gas Turbines. The project team had ten employees.
Possess expertise in the use of Computed Maintenance Management System and Microsoft Office Software. Engineer lead responsible for implementation and change control of Consolidated Quality Program. ISO9000 and OHSAS 18001 Certified Power Plant.
Employer: Siemens Energy Argentina
Installation Name: Central Termoelectrica San Martin.
Customer: TSM Group. (Natural Gas and Fuel Oil .825 Mw Combined Cycle 2x SGT5 4000F & 1x SST-5000).
Supervision of technicians performing daily plant maintenance activities ensuring plant availability and functionality, while holding to the key performance indicators (Safety, Quality, Innovation, Customer Focus, and Human Performance). Management of work orders, purchasing orders and spares parts for scheduled GT inspections. Direct manager for fifteen employees in charge of activities related to electrical, mechanical maintenance.
GE Infrastructure (Energy) - Central Puerto Combined Cycle (800MW)
Electrical and Mechanical Boss: Maintenance responsible for 2 GE 9000FA (250MW) gas turbines and GE D11 steam turbine .I manage supervisors and activities of predictive, preventive and corrective maintenance of Balance Plant Equipment. ISO9001Certified Power Plant.
Mayor Achievements: Team leader in major overhaul of gas turbines I and II, which was achieved in 75% of scheduled time frame. Team Leader in Main Power Transformers repairs and Set up. Team Leader in EHS Global Star award.
International Experience-6/2006 and 2/2007: Called to perform emergency repairs in Trinidad and Tobago GE frame 7 power plant. In a week I solved a problem that had been causing unwanted stops for months.
Pluspetrol Energy, Tucuman Power Plant, Combined Cycle I & II (800 MW).
Electrical, I&C Maintenance Engineer. Team Leader of maintenance and Step up of electrical systems in Power Plant and High Volltage Power Station.The major equipments for Cycle I are: two 150 MW Siemens V94.2 gas turbines, two 230 tn/h Nooter Erikson heat recovery steam generators and 150 MW GE gas turbines with INFI 90 DCIS, and for Cycle II: two 125 MW MS9001E GE gas turbines, two CMI 240 tn/h heat recovery steam generators, a 125 MW ALSTOM steam turbine and a 132/500 KV power station.
GE Contractual Services, Tucumán Power Plant, Combined Cycle I (450 MW) Electrical Supervisor: Responsible for low, medium and high voltage in combined cycle Power Plant I, and technical support during Set up of GE protection devices DGP, EX2000, Multilin relays and overhaul of 185 MVA Siemens generator. In charge of punch list in combined cycle building and training control room and field operators in all electrical systems.
Stewart & Stevenson Operation Inc., Tucuman Power Plant, Simple Cycle (300 MW).
Shift Supervisor: I Supervised the operation of two Siemens 94.2 gas turbines, designed the operation procedures and assisted in the implementation of a software system to improve the plant performance. Responsible for operation programming, interacting with the National Energy Administration to ensure the favorable functioning of Argentina´s northern area power system (NOA).
Transnoa High Voltage Distribution Company for North Area of Argentina (NOA)
Electrical Maintenance Supervisor: Preventive and corrective maintenance of high voltage equipment in several NOA. Power stations on 132/33/13 KV. Led the Set up of SF6 breakers MAGRINI GALILEO, replacing all the oil breakers. Performed the audit of installations and Schlumberger SMEC System, used to control the energy sales transactions in the north of Argentina, using Schlumberger Meters.
Pueblo Viejo, Hydraulic Power Plant.
Operator & Plant electrician: Operation, maintenance and repairs of two 7.5 MW ANSALDO S.GIORGIO hydraulic turbines and auxiliary equipment. In charge of repair of equipment of two docks, which was necessary to put the power plant in nominal Generation.