دانيال IKHUORIA, Senior Civil & Structural Design Engineer

دانيال IKHUORIA

Senior Civil & Structural Design Engineer

LINKSO NIGERIA LIMITED

البلد
نيجيريا
التعليم
بكالوريوس, Civil Engineering
الخبرات
6 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :6 years, 3 أشهر

Senior Civil & Structural Design Engineer في LINKSO NIGERIA LIMITED
  • نيجيريا
  • سبتمبر 2015 إلى أكتوبر 2017

CLIENT : SHELL PETROLEUM DEVELOPMENT COMPANY OF NIGERIA

PROJECT: Forcados Yokri Integrated Project (FYIP) - FLARES DOWN OFFSHORE WORKS

The Shell Petroleum Development Company Limited (SPDC) wishes to perform Pipeline and Riser works related to the Forcados Yokri Integrated Project (FYIP) - Flares down offshore works. The project involved the design and construction of a new 12 inch pipeline from the Pig Launcher at the South Bank Flow station (SBFS) of the Forcados terminal to a new 12 inch Pig Receiver at the New Estuary Flow station (NEFS).

The project also includes the installation of a new 12-inch Pig Receiver at the NEFS platform (at the Separator Deck on Elevation +14.000m) with the associated piping and E&I works.

RESPONBILITY:

Performed structural in-place capacity analysis and design for NEFS platform.

Performed Static and Fatigue analysis for service, environmental, and boat mooring loads

Performed Dynamic analysis for wave loading and vortex shedding loading

Performed Transportation Load Analysis based on API-provided accelerations for “standard” barges

Performed Lift case analysis for load-out and installation configurations

Performed Mud mat design calculations



CLIENT: ADDAX PETROLEUM

PROJECT: ADANGA SOUTH (ADS) PLATFORM DECK EXTENSION.

A deck extension was considered by Addax for Adanga South (ADS) Platform located offshore in OML-123 to accommodate additional three new wells to be drilled and installation of a 20Tons Capacity Test Separator.
ADS platform was installed circa 2002 and platform legs have undergone some level of corrosion. A detailed structural analysis is required to ascertain the structural suitability of the platform for proposed deck extension and feature loads.

RESPONBILITY:

Pre-service Analysis with AISC, API and DNV codes using SACS
Load-out Analysis
Transportation Analysis
Tow-Fatigue (in case tow duration is more
than 10 days)
Lifting Analysis
Jacket on bottom stability Analysis

Blast and Damage with AISC, API and DNV codes using SACS

Structural Calculation with NSO/ISYMOST, SACS.

Structural Calculation according to AISC.

Sea fastening Design using DNV, NOBLE DENTON.

Deck Miscellaneous Design and local check

Weight Control Report (Topside & Jacket)

Design of Fixed Platform, Topsides, Substructures and piles with SACS.

Conversant with Offshore industry related guidelines, codes and regulations such as API-RP-2A, API-RP-2L, DNV rules, offshore material specifications as per ASTM.

Preliminary Sizing of Jackets, Tubular Code Check (API).


CLIENT: GAS TRAIN LIMITED

PROJECT: REVAMP, OPTIMIZE, COMMISSION AND OPERATE EGBAOMA GAS PROCESSING PLANT

RESPONBILITY:
Performed a review for civil & structural deliverables for the revamp and optimization of the Egbaoma Gas Processing Plant and the plant’s overall operation.

Ensured that non-conformities in deliverables with required minimum standard are marked and itemized out for effective implementation of standard requirements.

Prepared a comment register to aid the fast track of comment made and effected.

Took part in technical review meetings.

Participated in project HAZOP and review close out meetings at SPEC ENERGY, Dubai United Arabs Emirates ‘

Structural Design Engineer في AUDUBON-LINKSO ENGINEERING COMPANY LIMITED
  • نيجيريا
  • سبتمبر 2012 إلى يوليو 2015

CLIENT: PAN OCEAN OIL CORPORATION LIMITED:

PROJECT: ENGINEERING DESIGN FOR THE END FACILITIES FOR THE EXTENSION OF THE AMUKPE ESCRAVOS PIPELINE PROJECT AT AMUKPE AND ESCRAVOS ENDS.

RESPONBILITY:
Performed all civil /structural engineering analysis / design at Front End Engineering Design and Detailed Engineering Design and generated reports for facility structures and supports with the use of client approved software’s as indicated in the project scope.

Preparation of FEED deliverables for review and approval such as civil/structural design basis, civil design philosophy, civil/structural work specifications and review of geotechnical soil investigation report provided by client.

Performed analysis and design using Staadpro V8i and advanced Staad foundation V8i and issued for review / approval all Detailed Engineering Design deliverables such as : LACT unit foundation and support calculation report / detailed drawings, Generator house structural calculation report / structural details, bill of materials bar bending schedule, Pig receiver foundation/support calculation report, Pig receiver foundation structural details, Air compressor shed calculation report / details, Pipe and fire hydrant support details, Sump drain plan and details, Pipe rack/support foundation calculation report and structural details, manifold support calculation report and structural details.

Concrete foundation and mesh-wire perimeter fencing structural details, Wire mesh perimeter fencing structural calculations, Isolation valve pit structural calculations and detailing.

CLIENT: ADDAX PETROLEUM:
PROJECT: ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) FOR THE REHABILITATION/UPGRADE OF DESIGN OF NJABA DRILL SITE, COMPOSITE AND ACCESS ROAD.

RESPONSIBILITY:
Performed with the use of Staadpro, Staad foundation software and manual calculation the analysis and detailed engineering design of Njaba drill rig slab to be capable of supporting a working load of 160tons/m2 and other adjoining structures.

Preparation of civil/structural design basis, work specifications, foundation specification, specification for concrete works and general earth works specification.

Preparation of Bund wall reinforced concrete calculation report and details, Diesel tank foundation calculation report and details, Drill water vertical tanks foundation calculation report and foundation details, Generator slab calculation report and structural details

Preparation of Drill pad GA un-pilled area, Dry cutting corral calculation report and detailed drawings, cellar slab and pile cap structural details and calculation report
cellar slab and pile cap plan and section, pile foundation calculation report and details, cellar pit calculation report and structural details, concrete pile connection and splice detail, pile driving calculation report, Preparation of bar bending schedule, Preparation of bill of materials, Preparation of bar bending schedule.


CLIENT: PAN OCEAN OIL CORPORATION LIMITED

PROJECT:
ENGINEERING DESIGN FOR CONSTRUCTION OF A DUAL 6”X 65KM PIPELINE FROM OWA-ALADINMA TO OGHAREFE FLOW STATION AND GAS PLANT.

RESPONSIBILITY:
Preparation of civil/structural design basis and work specifications.

structural design and detailing of pig launcher and receiver foundations.

Pig launcher and receiver plot plan and typical chain link fencing details.

Pipe support and pipe sleeper calculation

Foundation details for pipe support and sleeper at pig launcher and receiver stations.

Preparation of bill of materials and evaluation.

Access road and drain channel layout plan and details for pig launcher and receiver station.

Line break valve pit structural design and detailing.

Civil / AutoCAD Engineer في KK-TECH VENTURES LIMITED
  • نيجيريا
  • يوليو 2011 إلى أغسطس 2012

POSITION: Civil/AutoCAD Engineer.

RESPONSIBILITY:

Use of AutoCAD software for civil/structural drawings and design

Use of AutoCAD software for design of layout and detailed plan for installation of gas power plant stations to enhance cement production rate
at WAPCO Shagamu Ogun state. (shoreline power system)

Illustration of electrical almond power cable and installation systems on a single line diagram for easy performance of feed work.

Supervision of civil work on street light installation projects. Lagos Island.

Participation in the installation of a 300meters span 175mm power cable at Guinness Nigeria Plc. Lagos state.

Survey and lighting system plan at Mouka foam, Lagos state.

Design of modification plans on refurbishment of gas/diesel power plants for WAPCO Shagamu Ogun state. (Shoreline power system)

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Ambrose Alli University Ekpoma
  • أبريل 2010

My final year project work was on DESIGN OF A 750 LECTURE THEATRE . this was successfully done and I scored Grade : A .

Specialties & Skills

Deep Foundations
Structural Design
Onshore
Offshore Projects
Design Optimization
Use of Staad PRO software
use of AutoCAD software for producing detailed drawings
use of microsoft office
use of ETABS for reinforced concrete designs
Use of TEKLA structures software for fabrication drawings
use of Advanced Staad Foundation software
use of SACS software for off shore structures and platforms.
use of CSC ORION for reinforced concrete designs

اللغات

الانجليزية
اللغة الأم

العضويات

NIGERIA SOCIETY OF ENGINEERS
  • CORPORATE MEMBER
  • December 2014
NIGERIA INSTITUTE OF CIVIL ENGINEERS
  • MEMBER
  • December 2014
COUNCIL FOR THE REGULATION OF ENGINEERING IN NIGERIA
  • REGISTERED ENGINEER
  • September 2015

التدريب و الشهادات

HELICOPTER UNDER WATER ESCAPE TRAINING (تدريب)
معهد التدريب:
FLACK PRIME ATLANTIC
تاريخ الدورة:
June 2015
المدة:
8 ساعات