Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Danish Naseem

Mondelez International

FMCG

Location:
Bahrain - Manama
Education:
Bachelor's degree, Electronics
Experience:
18 years, 11 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  18 Years, 11 Months   

July 2017 To Present

Mondelez International

at FMCG
Location : Bahrain
September 2013 To Present

Project PC&IS Leader

at Procter & Gamble Pakistan
Location : Pakistan - Karachi
Hair Care Plant - Port Qasim Plant Karachi

as a Project PC&IS Leader for overall project.

Current Responsibilities
As local resource was responsible for Installation of power control and information systems in new Hair Care project, includes Utilities, Making, Packing and Facilities.

a. Design Reviews :-
Worked with several OEM’s including Rockwell, Descon, Morimatsu, Schneider and others to ensure design comply with P&G standard based on Electrical Safety, Process Safety and Isolation of Hazard Energy also need to make sure about 100% coordination b/w all OEM’s by defining clear boundaries and zero miss.

• Review Making SCADA system based on Rokcwell and wonderware platform.

• Form field instrumentation till server’s configuration - closely worked with Rockwell to bring modification in global standard according to Pakistan design.

• Reviewed VMware base virtualization with Hypervisor and SAN based technology.

• Worked with different OEM in packing to bring UPACK technology at packing line.

• Worked with different OEM’s and reviewed more than 50 MCP and control panel for this project.

• Responsible to provide power and communication till several OEM’s skid in utilities.

• Create BMS design strategy and generate reporting and trending for all LEED required critical parameters.

b) VAT / SAT :-
Participate in different OEM VAT / SAT to make sure supplier construction / configuration was as per design, tried to bring plug and play system for safe startup and reduced engineering construction time.
March 2009 To May 2013

Power Control & Information System Leader

at PROCTER & GAMBLE PAKISTAN
Location : Pakistan - Karachi
Handling Automation and Cyber Security:-
PLC Programming (Control Logix 5000)
HMI designing (FactoryTalk View SE, ME, WOnderWare)
MCS Network Handling,
Instrument Commissioning
Control system Designing, include Field Instrumentation till Architecture level,
VIrtulization (Vmware, Hypervisor, SAN, NAS etc)
Servers Redundancy system
Backup and System Health monitoring

Reliability Management
Ensure 100% committed reliability via leading given below system.

Leading Control Loop Health Assessment System -
For all type of Loops Analog & Digital, From PID Tuning to Digital switches, & from field end logic to software end logic, Test all types' loops & ensure system efficiently.

Condition Monitoring Systems
Via Amp & Temp Monitoring system & Ensure on time alerting to Mechanical / Process Team before equipment / Process failure, keeps monitoring Motors efficiency.

Scheduling maintenance
For Electrical Control Panels & Controlling Equipments via SAP - PM system and Lead from assigning task to proper operation startup.

Spares Management
Ensure 100% critical spares availability in store room.

Calibration Management: Create & Lead calibration system & ensure 100% completion adherence against planed ensure 0% process loses due to equipment controlling.

Lead as PC+IS resource in any simplification / capacity increment Initiatives: Lead from designing end to proper execution & ensure 100% safe operation.

Capability Building for PCIS Juniors: Create trainings & training plan & ensure 100% adherence against scheduled training.

Lead break down studies: Lead & engage whole PCIS team for 6w-2H, Usage gap assessment, why-why & other tools to find out proper root causes & ensure this break down shouldn't occur again.

Repair & Maintenance Lab: Lead proper arrangement of Tools, Equipments, & ensure reasonable amount availability of consumable material. Proper arrangement of controlling system circuitry to check any initiative in lab before implementation in field

Commissioning Experience: • Participate in F&HC Plant installation / Commissioning at Port Qasim Karachi Pakistan, & play a key role in software / field Instruments to Panels Installation & commissioning.
Performed yellow lining test, ensure quality terminations.
Also participate in mini capacity increase project startup at Cairo F&HC Plant Egypt.
January 2005 To March 2009

Control & Instrumentation Instructor

at Pakistan Council of Scientific & Industrial Resear
Location : Pakistan - Karachi
1) From Jan 2007 to Feb 2006 as a Control & Instrumentation Instructor

a. Job Responsibilities.
Conducting Lab Practical Activities for Industrial Personals & lead 03 year Associate Engineering Program Practical Activities also leading final year project activities of trainees.

Professional Expertise - in Control & Automation Field

1) PLC Programming Expertise

• Allan Bradley Rslogix 5000 Smart programming logic via Ladder & Functional Block Diagrams.
• Setup & develop expertise in
• Adding field devices (Remote IO's, VFS's and SMART Overload Relays) In PLC program
• Analoge & Digital programming via control modules (Add on Instructions)
• Working Knowledge on Batch Controlling system via Phase Control Strategies
• Working knowledge on Devicenet, Controlnet, & Ethernet communication protocol
• Engineering Station creation over IP based Network & linking PLC to rslogix via Rs Linx.
• Mitsubishi FX series programming on Ladder Logic
• Keynce KV series programming on Ladder Logic

2) HMI Creating Expertise

• Good expertise on Factory Talk View Software SE,
• Creating Server & Clients
• Smart Graphic creation according to field
• Linking via Global Objects (Add on Instructions) for SMART designing
• Data logging & Trends Creation
• Alarm system creation,
• Working experience on SIMATIC WINCC HMI creation software
• Working Expertise on Factory Talk View Software ME,

3) Filed Instruments Expertise

• Different type of Transmitters Including Level, Position, Temperature & Pressure
• Parameterization adjustment according to process requirement over HART or directly to the instrument
• VFD's parameterization, torque controlling, Flying Start Analogue & Digital IO's controlling.
• Control Valve Calibrations & Parameterization
• Flow meters Calibrations & Parameterization
• Different type of Level & Position Switches
• Directional Control Valves (Pneumatic)
• Load cell controller parameterization & load cells calibration

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
November 2009

Bachelor's degree, Electronics

at Preston Institute Of Management Science & Technology
Location : Pakistan - Karachi
Grade: 3 out of 4
electronics technologist
March 2004

Diploma, Electronics

at Govt. College Of Technology
Location : Pakistan - Karachi
Grade: 3 out of 4

Specialties & Skills

ALLAN BRADLEY

Networking

Virtualization

PLC Programming

PLC Programming

IP Networking

Virtualization

Control System Design

Instrumentation

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Intermediate

Urdu

Expert

Training and Certifications

Advance PLC ( Allan Bradely Control Logix 5000) ( Certificate )

Issued in: July 2010 Valid Until: - August 2010

Information Technology ( Computer Science ) ( Certificate )

Issued in: January 2004 Valid Until: - February 2004

Loading
Loading...
Loading...