Technician
Saudia Arabian Airlines Catering
Total years of experience :17 years, 4 Months
Facility Maintenance including daily check-up of lighting fixture, fly killers,
fire alarm devices, censors and other electrical devices.
• Check-up and replacement of defective components of water boilers (350 gals.)
including its heating elements, magnetic contactors, circuit breakers, anode,
also repair its leaking with the use of welding machine.
• Estimate bill of materials needed for the propose project or additional work.
• Installation of power supply for new machineries.
• Design the transformer size, cable size for the new machine.
• Installation of pipes, boxes and circuit breakers.
P 600, 000, 000
Projects on going : Waste Water Treatment @ Aramco
Our Lady of Manaoag Rosary Center
Carmen Cebu
Project Cost - P 1.2 M
Name of Project : Rehabilitation of Control Panel intended for
Oven
Mariveles Bataan
Project Cost - P 500, 000
JOB DESCRIPTION :
•Prepare electrical plans.
•Prepare bill of materials.
•Supervise during constructions.
•Supervise during commisioning of all electrical devices.
Prepare the electrical plans.
•Design and quantify the number of lighting fixtures.
•Design and quantify the number of Convenience Outlet.
•Design and quantify the actual quantity of Fire Alarm Devices.
•Design the number of Telephone Outlet as per clients advice location.
•Designate the particular circuit and cabling schedule of the telephone system
•Design the cable size of all the equipment of machineries listed for a certain factory building.
•Design the actual transformer size to be installed based on electrical loads.
•Prepare the single line diagram from which you can see all the panel board, their designation and locations.
•Prepare the materials to be used such as utility boxes, junction boxes, electrical wires, PVC and all the materials needed for the completion of project.
•Air conditioning sizing, decides what type to be use say floor mounted, ceiling mounted or window type.
•Paging system design, its amplifier rating and location of their speaker.
•Decides the main feeder from MDP ( Main Distribution Panel ) to transformer their preferable set - up say it will be underground in case to a PVC or overhead it will pass through a cable tray.
•Supervise during construction.
•Supervised during the commissioning of all the electrical set-up being installed on that particular building.
of Project : BADIAN RAWHOUSE
Badian, Cebu
Project Cost - P 14, 000, 000.00
JOB DESCRIPTION :
•Prepare weekly accomplishment report.
•Supervised the installations of lighting fixtures, exhaust fan, convenience outlets, telephone layout and all necessary electrical devices that will be installed on that particular project.
Prepare the electrical plans
•Prepare the electrical materials
•Supervise during construction
•Supervise during the commissioning of all the electrical set-up being installed on that particular building
P 450, 000, 000
JOB DESCRIPTION :
•Quantify the electrical materials.
•Prepare electrical materials.
•Prepare the tools and equipment needed for the said activities.
•Supervise during installation of electrical devices
•Make a daily accomplishment report
P 25, 000, 000.00
Name of Project : OLAYA COMMERCIAL BLDG. ( 9 storey
P 45, 000, 000.00\
JOB DESCRIPTION :
•Prepare work schedule and manpower schedule
•Prepare bill of materials and estimates
•Supervised during the installation of all electrical devices, such as lighting fixtures, convenience outlets, chillers for cooling system, telephone and all the related electrical works.
.