Dennis Tresvalles, Senior Quantity Surveyor

Dennis Tresvalles

Senior Quantity Surveyor

Parsons International (MENA)

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Baccalauréat, Civil Engineering
Expérience
22 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :22 years, 5 Mois

Senior Quantity Surveyor à Parsons International (MENA)
  • Émirats Arabes Unis - Abu Dhabi
  • juillet 2015 à juillet 2020

Project Name: Abu Dhabi International Airport Interchange Project (Abu Dhabi UAE),
July 2015 up to Present Jule 2020 (5 years)

• Overall in charge for the processing of monthly Interim payment applications of the contractor up to approval of Musanada procurement department.
• Evaluate and process Notice of potential change, New items. New rates and Variations, for approval of Musanada procurements and attend all project commercial meetings.
• Check agree and certify contractors interim payment applications.
• In charge for the uploading all commercial documents and checking into Musanda Primavera Unifier.

Senior Quantity Surveyor à Parsons International (MENA)
  • Émirats Arabes Unis - Abu Dhabi
  • avril 2014 à juin 2015

Widening of E10, Abu Dhabi Dubai Highway (Abu Dhabi UAE),
December 2014 to June 2015(7 Months)

• Closing out the project, prepare the final account for acceptance by the Department of Transport Abu Dhabi. forthe final payment to contractor.
• Deal with the contractor’s claims and disputes.
• Check and agree New Rates/variations and sign off the Final quantities.

Ras Al Akhdar Roads and Tunnels (Abu Dhabi UAE),
April 2014 to November 2014 (8 months )

• Closing out the project, prepare the final account for acceptance by the Department of Transport Abu dhabi. for final payment to contractor.
• Check and agree New rates/claims/variations and sign off the Final quantities.

Quantity Surveyor-ARE à Parsons International (MENA)
  • Émirats Arabes Unis - Abu Dhabi
  • février 2013 à mars 2014

Project Name: Consultancy Supervision Services for Roads and Infrastructure Maintenance Projects at Madinat Zayed, Liwa, Mirfa, Ghayathi, Sila and Delma
18th February 2013 to March 2014(1 year )

• Overall responsible for the preparation of Technical reports for the proposed projects to my assigned Areas at Western Region Municipalities of Abu Dhabi.The works starts from collecting data, conduct land survey, prepare the shop drawings, prepare BOQ and estimate the cost of the project to issue the work order package to the contractors and monitor the work during the execution and then do the As-built and assist the final inspection of WRM representative and prepare the final payment to contractor subject to WRM Approval.
• Deals with all the Progress reporting and any estimations as required by WRM Project Manager

Quantity Surveyor-ARE à Parsons International (MENA)
  • Émirats Arabes Unis - Abu Dhabi
  • août 2011 à février 2013

Project Name: Department of the President’s Affairs-Ghanadha Island Internal Service Road & Bridge Package-1, Package-2 and Package-3.
01th August 2011 up to 18February2013.(1.5years)

• Overall responsible for processing of contractor Interim payment certificate and preparing reports of physical progress to the Department of President’s affairs UAE Abu Dhabi,
• In-charge with the Contractual matters, Assist with the Resident Engineer for the project execution monitor and control. It includes checking of Shop drawings & As-built Drawings and project supervision requirements such as responding communication letters and technical issues.

Project Quantity Surveyor à Parsons International (MENA)
  • Émirats Arabes Unis - Abu Dhabi
  • avril 2008 à juillet 2011

Project Name: TRIP C#5001 Bridge and Tunnels at IP-44 and Sea Palace Intersection on Al Salam Street
17th March 2009 up to 31 July 2011.(2.5 years)

• Overall in charge for the processing of monthly Interim payment applications of the contractors up to approval of the Department of Municipal Affairs.
Check and Agree contractors measurements calculations.


Project Name : TRIP C#2016 Abu Dhabi, New Corniche Road East (Stage-2) Roads & Landscaping.
6th April 2008 up to 17th March 2009.(1 year)

• Assist in closing out the project, prepare the final account for acceptance by the Municipal Affairs for final payment to contractor.
• Checking of As-built drawings and Final joint measurements and updating of final quantity book and related documents for the closing out of the project.

Cost Engineer à Design Science-Malaysian Thai
  • Philippines
  • septembre 2007 à mars 2008

Project Name : South Luzon Expressway (Build and Operate project)
September 2007 to 15 March 2008 (7mos.)

• Overall in charge for dealing with the monetary matters of the project, claims, variations, interim payments, and processing of the same and provide technical support to planning and survey sections.
• Negotiate with the sub-contractors, suppliers and various vendors as required by the projects and serves as member of committee for tender queries and bid analysis and contractors selections.

Planning Engineer à China Road and Bridge Corporation
  • Philippines
  • octobre 2004 à août 2007

Project Name : Philippine Japan Highway Loan Project Catanduanes Circumferential Road (Cost Php 1.2Billion).
Philippines
Funded by Japan Bank (JBIC)
Nippon Koei Consulting Engineers(Consultant)
October 2004 to August 2007 (3 years)

• Overall in charge for the planning and cost control of the project, it involves development of baseline schedule, creating WBS, OBS, CBS, activity logics, loading resources and setting up manpower crew for the project execution.
• During implementation overall in charge for the schedule updating, reporting progress and giving workloads to all site engineers and collect updates by weekly basis.
• Initiate all project claims and attend all project meetings to consultants and government agencies with the Project Manager.
• Head of the technical group of this project it involves checking and giving data to surveyors for field implementation and supervise all drawing preparations for the project.
• Monitor Warehouse department for the incoming and outgoing of materials with regards to cost control and procurement schedule.
• Give reports and all needed assistance to the project manager.

Deputy Project Manager à Cavite Ideal International Construction Corporation
  • Philippines
  • mars 1998 à octobre 2004

CAVITE IDEAL INTERNATIONAL CONST. & DEV. CORP.
March 1998 to October 2004 (6.5 years)

Deputy Project Manager
Project Name :Philippine Japan Highway Loan Project Mindoro West Coast (Cost Php 882, 772, 207.70)
Philippines
Funded by Japan Bank (JBIC)
Nippon Koei Consulting Engineers (Consultant)
November 2002 to October 2004
• Assist the project manager for the overall project implementation.
• Overall in charge for the paper works of the project it involves, engineering and monetary matters such as claims/variations, interim payments and the overall process of the same up to the approval by the Department of Public Works & Highways, deals with the consultants, project reporting, drawings, technical matters and reporting to the owner of company regarding logistics and operation.

Cost Engineer
Project Name : Asian Development Bank, Quezon Province Road Project (Cost Php 654, 734, 147.00)
Philippines
Funded by Asian Development Bank (ADB)
Renardet, SA limited (Consultant)
November 1999 to November 2002
Assist in the preparation of Tenders for every project that the company is pre-qualified.
Overall in charge for the preparation up to approval of project interim payment.
Check and process sub contractor payment.
Head of the technical group of this project it involves giving surveyors the required data for site lay-out and responsible for the correctness of shop drawings.

Chief Surveyor
Project Name : Philippine Japan Highway Loan Project, Isabela, Province ( Cost Php 457, 875, 056.70)
Philippines
Funded by Japan Bank (JBIC)
KATAHIRA Int’l. Ltd. (Consultant)
March 1998 to November 1999
• Overall in charge for the survey works of the project it involve pre construction surveys establishing control points both horizontal and vertical, setting out all lines, points, elevations for constructions and provide data to all instrument man.
• Overall in charge for the measurements of accomplishments and certify sub contractors claims as well as shop drawings checking and plan & profile preparations during as built.
• Train surveyors to use digital instrument such as total stations and downloading/uploading files from raw survey data.







Site Engineer
July 1997 to March 1998
Project Name : 28-Storey Kassel Condominium, Vito Cruz Cor. Taft Ave. Manila
Philippines
Funded by Confederated Properties Incorporated
Lorenzo Dy & Associates (Consultant)
Owners representative, prepares billing of the sub contractor and report weekly accomplishment to the owner and see to it the work is in accordance with the plans and specifications
Negotiate with the sub-contractors and overall in charge for the foundation lay-out and pile driving activity.

Project Name : 7-Storey Residential & Commercial Bldg. Mandaluyong City
Philippines
Funded by Confed Preperties Incorporated
Lorenzo Dy & Associates (Consultant)
Owners representative, prepares billing of the sub contractor and report weekly accomplishment to the owner and see to it the work is in accordance with the plans and specifications
Negotiate with the sub-contractors and overall in charge for the foundation lay-out and pile driving activity.

Éducation

Baccalauréat, Civil Engineering
  • à Catanduanes State University
  • mars 1996
Baccalauréat, Bachelor of Science in Civil Engineering
  • à Catanduanes State University
  • mars 1996

Graduated Bachelor of Science in Civil Engineering Professional Civil Engineer; Registration ID 77403 issued by Professional Regulation Commission of the Philippines Professional Geodetic Engineer; Registration ID 8083 issued by Professional Regulation Commission of the Philippines

Specialties & Skills

Cost Estimation
Planning and scheduling
Final Accounts
Bill Payment
Quantity Survey
Quantity Surveyor
Planning and Scheduling
Civil Engineering site supervision
Evaluation of Variations
Autocadd designing and Primavera project scheduling

Langues

Anglais
Expert
Tagalog
Langue Maternelle
Espagnol
Débutant

Formation et Diplômes

Primavera 3.0 (Formation)
Institut de formation:
CAD Vision Philippines
Date de la formation:
January 2003
Durée:
40 heures
Staad Pro Version 3.0 (Formation)
Institut de formation:
Microcadd Philippines
Date de la formation:
May 2002
Durée:
40 heures
Autocadd Level 2 3D and Animation (Formation)
Institut de formation:
Autodesk - MicroCadd Philippines
Date de la formation:
June 2002
Durée:
40 heures
Expert report writing (Formation)
Institut de formation:
UAE Society of Engineers
Date de la formation:
September 2012
Primavera 6.0 (Formation)
Institut de formation:
UAE Society of Engineers
Date de la formation:
February 2003
Durée:
40 heures
Project Management (Formation)
Institut de formation:
Chicago Training Institute
Date de la formation:
July 2019
Durée:
40 heures