ELECTRICAL MAINTENANCE ENGINEER
TANZANIA ELECTRIC SUPPLY CO. LTD (TANESCO)
Total years of experience :14 years, 8 Months
Assignment: Installation of Lightning Mast at Mbinga, Songea,
Ludewa and Liwale Power Stations.
Location: Mbinga, Songea, Ludewa and Liwale Power Stations.
Dates 2011-2013.
Client Reference: Tanzania Electric Supply Co. Ltd (TANESCO).
Degree of Responsibility: Project Engineer, Feasibility study, designing of Mast, Designing Earthing System, Budgeting, supervision, installation.
Assignment: Installation of 11kV switch gears at Mbinga and
Ludewa Power Stations.
Location: Mbinga, Ludewa.
Dates 2012.
Client Reference: Tanzania Electric Supply Co. Ltd (TANESCO).
Degree of Responsibility: Project Engineer, Preparation of Technical Specifications and drawings, Preparation of bidding document, Evaluation and Negotiation of tender, attend factory acceptance tests, Preparation of installation budget, supervision, installation.
Assignment: Replacement of faulted 650kW alternator at
Mpanda Power Station
Location: Mpanda Power Station.
Dates: 2013.
Client Reference: Tanzania Electric Supply Co. Ltd (TANESCO)
Degree of Responsibility: Project Engineer, Responsible for Design; budgeting, mobilization, supervision, replacement
Assignment: Installation of 1.9MW alternator at Songea Power Station.
Location: Songea Power Station.
Dates: 2012.
Client Reference: Tanzania Electric Supply Co. Ltd (TANESCO)
Degree of Responsibility: Preparation of Bidding documents (Preparation of Technical Specifications), Evaluation and Negotiation of Tender, attending Factory acceptance Tests (FATs), witness installation.
Assignment: Major Overhaul of 650kW Generator Sets at all off grid
power plants.
Location: Kigoma, Songea, Mpanda, Mbinga, Biharamulo, Ngara, Mfia, Tunduru, Ludewa, Liwale, Somanga, Sumbawanga, Kasulu, kibondo, Mtwara and loliondo
Dates 2009-2013.
Client Reference: Tanzania Electric Supply Co. Ltd (TANESCO)
Degree of Responsibility: Dismantling, repair, clean, calibration, assembling and testing of electrical systems.
Other Experience: Preparation of annual budgets.
Producing accurate and reliable reports.
Contract management.
Tender Evaluation, negotiation and inspection
: Acting responsibilities as Manager thermal generation, Principal maintenance Engingeer and Zonal Generation Engineer.
1. Commissioning of all work places
2. Identification of Electrical Hazards
3. Inspect and Approve electrical installation drawings
4. Perform insulation Test, Continuity Test and earth Fault Test on
the machines and buildings at all work places
5. inspect and recommend measures to be taken for any electrical
accidents
6. Approve and award compliant certificates to work places
7. preparation of monthly and annual reports