Asst manager operation
Divine vidyut ltd
Total des années d'expérience :12 years, 11 Mois
• Operation of AFBC, CFBC, WHR Boiler, Operation of Turbine.
• Had done Boiler light up from field.
• Does Turbine rolling from DCS.
• Plant parameters optimization.
• Conducting periodic efficiency tests of the plant and of auxiliary equipments
• Daily basis calculations of Heat Rate, Monitoring losses and in turn prepare a action plan for improvement of the same.
• Examine plant auxiliary power consumption, analyze and prepare action plan for improvement.
• Monitor fuel receipt/consumption and prepare mass and energy balance. Carry out monthly physical verification of fuel stock
• Monitoring of various operational parameters and prepare exception reports to ensure efficient and safe operations of the Plant.
• Coordinate and conduct root cause analysis of various occurrences and prepare remedial action plan.
• Proposals for Plant Modifications/ improvements for enhancing the efficiency / reliability / safety etc
• Identify Training Need Analysis of the subordinates and accordingly suggest them for training programs for skill enhancement.
• Mentoring the subordinates on daily basis at their work place and improve them.
• Prepare daily meeting reports.
• Manage manpower.
• Reporting to General Manager
• Operation of AFBC, CFBC, WHR Boiler, Operation of Turbine.
• Had done Boiler light up from field.
• Does Turbine rolling from DCS.
• Plant parameters optimization.
• Conducting periodic efficiency tests of the plant and of auxiliary equipments
• Daily basis calculations of Heat Rate, Monitoring losses and in turn prepare a action plan for improvement of the same.
• Examine plant auxiliary power consumption, analyze and prepare action plan for improvement.
• Monitor fuel receipt/consumption and prepare mass and energy balance. Carry out monthly physical verification of fuel stock
• Monitoring of various operational parameters and prepare exception reports to ensure efficient and safe operations of the Plant.
• Coordinate and conduct root cause analysis of various occurrences and prepare remedial action plan.
• Proposals for Plant Modifications/ improvements for enhancing the efficiency / reliability / safety etc
• Identify Training Need Analysis of the subordinates and accordingly suggest them for training programs for skill enhancement.
• Mentoring the subordinates on daily basis at their work place and improve them.
• Prepare daily meeting reports.
• Manage manpower.
• Reporting to General Manager
• Operation of AFBC, CFBC, WHR Boiler, Operation of Turbine.
• Had done Boiler light up from field.
• Does Turbine rolling from DCS.
• Plant parameters optimization.
• Conducting periodic efficiency tests of the plant and of auxiliary equipments
• Daily basis calculations of Heat Rate, Monitoring losses and in turn prepare a action plan for improvement of the same.
• Examine plant auxiliary power consumption, analyze and prepare action plan for improvement.
• Monitor fuel receipt/consumption and prepare mass and energy balance. Carry out monthly physical verification of fuel stock
• Monitoring of various operational parameters and prepare exception reports to ensure efficient and safe operations of the Plant.
• Coordinate and conduct root cause analysis of various occurrences and prepare remedial action plan.
• Proposals for Plant Modifications/ improvements for enhancing the efficiency / reliability / safety etc
• Identify Training Need Analysis of the subordinates and accordingly suggest them for training programs for skill enhancement.
• Mentoring the subordinates on daily basis at their work place and improve them.
• Prepare daily meeting reports.
• Manage manpower.
• Reporting to General Manager
• Operation of AFBC, CFBC, WHR Boiler, Operation of Turbine.
• Had done Boiler light up from field.
• Does Turbine rolling from DCS
• Mentoring the subordinates on daily basis at their work place and improve them.
• Prepare daily meeting reports.
• Manage manpower.
• Reporting to General Manager
Operation of AFBC and WHR Boilers, Operation of Turbines, And handling of Syncronising Panel From Control Room.
Cleared all the 8 Semesters with GPA 7.87.