Commissioning Coordinator في petrofac
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ نوفمبر 2009

2009 - Till Date with M/s. Petrofac International as Commissioning Coordinator
a) For PDO Oman Harweel site
b) Presently For ADCO Abu Dhabi ASAB site
Notable Accomplishments
• At PDO Oman site, acted as main coordinator for Gross Air Leak Test and pressure testing of system N2He (Nitrogen Helium test) for whole plant along with

a) Line walk down for system checks as per the test pack requirement
b) SIMOPS
c) Tool box talk before pressurizing of system
d) Pressurization of system in stage manner
e) leak checking of system with mass spectrometer and rectification of leak.
f) Successfully & safely completed all test packs in given stipulated time and started plant with no leak.

• ADCO ASAB Abu Dhabi site responsible for

1) Acting as a Commissioning Manager during Commissioning manager R&R period.
2) Coordination of pre commissioning and commissioning activities related to CDS area.
3) Responsible for development of document preparation, review, updation and progress monitoring of the same for
• Pre commissioning / Commissioning procedure
• Operation Procedure for the plant
• Method of Statement and Task Risk Assessment for the job.
4) Responsible for SPIR review for commissioning, one year, two years and insurance spares.
5) Coordination of planning activity
• Planning activity in detail
• Man power and resource planning
6) Responsible for Development of
• Work procedure
• Method of statement
• Task risk assessment
7) Responsible for Pre commissioning and commissioning activity
• Line cleaning by air blowing, water flushing, chemical cleaning and lube oil flushing
• Clean spool policy
• Flange Management
• Nitrogen Helium Test
• Pre Installation testing of valves (TSO, PSV and control valves)
• Preservation of Equipment

Commissioning and Start up Co-ordinator في Equate Petrochemicals, Kuwait
  • الكويت
  • أغسطس 2007 إلى أكتوبر 2009

• Presently working with Equate Petrochemicals, Kuwait through Brunel as Commissioning & Start up Coordinator and successfully commissioned & started Ethylene Glycol plant ( EG2) on 19th Aug-2008. Now looking after commissioning of Marine Terminal Operation.
• Acted as a main controlling and coordinating authority for Mechanical; Electrical; Instrument and Analyzer team members along with contract man power of 300 employee.
• Instrumental in planning & executing of all pre commissioning, commissioning and maintenance activity.
• Responsible for developing commissioning & maintenance check sheets & procedures, commissioning spares, P & ID Checks, punch listing and conformance of the same along with day to day commissioning related problems.
• Providing technical support to the Project Manager Team in activities related to maintenance issues e.g. pre-commissioning, commissioning
• Acting as main communicating link between equipment supplier / licenser and plant management.
• Timely advice and necessary guidance to team members for safe execution of all activity.
• Responsible for commissioning and two years spares review; budgeting and controlling of commissioning and start up activity; manpower and resource work out.

Sr.Mechanical Engineer (Technical Advisor) في Shahid Tondgiooan Petrochemicals , Iran
  • إيران
  • أغسطس 2004 إلى أبريل 2007

• Acted as a Technical advisor for the commissioning of PTA (I & II) and PET(I & II) plants along with the establishment of maintenance system.
• Instrumental in planning & executing of all pre commissioning, commissioning and maintenance activity.
• Identified equipment design defect during commissioning and start up stage for below mentioned equipment and accepted by equipment supplier
i. Reactor feed pump
ii. Reactor air sparger control valve
iii. Conveying system hopper
iv. Rotary dryer discharge end assembly
v. Crystallizer Mechanical seal
vi. PET Plant hot conveying system
vii. Silo filter cage
• Responsible for plant de bottlenecking issue for reliable operation of equipment and plant.
• Acting as main communicating link between equipment supplier / licenser and plant management.
• Successfully developed and implemented standard commissioning and maintenance procedures along with risk base analysis for plant integrity.
• Acted as a Project Manager for CMMS system selection and implementation of the same.
• Timely advice and necessary guidance to team members for safe execution of all activity.

Sr.Manager Mechanical في Reliance Industries Limited
  • الهند
  • أبريل 1991 إلى أغسطس 2004

 Project coordinator of MEG, VCM, PVC, PE, PE Ducting
 Commissioning of MEG, VCM, PVC, PE, PE Ducting, PP Plants.
 Project coordinator for PVC Plant capacity up gradation from 300 KTA to 525 KTA
 Coordinator for equipment selection, procurement for PVC Plant & PVC Bagging plant capacity up gradation
 Project coordinator for PVC Bagging Plant capacity up gradation from 300 KTA to 525 KTA
 Team leader for PVC reactor bottom valve design changes for reliability enhancement
 Equipment reliability improvement on the basis of RCM Technique; Why-Why; Fish bone
 Generation of failure analysis reports in detail in case of my breakdown.
 Generation and monitoring of maintenance performance metrics as per the guidance of M/S AT Kearney, USA.
 Equipment spares management and follow-up with purchase dept and supplier.
 Nominated as HSE team member on complex basis for world class manufacturing practices related to SAFETY (Guided by M/S British Safety Council)
 Maintenance team leader specially for compressor overhauling of MEG plant for Oxygen Nitrogen, Re- Cycle Gas. Compressor also air compressor of air separation unit at the time of annual shutdown of MEG plant.
 Cost control and Budget monitoring
 ISO procedure development and Implementation
 Training and validation of new employees.
 Monitoring and expediting of plant expansion.
 Mechanical in charge for PTA I & II Plant.
 Project coordinator for PTA-III Plant.

Project Engineer في Indian Petrochemicals Limited
  • الهند
  • يونيو 1989 إلى أبريل 1991

 Ethylene Oxide / Ethylene Glycol plant (MEG plant); N2O2; Cracker plant and Power Plant and responsible for the, Project, commissioning and Maintenance activities like.
 Project coordinator for MEG Plant equipment selection and procurement.
 Mechanical team leader for MEG and Cracker plant commissioning and maintenance.
 Erection and Alignment of piping as per drawings for static and rotary
 Commissioning of rotating equipments.
 Alignment of supporting structures.
 Material Inspection and spares management for plant commissioning
 Quality checks, Welding inspection and NDT Testing
 Project Piping and consumable materials quality checks
 Coordination of day to day project activity with contractors
 Resource arrangement and its coordination for project requirement
 Development and implementation of maintenance system
Material

Engineering Officer في Searle (India) Ltd
  • الهند
  • يوليو 1988 إلى يونيو 1989

 Responsible Mechanical, Electrical, Instrument and Civil maintenance department
 Project coordinator for plant automisation, de-bottle necking and plant expansion
 Pharmatutical equipment capacity up-gradation
 Day to day maintenance and shut down planning
 Spares management
 Liasioning with government for plant expansion

Jr.Shift Engineer في Sarabhai Chemicals
  • الهند
  • يوليو 1981 إلى مايو 1988

 Responsible for plant shift operation and maintenance
 Responsible Mechanical, Electrical, Instrument and Civil department
 Responsible for plant expansion
 Pharmatutical equipment capacity up-gradation
 Day to day maintenance and shut down planning
 Spares management

الخلفية التعليمية

بكالوريوس, Mechanical
  • في M.S.University
  • يونيو 1987

1st Class Distinction with 67.24%

دبلوم, Electrical
  • في M.S.University
  • مايو 1981

Diploma in Electrical Engineering, 1st Class with 69.33%

دبلوم, Mcehanical
  • في M.S.University
  • مايو 1980

Diploma in Mechanical Engineering, 1st Class with 72.93%

Specialties & Skills

Maintenance Management
Management
Resource Management
Team Management
Completion
Plant Commissioning and Start up
EPC / Project Management
Plant Maintenance and Reliability