dinesh manani, Deputy Manager

dinesh manani

Deputy Manager

Howe india pvt Ltd (ADANI GROUP)

Lieu
Inde
Éducation
Baccalauréat, Civil Engineering
Expérience
18 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 6 Mois

Deputy Manager à Howe india pvt Ltd (ADANI GROUP)
  • Inde - Surat
  • Je travaille ici depuis août 2011

Construction of 600 meter long Transit Go-down with 1500 MT PEB structural steel shed.
•Construction of 4500KL underground central water tank with pump house.
•Construction of 5000 sqmt yard development for store area.
•Construction of 12.3 hector container freight station area for container berthing facilities with other utilities.
•Construction liquid tank farm: six number tank enclosure completed with quality, time and safety along with 169 No tank foundation, dyke wall, fire wall, TLF, pump house, TULF, pig station, slope tank, foam tank, tank anticorrosive layer, tank impervious layer, pipe support pedestal, storm water drain, Bituminous road work, area fencing, weigh bridge, fire water pump house, area development by laying paver, firefighting system for operation of liquid tank farm.
•Construction of ETP and STP treatment plant.
•Construction multipurpose marine jetty.

Job Responsibilities:-

•Preparation of work planning and submit to project manager.
•Manage resource and machinery as per site requirement.
•Prepare weekly contractor Progress report for weekly meeting.
•Prepare cash flow and CTC on monthly basis.
•Checking the Reinforcement Details as per approved drawings.
•Ensure the control of the construction process by dealing directly with the supporting staffs.
•Co-ordinate and regulate the activities of the Material Engineer, Quantity surveyor, Quality engineer etc. to ensure smooth functioning of the execution in concerned construction package.
•Check Quality of Material as per quality matrix.
•Estimate total quantity of project for CTC & other amendments quantity.
•Ensure Overall Quality of work during execution stage.
•Certify the running bill & final Bill submits by contractor.
•Using SAP module for booking of consume quantity.
•Checked reconciliation statement on monthly basis submitted by contractor.
•Prepare daily, weekly & overall progress report for work planning with manpower status.
•Certify BBS submitted by contractor.
•Ensure maintain pour cards daily basis.
•Ensuring that all assigned work is completed on time and within agreed budgets.
•Directly responsible for regulating the construction process as per stipulated specifications, standards, contract, etc.
•Prepare project wise capitalization sheet

EXECUTIVE ENGINEER à TORRENT POWER ENERGY LTD
  • Inde - Surat
  • juin 2011 à juillet 2011

Construction of VIP guest house by modification of container and architecture interior.

PROJECT ENGINEER à GUJARAT GAS COMPANY LTD (CONTACT EMPLOYEE)
  • Inde
  • septembre 2007 à mai 2011

Civil Construction of City Gas distribution system plant Projects at various locations.

SITE ENGINEER à M/s Modules Architect and Project consultant
  • Inde - Surat
  • janvier 2007 à août 2007

Civil Construction of City Gas distribution plant Project at Valia, Ankleshwar.

SITE ENGINEER à M/s OM ENTERPRISE
  • Inde - Surat
  • décembre 2005 à janvier 2007

Construction of residential and commercial project at surat.

Éducation

Baccalauréat, Civil Engineering
  • à SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY
  • juin 2005

B.E CIVIL ENGINEERING WITH FIRST CLASS,GUJARAT UNIVERSITY.

Etudes secondaires ou équivalent, 12TH STANDARD
  • à GUJARAT SECONDARY EDUCATION BOARD,GANDHINAGAR
  • mai 2001

12TH STANDARD,HSC

Etudes secondaires ou équivalent, 10TH CLASS
  • à GUJARAT SECONDARY EDUCATION BOARD,GANDHINAGAR
  • mars 1999

10 TH STANDARD,SSC

Specialties & Skills

Industrials
Marinas
General Construction
BUDGETING
CASH FLOW
CRITICAL THINKING
ENGINEERING
WORK PLANING
MACHINERY
BILLING
PROGRESS

Langues

Anglais
Expert
Hindi
Expert

Formation et Diplômes

SAP MODULE (Formation)
Institut de formation:
ADANI GROUP
Date de la formation:
September 2013
Durée:
8 heures
PROBLEM SOLVING TECHNIQUES (Formation)
Institut de formation:
ADANI GROUP
Date de la formation:
April 2014
Durée:
8 heures

Loisirs

  • PLAYING CRICKET
  • LISTENING MUSIC
  • BOOK READING