djamal kherraze, Production Engineer

djamal kherraze

Production Engineer

SONANGOL P&P IRAQ

Lieu
Algérie
Éducation
Master, Génie Mécanique
Expérience
12 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :12 years, 6 Mois

Production Engineer à SONANGOL P&P IRAQ
  • Irak - Mossoul
  • Je travaille ici depuis février 2023

Analyze well and production system performance based on comparing predicted versus actual production rates, water cuts, gas-oil ratios (GORs) and pressures at various points in the system to identify possible operating problems or system botlenecks.
•Record the production data and prepare the back allocation for each well, batery and station.
•Maintain the production database updated.
•Perform medium and long term decline curve analysis and forecasting.
•Implement a program of fluid sampling, production tests, pressure tests, production logging and other surveillance activities designed to understand and control well performance.
•Gather, quality control and maintain accurate data related to respective discipline and follow corporate guidelines for short- and long-term storage and retrieval of company data.
•Monitor chemical treatment programs and evaluate their efectiveness in mitigating such problems as scale formation, asphaltene and parafin deposition, corrosion, emulsions and sour gas contamination.
•Provide production and operation reports (daily, monthly & annualy)

Production Engineer à Sonatrach
  • Algérie - Hassi Messaoud
  • décembre 2011 à janvier 2023

Prepare matrix acidizing, wax removal programs
• Perform System analysis using simulators (Pipesim, Prosper)
• Implement of water and gas shut off technology
• Candidate selection, execution & evaluation of multistage hydraulic fracturing wells
• Build mechanical earth models 1D for frac purpose
• Artificial lift design (Gas lift, ESP, SPM, Jet Pump) using Pipesim software for production enhancement
• Electrical submersible pump design, installation and troubleshooting.
• Suggest perforation intervals based on logging to exploit best zones and depending on stress analysis for fracture initiation
• Technical evaluation of service companies’ equipment (Coiled tubing, Frac, wireline and production testing)
• Daily production surveillance using scada system

Éducation

Master, Génie Mécanique
  • à Université Mohamed khider
  • juin 2008

Specialties & Skills

Management
Team Spirit
Coaching
PERFORATION
SUBMERSIBLE PUMP
ARTIFICIAL LIFT
COILED TUBING
HYDRAULIC FRACTURING

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Arabe
Langue Maternelle
Français
Expert
Anglais
Expert