PROJECT DIRECTOR. à Namkwang international for engineering and construction, Angola
  • Nigeria
  • Je travaille ici depuis mai 2010

NamkWang for Engineering and construction.
· Monitor contract performance and compliance in accordance with the Project, contract management plan, risk management plan and organizational policies and procedures.
· Establish and maintain strong business relationships with stakeholders and suppliers including effectively managing contract enquiries, issues, disputes, variations, risks and undertaking negotiations with suppliers as required.
· Ensure customer satisfaction is a high priority and stakeholders receive responsive and proactive services where Agency representatives are engaged and feedback is sought.
· Research and analyze contract related information including supplier contract reporting, and provide reports regarding contract activity and performance (including Agency reporting).
· Manage allocated contract implementation and transition, including management of supplier and Agency activities
· Compose and maintain complex up to date across government contract documentation (including contract management plans), procedures, data and records to ensure timely communication to Clients and Consultant.
· Provide advice and support to the Category Manager and contract establishment process including identifying opportunities to improve procurement outcomes, efficiency and value for money.
· Provide leadership, advice and support to staff within the team
· PROJECTS ACHIVED:
1- OML 58 UPGRADES - POURT HACOURT NIGERIA The Project consist of the construction of 12 Buildings for the Staff of Total Company include All Services (Roads & Pipes). Value of the project 380million Usd,
Client TOTAL, EPNG
2- Turn Key Project in Luanda Angola, construction of Twenty Residential Building in the periphery of the Capital City, each building is from seven to 9 floors, Total Building Area of the project is about 100, 000m2 plus garden and landscape area swimming pools roads and all services, the project start from august 2011 to dec 2015, The designer and Architect of the project is Sigma Group, Owner Sonangol.

Project Manager à Shelter Group
  • Arabie Saoudite - Jeddah
  • novembre 2005 à mai 2010

· Working hard to reach resolutions to prepare time schedule with the planning engineer, quality control plan, mobilization and budgeting plan.
· Negotiating and managing all contracting arrangements.
· Identify procurement opportunities and ensuring these opportunities are evaluated and progressed.
· Clarifying goals with all interested parties.
· Evaluating the needs of customers and clients.
· Facilitating the re-negotiation of existing contracts.
· Managing invoices from generation to payment.
· Contributing to the business development of the company.
· Preparing All Claims and Variations.
· Making sure that all procurement and contracting activities are carried out in accordance with legislation & company policy.
· Monitoring the performance of staff and holding appraisals.
Construction of nine Buildings at KAUST PROJECT KSA with Saudi Oger from Mars 2005 to Jun 2008: Library Building, Research Lab, Applied Mathematics, Administrative Building, Engineering Sciences Hall, Conference Center, Auditorium, Parking Garage, Green House, Data Center.
While work on the master plan was being completed, 42, 000 stone columns were being drilled into the ground to stabilize the soil and bring it to a Condition that could support the weight of the buildings, then All Structural work was completed include Raft foundations with 2-meter height, Local concrete and steel with high levels of recycled content, Interiors finishes with low levels of volatile organic compounds (gypsum board, carpet tile, ceiling tiles, paints. Aluminum Cladding System with half of the Facades, and the rest with Stone Cladding.
Consultant: ARAMCO. 2 billion Saudi Riyals cost of the project.
4- Construction of one tower sixteen story building in king Faysal hospital city KSA from May 2008 to August 2010.
Project Consist of 1300m2 each floor with 18 studios serve as dorms for the staff of the hospital, post tension in all slabs concrete blocks for exterior walls and Gypsum board for wall and ceiling resilient mounting sound isolated material, raised floor access Italian ceramic tiles for bathrooms and kitchens granite counter top, Schiller system for A/C And curtain wall for all elevations.
Cost of the project 70 million Saudi Riyal, consultant Dar Al Riyadh.

Project Manager à ILDES
  • Liban - Beyrouth
  • mai 2000 à novembre 2005

· Monitoring the performance of staff and holding appraisals.
· Supporting senior managers in the development of risk and policy documentation.
· Safeguarding the company’s interests.
· Conducting investigations into any technical changes or contractual disputes.
· Define, maintain and improve the bid process of the Company.
· Managing contract staff.
- Construction of 250 buildings (3 to 4 floors each), duration of the project two and a half year, from May 2001 to October 2003 the Project Was Founded by the European Union,
Client: Owners of Properties in Chouf, Aley and Baabda Cazas, The project was Built under the
European union supervision and with high calibration of Measures.
Also Construction and finishing of 7 sports clubs (basketball, Volleyball, tennis) All covered with a steel construction Roof, dimensions 5.000 to20.000 seats each, duration of project: 1.5 years (December 2003 to July 2004), European union supervised the job

Project Manager. à Shelter Contracting
  • Arabie Saoudite - Arar
  • février 1996 à mai 2000

1- Construction of 2 Towers in Abu Dhabi, (1996 to Dec 2000), One is 24 floor in Hamad street the second one in Khalifa street was 27 floors, Dewatering system, piles and Raft foundation, precast slabs, curtain wall for 25% of the elevations, the rest is covered with Indian Marble, Italian Ceramic Tiles for living area 60x60, Terrazo tiles for Bedrooms and first quality Spanish porcelain in Bathrooms and Kitchens and gypsum ceiling in the reflected ceiling.
Shiller system for the A/C, PPR System for drainage and water supply system and Regular system for electrical work.

Self Employed à Gosh Bureau
  • Liban - Beyrouth
  • septembre 1992 à février 1996

Responsible for all aspects of projects, Architectural, Design, and studies, including development, administrative, technical, financial and management, involved in the construction of various projects.
Also provided specific studies and engineering services to other companies

Site Engineer à Norwood Engineering
  • Etats Unis
  • août 1988 à septembre 1992

Position: Site Engineer responsible for All Activity on the site, Land Surveying, Concrete Work for the
Foundation, Architectural Work and Mechanical Work for the construction of Five Villas In Norwood

Éducation

Master, Civil Engineer
  • à USJ
  • juillet 1988

Specialties & Skills

Project Management
Business Development
Contract Management
Risk Management
Developing Client Relationships
BUDGETING
BUSINESS DEVELOPMENT
CONSULTING
CONTENT MANAGEMENT
CONTRACT MANAGEMENT
CUSTOMER RELATIONS

Langues

Arabe
Expert
Anglais
Expert
Français
Expert

Adhésions

Order of Engineering Lebanon
  • Member
  • September 1990

Formation et Diplômes

ISO 9001 (Formation)
Institut de formation:
Training institute
Date de la formation:
July 2007
Durée:
70 heures
Project Management (Formation)
Institut de formation:
Dubai institutE
Date de la formation:
October 2005
Durée:
105 heures

Loisirs

  • Swimming, and Hunting