Site Engineer في Parsons International Ltd.
  • قطر - الدوحة
  • فبراير 2016 إلى ديسمبر 2018

Project : QN090 including QN005 Surrounding Al
Bayt Stadium (Al Khor)

The project comprises of the following;

• General site clearance and Demolition works.
• Roadworks around Al Bayt Stadium, Al Egda St. and part of the Coastal Road
Concrete paving blocks on foot paths.
• Passive and active traffic management inclusive of traffic signals, road
Markings, traffic signs and traffic controller.
• Foul sewer network to convey the Stadium complex foul sewer lines by open
Open trench and micro tunneling method.
• TSE line around the stadium and along the road linking to al Thakira road
And Coastal Road. Relocation of existing chambers along Al Edga street.
• Surface water network around the stadium and both side of Al Egda street
Using V-channel infiltration (swale)
• Potable water line in areas along Al-Khor road including protection to existing
Lines and relocation of some existing chambers.
• Construction of ducts and chambers such as SSD, ITS, Ooredoo, QAF.
• Street lighting around the Stadium, Al Edga Road and part of Coastal Road.


Project : DS131 Roads & Infrastructure in
Government Residential Division
In North of Al Wukair

The Project Comprises of the following;
● Roadworks inclusive of flexible pavements, pre-
cast concrete paver block
Pavements;
● Treated Sewage Effluent (TSE) distribution system
and utility service
● Foul sewer networks, interim sewage pumping
station and Rising main;
● Storm water and Ground water lines, Pumping
station and disposal
System Including Micro Tunneling, gullies,
manholes, trench soakaways
And deep recharge well facility;
● Potable water, electrical, telecom, QAF networks.
● Passive and active traffic management inclusive
of traffic signs, road
Markings, traffic signal and traffic controller.
● Ducts and chambers for the intelligent
transportation system (ITS
Including ITS infrastructure interface.
● Ducts and chambers for the security system
departments (SSD) including
SSD Infrastructure Interface.
● Landscaping including irrigation networks,
lighting features

Duties and responsibilities:
• Coordinate his direct activities with the other
engineers and members of the construction
supervision team;
• Assist the Resident Engineer in reviewing of
method statement, shop drawings, and other
activities;
• Maintain the daily diary and the daily reports by
the inspectors;
• Coordinate with the Contractor engineers on
scheduling and application of resources;
• Direct, assist and monitor the performance of
the inspectors and surveyors as applicable;
• Attend special meetings with the Contractor,
subcontractors and other parties related to his
work;
• Ensure accuracy and completeness of records;
• Ensure safety goals are achieved on the project
and oversee implementation of safety
procedures on the project;
• Act positively, and participate in all health and
safety issues at site, as required by the Senior
Resident Engineer, Resident Engineer and the
Project Safety Representatives;
• Provide all necessary on-site direction and assist
the Resident Engineer on issues arise on site
with respect to drainage, sewerage & associated
items;
• Report back as necessary to the Resident
Engineer/ SRE as applicable;
• Check and measure the performed work in his
line of work, record and assist the Resident
Engineer to display progress vs. programmed
work;
• Ensure correctness and completeness of ‘as-
built’ drawings within his line of work.

Civil Engineer/Site Engineer في Iproplan® Planners Co. Ltd. consulting engineers and architects
  • قطر
  • يونيو 2010 إلى يوليو 2015

Project Description:

SEWER EXTENSION AND HOUSE CONNECIONS AT AL JAZEERA & QATAR TELEVISION STATION

The project comprises of the following:

• 615 m micro tunnelling works using 300mm dia. GRP lined
RC jacking pipes
• 837 m pipe laying works using 300mm dia. and 200mm
dia. VC pipes
• Construction of 30 GRP lined manhole
• Construction of 10 house connections using 200mm and
• 150mm VC pipes including 9 inspection chamber
• Reinstatement of roads

Client: ASHGAL


Project Description:

CONSTRUCTION OF DOHA AND RYYAN SEWERAGE IMPROVEMENTS TO EXISTING TSE NETWORKS. CP 731

The principal elements of work to be constructed and set to work in various areas in Doha include the following:

• Replacement of 12.5 km AC pipes, with D.I. and HDPE
pipes with diameter ranging from 100mm to 600mm by
Diameter ranging from 100mm to 600mm by open trench
and pipe bursting.
• Replacement / Installation of all chambers such as Air
valves, Washout, Distribution and Gate valves
• Reinstatement work for roads and center median.

Client : ASHGAL


Project Description:

CONSTRUCTION OF SEWERAGE FOR VARIOUS AREAS IN WAKRAH - Package 3 CP 751/3

The Project comprises the construction of new sewers to extend the sewerage network in various locations within WAKRAH. Construction of approximately 8.855 km of 200mm diameter VC pipes sewer line and 1.116 km of 300mm diameter VC pipe sewer line in trench
• Construction of 283 GRP lined manhole.
• Reinstatement of 9.971 km asphalt road using asphalt
paving machine
• Construction of 417 house connections including 5.3km of
150mm VC lateral connections.

Client : ASHGAL

Project Description:

CP 747/1 DESIGN & CONTRUCTION OF 1200 TRANSMISSION MAINS TO AL RAKHIYA FARM FROM DOHA WEST SEAWAGE TREATMENT PLANT

• Link along Salwa Road from existing twin 800mm branch
from Doha West STW to Al Rakhiya Farm consisting of 30
km. 1200mm diam. GRP Main
• Link to existing Sand Plant QNCC consisting of 720 m
500mm diam. GRP main and vertical riser
• TSE Mains - Doha West STW to Interchange 42 consisting
of 17, 773m. of 1200mm diam. GRP TSE mains in trench, 1
connection chamber, 2 No. valve chambers, 20 No.
chambers for washouts, 21 No. air valves, 10 No. isolation
valves, future tees and flow meters including power supply
and telemetry links. Average chamber size 5.30 m x 5.80 m
• TSE Mains - Interchange 42 to Al Rakhiya Farm consisting
of 11, 828m. of 1200mm diam. GRP TSE mains in trench, 2
No. valve chambers and 7 No. chambers for washouts, 12
No. air valves, 4 No. isolation valves, future tees and meter
including power supply and telemetry links.
Average chamber size 3.40 m x 4.00 m
• TSE Mains - Feed pipes from TSE main to QNCC
consisting of 4625m of 500mm diam. GRP TSE mains in
trench, 2 No. valve chambers and 2 No. air valves including
power supply and telemetry links.
Average chamber size 3.40 m x 5.0 m.

Client : ASHGAL


CP 747/2 DESIGN AND CONSTRUCTION OF 1000 TRANSMISSION MAINS FROM IC 42 TO IC 62

• TSE mains along Salwa Road from IC 42 at branch from
1200mm diam. Main to IC 62 consisting of 21.50km. of
1000mm diam. GRP main.
• Connection to QPMC sand washing plant tank consisting of
3.80km. of 500mm diam. GRP main.
• Includes instrumentation, fibre optic cables, air valve,
washout, flow control valve and connection chambers and
flow meters including power and telemetry supply.
• Micro-tunneling works including access shafts and
chambers.

Client : ASHGAL

QA/QC Engineer في Al Jaber Trading and Contracting Company
  • قطر
  • ديسمبر 2009 إلى مايو 2010

Project Description
BARWA COMMERCIAL AVENUE (Infrastructure Works),

pipe laying for 9km foul sewer line varies up to 315mm dia. uPVC pipe, 83 No. Manholes GRP lined, and 9 km. potable water line varies up to 250 mm dia. HDPE, including house connection with chambers, 9 km road works including road gullies and soak away line and 9 km retaining wall with height varies up to 2.5 m.

Job Description
Assigned as Quality Assurance Engineer to strictly supervise the construction of foul sewer line, potable water line, soak away line and other civil works.
Ensures implementation of Work Procedures by conducting regular inspection of work.
Review/approval of materials and other related documents to initiate corrective actions and comments.
Ensuring compliance with the Project Specifications, Drawings, Standards and other Codes
Performed Surveillance Report (SR) and Logbook in accordance with approved plans and conformed to the Project Standards and Specifications.
Issuing preventive/corrective action to be taken to clear the Quality Deficiencies is observed.
Performed Inspection / witnessed the test on the day as per Quality is concerned.
Counter-checking the Survey Reports submitted by the Construction to establish the Excavation Layout of the Structures and other related civil works to be survey and controlled.

QA/QC Engineer في Monolith Construction/ Vision Building Materials
  • قطر
  • ديسمبر 2007 إلى نوفمبر 2009
Civil Engineer في Local Government
  • الفلبين
  • مايو 2002 إلى يونيو 2007

technical consultant of Community Based Resource Management Project

Quality Control Engineer في Populaire Group PTE. Ltd
  • مارس 2000 إلى أبريل 2002

Project Description
Construction of Seagull Complex, 2 storey commercial complex, gross floor area 12, 800 m2, Including 180m sewer line VC Pipes of dia. 300mm. with 4 GRP lined manholes and house connections, potable water line using D.I. pipe, landscaping and parking areas.

Job Description
Direct activities for the developments & maintenance of quality standards
Prepare project monitoring report and method statement.
Conduct regular session/meeting regarding quality standard
Develop & initiate standard method of inspection and evaluation of work.
Assist QC manager establishing, implementing and maintaining the quality management system.
Analyze failure, corrective and preventive action to respond to clients complaints.
Create and maintain company quality documentation and quality procedure.
Coordinate with the consultant regarding daily inspection of work, issues and other matters pertaining to quality and progress of work.
Tabulates data concerning materials or products quality and reliability
Interpret Plans and Specification.

Civil Engineer في Qualistronic Builders
  • الفلبين
  • مايو 1995 إلى يناير 2000

Project Description
Construction of 6.2 km Access road going to Presidents Bridge program project including 3 water spillways and 1.5 km slope protection ripraps
Construction of 7.5 km Pili diversion road in Camarines sur Philippines with varying slope protection along sides.
Construction of LCC Mall site development project in Naga city Philippines with a total area of 16000 sq.m including drainage system, electrical, landscaping works and fire hydrants.

Job Description
Direct activities for the developments & maintenance of quality standards
Prepare project monitoring report.
Conduct regular session/meeting regarding quality standard
Develop & initiate standard method of inspection and evaluation of work.
Tabulates data concerning materials or products quality and reliability.
Interpret Plans and Specification.

College Instructor في University of Saint Anthony
  • الفلبين
  • يونيو 1994 إلى مارس 1995

الخلفية التعليمية

بكالوريوس, Bachelor of Science in Civil Engineering
  • في University Of Nueva Caceres
  • مارس 1993

6. EDUCATION: Institutions:

Specialties & Skills

Project Supervision
CONSULTING
ENGINEERING
MICROSOFT WORKS
QUALITY CONTROL
SPECIFICATION

اللغات

الانجليزية
متمرّس