edzon Lejano, 2d designer

edzon Lejano

2d designer

Kobeco Concept

Lieu
Philippines
Éducation
Baccalauréat, Architecture
Expérience
8 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :8 years, 6 Mois

2d designer à Kobeco Concept
  • Qatar - Doha
  • novembre 2014 à juin 2015

Architect- draftsperson
• Drafts technical drawings for production.
• Assist the 3d designers in converting 3d designs to shop drawings.

Architect-Construction Supervisor à METROCON CONSTRUCTION AND DEVELOPMENT CORP
  • Philippines
  • septembre 2012 à juin 2014

Supervises the whole construction operation of the project work site
•Coordinates with the client in terms of adherence with the implementation of the construction plans
•Coordinates with the purchaser in regards to materials delivery to the work site
•Instructs the leadman and foreman in actual variation of the implementation of the project from the working drawings as per project flow.
•Prepares weekly accomplishment report in regards to construction updates.
•Prepares daily and weekly activities in conformity of project schedule
•Coordinates with Project management towards the implementation of certain activities
•Coordinates with suppliers in acquiring the respective materials to be used in the project
•Implements construction supervision within the project site.

Project handled covered:

•SO RESIDENCE- Multinational Village Paranaque City

Project In charge à NEW CONTRACTORS CONSOLIDATED RESOURCES INC
  • Philippines
  • juillet 2011 à mai 2012

Implements construction supervision within the project sites.
•Prepares Daily Activities and Monitors daily progress of the construction operation as per implementation.
•Prepares weekly manpower payroll
•Coordinates with the Project Management and Project Architect in terms of implementing the conformed Plans.
Projects handled and covered:
•The District Hotel and Resort, Station 2, Boracay Island, Malay Aklan
•The Ecoville Resort, Boracay Island, Malay Aklan
•Azul Hotel and Resort, Station 1, Boracay Island, Malay Aklan
MASAITO DEVELOPMENT CORPORATION (HOUSING AND LAND DEVELOPMENT)
11TH FLR., PHILIPPINE AXA LIFE CENTER AYALA cor. BUENDIA, MAKATI CITY

ARCHITECTURAL DESIGNER à Masaito Corporation
  • Philippines
  • octobre 2010 à juin 2011

Prepares technical and shop drawings as required for the project implementation
•Ensures quality drafting workmanship in conformity with the departments regulations
•Coordinates with the Project Architect, Structural Engineer and Project Engineer in developing a more cost effective design for the project.
•Revise and edits technical and shop drawings as per instruction by the Project Architect.
Projects handled and covered:
•2nd ave. Gate Vallejo Place Ph.4 - Design conceptualization
•House Model 90.00, 110.00 and 94 sqm.- revision and addition of design.
•House Model Sabrinah- Revision extension of design.
•Various lot layout plotting for homeowners
•Vallejo place phase 3 and 4, Springfield, bellazona( aragon, castille, Navarre)

PROJECT COORDINATOR/SITE ARCHITECT à J..D. bernardo construction Corporation
  • Philippines
  • janvier 2009 à octobre 2010

Supervise and manages the implementation of masonry finish within the construction of the project.
•Prepares weekly accomplished billing statement for the contractors as per milestones of the project.
•Prepares Bill of Materials for the operation of the construction as per Phase to be submitted to the developer.
•Coordinates with the Project-in-Charge in regards to Overall Construction operation.
•Drafts revision in shop drawings as per implementation of the project.
PROJECTS HANDLED AND COVERED:
•EL HARDIN DEL PRESIDENTE 2- a high-end multi storey residential facility developed by MEGAWORLD CORPORATION

JUNIOR ARCHITECT à AMLAK CONTRACTING CO.W.L.L (DESIGN BUILD)
  • Qatar
  • octobre 2008 à décembre 2009

Supervises overall construction operation in conformity of the technical specifications provided by the principal architect.
•Drafts schematic designs to be converted into final working and shop drawings.
•Provides conceptual design as per adaptation to Islamic idealism and culture.


LANDBANK OF THE PHILIPPINES HEAD OFFICE (PROJECT MGT., ENG’G. DEPT)
MALATE MANILA

ARCHITECT
  • octobre 2007 à octobre 2008

Incorporates modern layout and design of various banks in accordance to the end user’s needs.
• Inspects various banks facility situations and coordinates with the bank manager together with its regional administrator to conform with their spatial requirements and develop an expansion for their respective branches.
PROJECTS HANDLED AND COVERED:
•LANDBANK OF THE PHILIPPINES- South Luzon Area Branches
•LANDBANK OF THE PHILIPPINES- Mindanao Area Branches

OCB+Architects ASSOCIATES (ARCHITECTURAL FIRM

PROJECT COORDINATOR à Antel Bldg. Ortigas Center
  • Philippines
  • juin 2006 à septembre 2007

/ DRAFTSMAN
•Manages and anticipates adherent and unforeseen issues for minimizing risks
•Collaborated with the principal architect to ensure specification adherence
•Designed presentation drawings and drafts shop drawings for construction

Éducation

Baccalauréat, Architecture
  • à Technological Institute of the Philippines
  • octobre 2004

Best in thesis. Top ten in pre Board exam.

Etudes secondaires ou équivalent,
  • à University of Santo TomasInfant Jesus Academy
  • mars 1999

,

Baccalauréat, Elerctronics technology-Electronics and communications negineering
  • à University of Santo Tomas
  • mars 1999

courses: Dean’s Lister Electronics technology Course

Etudes secondaires ou équivalent,
  • à Infant Jesus Academy Russet Stree
  • mars 1995

Primary education:

Baccalauréat, Architecture
  • à Technological Institute of the Philippines
  • mars 1991

TERTIARY:

Specialties & Skills

Adobe Photoshop
MS Office tools
SketchUp
AutoCAD
Project Management
CONCEPTUAL DESIGN
ARCHITECTURE
BILLING
LAYOUT DESIGN
MATERIALS MANAGEMENT
MICROSOFT OFFICE
PROJECT MANAGEMENT
SPECIFICATION
SUPERVISORY SKILLS

Langues

Filipino
Expert

Loisirs

  • driving, biking swimming