ehab fathi abbas atia, الخبرات العملية

ehab fathi abbas atia

الخبرات العملية

الخبرات

Location
Egypt - Cairo
Education
Bachelor's degree, Architecture Department
Experience
24 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :24 years, 5 Months

الخبرات العملية at الخبرات
  • Egypt - Cairo
  • June 1990 to October 2014

- Auto CAD 2010 2D - 3 D
- PRIMAVERA PROJECT PLAANNER 3.1



22 years in the construction work continued with the major
Egyptian companies and Saudi Arabia

Review of contract documents-
- Preparation of the plan target (weekly - monthly) for the project and follow-up Study the cost of the project and work on cost control
The preparation of financial claims and temporal-
Follow-up to the time schedule of the project and updated- - Monthly preparation of the report of the project
Prepare and review Invoices of the owner and the subcontractors-
-Negotiate WITH SUB-contractors Have best prices and ending the contracting procedures
Review Of Work Shop Drawings and As Built-
Coordination All Project Disciplines
Experience record:

OWNER at Katib &Alami ASA Engineering consultants
  • Egypt - Cairo
  • June 2011 to May 2014

• The period from June 2011 - Till now
Engineering work at the Katib &Alami ASA Engineering consultants
Project: PKG # 12 ( D) Uptowen Cairo Project
Title: H/Q Uptown Cairo - Mokattam
OWNER: EMAAR MISR
Description: being the construction supervision consultant of residential
villages (H, J & K) located in Uptown Cairo Project, to exhibit
overall project situation and highlight critical issues that may
affect progress, quality and project budget, and also to assess
contractor performance in compliance with construction contract
stipulations and give recommendation when required.

مدير المكتب الفنى بمشروع كابيتال بيزنس بارك at مجموعة شركات درة للمقاولات
  • Egypt - Cairo
  • March 2007 to April 2011

• The period from March 2007 - April 2011
Engineering work at the company for Reconstruction and Development "CRC - Dora" as the Director of technical office in the following projects: Project: Construction of office building (Capital Business Park)
Title: Sheikh Zayed City - Sixth of October City
OWNER: Arab Company for Development and Housing
(A. D. H) group of Companies Dora
Consultant: Khatib & Alami - ASA
Description: The project consists of five the number of
Administrative buildings And the number 2 building hotel and
Cinema hall and restaurants Gymnasium
Value of the project: 170, 000, 000.00 LE


Project: Construction of building my hotel (GID)
Title: Sixth of October City - Fayoum Roads
OWNER: General Intelligence
Consultant: Office Decor (m. Algonemy Omar)
Description: Office building is servicing component of
The multi-purpose hall, libraries, exhibition
Halls and classes, educational and hotel Rooms
Value of the project: 80, 000, 000.00 LE

General Coordinator at Saudi & Co
  • Egypt - Cairo
  • January 1999 to February 2007

• The period from January 1999 - February 2007

Work Urban Development Company (Saudi & Co.) as
The Director of technical office in the following projects:
Project: Construction of 53 residential villa complex Rawas
Title: Sixth of October City
OWNER: Al Rawas Trading and Contracting
Consultant: Office of the consulting firm - M / Medhat Abu-Zeid
Description: component of 53 villas with different models on an area of ​​30
Acres and the implementation of all the work Concrete and
Exterior finishes, and all networks
Value of the project: 25, 000, 000.00 LE
Project: the construction of terminal 3 Fairgrounds
Title: Nasr City
OWNER: General Authority for Investment and Free Zones
Consultant: Academic Center for Design & Engineering - Dr. Hammad
Description: The building consists of two floors on an area of ​​4000 m 2 has
Been implementing a system of concrete the previous stress
Was the implementation of all internal and external finishes and
The Establishment of all internal networks (Electrical - Air
Conditioning - The Fire Alarm - CO2 - FM - Cameras -
Monitors View) the general location (for the Landscape - Road)
Value of the project: 16, 000, 000.00 LE
Project: Factory COPAC (for the production of polyethylene)
Title: Sixth of October City- Third Industrial Zone
OWNER: Cairo Company for the manufacture of cardboard - COPAC
Consultant: Office of the sabur
Description: The project consists of building the administrative component of
The four roles and the factory has been implemented by the
Structure of a metal sub-contractor Zamil.
Concretes have been implemented and Finish all acts of
Internal and external networks (roads - Electricity - Air - Fire)
Value of the project: 50, 000, 000.00 LE
Project: develop and renew Eye Research Institute
Title: Giza
OWNER: the Ministry of Health
Consultant: Office of Integrated Studies
Description: the project development and renovation of the ground floor and
First floor and the implementation of all the work of interior
Finishes and all Business networks (Electricity - Air - Fire)
Value of the project: 7, 000, 000.00 LE
Project: Construction of building Assembly of boys of my children
Title: Maadi - Cairo
OWNER: Association my children
Consultant: Office of Dr. / Tarek Fathi T. H. E
Description: Description of the project consists of building four roles of
Service area of ​​700 m 2 has been the implementation of all the
Work of concretes and finishes Internal and external and all acts
Of internal and external networks
Value of the project: 4, 000, 000.00 LE
Project: establishing the villages of Laseanda tourism
Title: Ras Sidr- Egypt
OWNER: Bahrawy Company for investment in tourism
Consultant: Office Kimit Consultant - Dr. / Aly Sabit
Description: Implementation of the number of 62 villas on three slopes -
Complete finishes - the implementation of the service area of the
Village tourism, which includes a water treatment plant and
Desalination plant and the cistern tank and balancing all the work
Was carried out Public site
Value of the project: 17, 000, 000.00 LE
Management of the company have been working in the following sections
General Coordinator for the following projects:
1 - Draft implementation of an administrative building in the field of Saad Zaghloul, Consisting of ten roles were implemented support aspects of the drilling system of ( (Diaphragm Walls with Bauer Egypt up to the depth of the establishment in 23 m.
2 - Draft Day Surgery Hospital gardens
3 - Tower Mazloum liberalization administrative Street Dokki
4 - VIP Marsa Alam - Luxor

Management of business development and project contracts Work was the management of business development and contracts for projects in The following areas: 1 - Follow-up projects that put on the Internet in the Arab States
2 - the follow-up projects that put through the offices of the Advisory
3 - to conclude contracts on the projects assigned to the company

Office Consultant at مكتب الطلائع للإستشارات الهندسية
  • Saudi Arabia - Albaha
  • January 1995 to December 1998

• The period from January 1995 - the end of December 1998
Work in Saudi Arabia - Office Consultant - Design and implementation of follow-up phases of buildings
- The work of all engineering design of the administrative buildings and apartment buildings and villas.
- Supervise the implementation of the work of the administrative and residential buildings and villas.

إشراف على تنفيذ المشروعات وإعداد المستخلصات at شركة المقاولون العرب للقطاع الإستثمارى
  • Egypt - Cairo
  • February 1993 to December 1994

• The period from February 1993 - the end of December 1994
Working in the Arab Contractors Company (private investment) in the supervision of the following projects: 1 - Construction of Port Said Theatre School in Zamalek.
2 - Staff housing (an apartment building, a mosque, an area of ​​500 m 2) for the
Drainage station Al Salam City
3 - staff housing (an apartment building, a mosque, an area of ​​300 m 2) for the
Drainage station north of Shubra - Bahtem
4 - The project of establishing an integrated school (Primary - Prep - secondary) -
Monofia City

اشراف وتنفيذ المبانى at المكتب الهندسى للمقاولات
  • Egypt - Cairo
  • December 1991 to July 1993

• The period from December 1991 - the end of January 1993
Establishment of a contracting company (general partner) has been implemented the following projects:
1 - Finishing works (internal Paints - Ceramic - Sanitary works) for 10 residential building from a company EGYCO for victory and buildings in the housing project Zahraa Nasr City.
2 - The work of a healthy internal and external to the 5 apartment building from a Company EGYCO for victory and buildings in the project of a residential Compound (b) in Sheikh Zayed City.

• The period from March 1991 - the end of November 1991
- Upgrading and recording the impact of the Islamic mosque Mahmud Kurdish region Muizz Fatimid and the preparation of graphics for the (horizontal projections - and vertical sectors - and interfaces - and details of the cornice and ornaments and all the engravings and decorative walls, ceilings and floors) for preparation of six months.

2 - raising and record the impact of the Islamic mosque in place of the mountain citadel of Saladin and the preparation of graphics for the (horizontal projections - and vertical sectors - and interfaces - and details of the cornice and ornaments and all the engravings and decorative walls, ceilings and floors) for preparation of three months

Education

Bachelor's degree, Architecture Department
  • at Helwan University
  • January 1990

Bachelors of Engineering - Architecture Department Helwan University - 1990 Grade - (Acceptable) in all Years Grade - ( (Acceptable) In Project

Specialties & Skills

Punctuality
Working Under Pressure
Customer Facing
التعامل مع الآخرين
Administration
ASSEMBLY
AUTO BODY
BODY ENGINEERING
BUSINESS DEVELOPMENT
ENGINEERING DESIGN
FINISHING

Languages

Arabic
Expert
English
Expert

Memberships

جمعية المهندسين
  • عضو عامل
  • May 2007

Training and Certifications

IPMA (Training)
Training Institute:
الجمعية الهندسية
Date Attended:
April 2007
Duration:
48 hours

Hobbies

  • متابعة ماهو حديث
    زيارة المعارض والإطلاع عاى ماهو جديد- حضور الندوات