Total Years of Experience: 12 Years, 8 Months
August 2013
To Present
electrical engineer
at hermic ltd
Location :
Iraq
Central processing facilities and power plant maintenance. Working as a Electrical engineer (Operation and Maintenance) in Halfaya Oil fields, CPF (Central Processing Facilities) and 24MW (8MW*3 GT) Siemens power plant with HERMIC LTD (Petro china
July 2015
To Present
Electrical Maintenance Engineer
at P.N.Electricals
Location :
India - Chennai
• Handled the Pre-Commissioning and Commissioning of :
Power Transformers, 33KV switchgears, 6.6KV switchgears and 415V switchgears.
• AC UPS systems and Battery Banks
• Testing of HT power cables
• Pre-Commissioning and Commissioning of electrical systems in well pads
• Preparing and submitting all Inspection Test Reports (ITR)
• Ensured adherence to the permit for work systems as per electrical safety rules
• Ensuring all activities are performed with in the specifications and quality
• requirement
• Ensuring that appropriate quality records for each activity carried out are documented and filled
• Punch listing of completed works and monitoring non conformities
• Leading and monitoring the performance of team members to ensure efficiency in project and meeting of production target as on time
• Identifying the areas of quality and taking steps to correct and prevent the occurrence
• Hand over the systems to operation team.
Power Transformers, 33KV switchgears, 6.6KV switchgears and 415V switchgears.
• AC UPS systems and Battery Banks
• Testing of HT power cables
• Pre-Commissioning and Commissioning of electrical systems in well pads
• Preparing and submitting all Inspection Test Reports (ITR)
• Ensured adherence to the permit for work systems as per electrical safety rules
• Ensuring all activities are performed with in the specifications and quality
• requirement
• Ensuring that appropriate quality records for each activity carried out are documented and filled
• Punch listing of completed works and monitoring non conformities
• Leading and monitoring the performance of team members to ensure efficiency in project and meeting of production target as on time
• Identifying the areas of quality and taking steps to correct and prevent the occurrence
• Hand over the systems to operation team.
July 2015
To September 2017
ELECTRICAL ENGINEER
at P.N.ELECTRICALS
Location :
India - Chennai
4 X 25 MW Powerplant Substation Electrical Installation (Extension project) and Shutdown Work .