Estimation Engineer
Elenco
Total years of experience :7 years, 10 Months
· Assume other duties as may be required from time to time.
· Optimization of tender price.
· Preparations of contractual and technical qualification.
complied technical & commercial offer.
· Correspondence with various vendors & sub-contractors for
prepare/review bid clarifications as required.
· To actively participate in all bid clarification meetings and
reports.
· Attend Site surveys as required and prepare/publish site survey
quotations to ensure compliance and competency.
· Prepare/review technical and commercial evaluation of all vendor
· Prepare/review MTO’s (if required) and float RFQ’s
· Correspondence with Client for technical clarifications.
· Perform FEED for the estimation purpose as and when required.
specifications, codes, and standards.
· Conversant with the design documents such as Drawings,
interest; Checklists for discussion in Bid & Client meetings
from previous bids or projects for similar jobs; Expressions of
Contingency Analysis; Benchmarks based on historic data generated
· Prepare/review as necessary, Basis of Estimate documents;
· Analysis of tender documents and deliverables.
· Preparing competitive proposal.
· Competent in Tendering for various type of projects.
Created 4 aircon projects for In-building solutions that lead to project implementation at non-PLDT
building that increased the sales up to 8%
• Created 47 aircon projects at various sites to support the TNT Phase 1 project that increased
implementation rate to 85%
• Managed aircon projects in 22 municipalities to comply with government requirement that lead to
support free wifi access for the students
• Managing and monitoring over 110 aircon projects to augment the equipment expansion for TNT Phase 2
project
• Managing and monitoring DC power plant project to support the equipment expansion that lead to more
equipment energization
• Managing and monitoring EE projects to support the equipment expansion that lead to more equipment
energization
• Managed changes to project scope, schedule and cost using appropriate verification techniques.
• Conducting site inspection that increased the rate of certainty to provide actual site requirement
• Coordination with site owners/stakeholders to verify site requirements
• Monitoring of site facilities to ensure safety and to complain with the company and government
standards
• Checking of Engineering plans submitted by Contractors to ensure that it meets the site requirement and
company standards
• Managed 260 colocation projects that generated an income
• Prepared Cost Estimates based on UPS that ensures Project cost is within the budget
• Conducted genset testing that ensured new gensets passed the acceptance test prior to delivery on site
• Coordinate internal resources and third parties/vendors for the flawless execution of projects.
• Ensure that the projects are delivered on time and within budget
• Report and escalate to management as needed
Created over 35 Aircon detailed engineering plans with minimized cost
• Trained 1 engineering assistant during company expansion
• Created 2 aircon projects for In-building solutions that lead to project implementation at non-PLDT
building that increased the sales up to 5%
• Managed colocation projects that generated an income
• Managed changes to project scope, schedule and cost using appropriate verification techniques.
• Developed new process for colocation projects
• Conducted site inspection
• Coordinated with site owners that increased the rate of final site requirement
• Prepared site inspection report
• Prepared engineering plans
• Prepared Cost Estimates
• Coordinated Procurement for Project Awarding
• Conducted meetings for Project Turn Over
• Conducted genset testing that ensured new gensets passed the acceptance test prior to delivery on site
• Ensure that the projects are delivered on time and within budget