emad emara, Head of Mechanical Department

emad emara

Head of Mechanical Department

HME Hilarion Engineering Consultants

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, power
Experience
37 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :37 years, 5 Months

Head of Mechanical Department at HME Hilarion Engineering Consultants
  • United Arab Emirates
  • My current job since March 2006

Al Jubail Fish Market, Sharjah
Al Jawharah Tower, Jeddah KSA, B+G+3P+42
Al Habtoor Motor Tower, Dubai Marina - 2B+G+37
Manhattan Residential Tower, JVC Dubai - 3B+G+17
Delta -1 Residential Tower, Dubai Marina - 2B+G+20
Delta -2 Residential Tower, Dubai Marina - 3B+G+19
Soccer Residential Tower, Dubai Sports City, 2B+G+23
Grand Hyatt Hotel, Beirut Lebanon, 350 Room
Sea View Hotel, Palm Jumeirah Dubai, 330 Room
District Cooling Plant, Ras Al Khaimah
Muscat Airport Catering facility
G+ 9 Office Building in Ras Al Khaimah
Ritaj Residential Buildings, DIP Dubai
G+M Office Building and Factory
2B+G+M+3 in Garhoud
Royal Oman Guard Camp

senior design mechanical engineer at drake&scull international
  • United Arab Emirates
  • February 2005 to February 2006

Senior design Mechanical engineer working on the design of “Dubai Festival City District Cooling Project ”(50000 T.R)

Head of Mechanical Department (Cairo Office) at SAUDI BIN LADIN GROUP ” - A B C - Jeddah
  • Saudi Arabia
  • February 2004 to February 2005

working on the Shop drawings of the “ Development of King Abdul Aziz Endowment project ” for the Holy Mosques Mekkah Al Mukarramah ( 42000 T.R )

Head of HVAC Department at UNITED CONSULTANT OFFICE
  • Egypt
  • March 1999 to June 2003

Working on the design, Workshop drawings and supervision of The “Meridian Luxor Hotel project” (1200 T.R). And just we finished the drawings we charged to responsibility of execute the project through the owner (self executed), the work included purchased the equipments, supply and installation of piping networks, valves, ductwork, control, testing, commissioning of project

senior design hvac engineer at SAUDCONSULT MISR
  • Egypt
  • June 1995 to March 1999

Working on the design concept, calculations and design drawing and the preparation of tender documents related to the air conditioning and refrigeration works for the following projects.

A. Arriyadh Development Authority \{Arriyadh Courts Complex Project\}.
B. AL MADANI HOTEL. AL HARAM Central area - Madinah.
C. RIYADH TECNICAL COLLEGE. RIYADH, SAUDI ARABIA.
D. Real Estate Development Co., Ltd.
\{Salman Bay Village Project\} - Jeddah
E. AMIRI PALACE. DAMMAM, SAUDI ARABIA.
F. Fathi Taleb Residence - Jeddah

senior design hvac engineer at Hassan El-Bakry Consulting Engrs
  • Egypt
  • March 1993 to March 1995

Working on the design concept, calculations and design drawing and preparation of tender documents related to the air conditioning and refrigeration works for the following projects:

A. Intercontinental Hotel Sharm El-Sheikh (840 T.R).
B. Marriott Hotel Sharm El-Shiekh (2ND Stage) (700 T.R).
C. Administration Building(SuezCanal University)(95 T.R)
D. El-Ein Resort (Galala Co.) (250 T.R).
E. the Westin Pyramids Hotel (1000 T.R).
F. Ministry of interior Administration building & games building include indoor stadium & indoors shutting halls. (600 T.R).
G. Technopak Manufacture 6TH of October City (Conference hall & offices) (21 T.R). packaged air-cooled units.
H. La Villa Blanch (600 T.R).

senior design hvac engineer at The Cairo for Cooling and Air Conditioning Office
  • Egypt
  • March 1992 to March 1993

Senior Mechanical Engineer, Working on the Maintenance the following projects:

A. Cairo Airport Building No. Fifteen Air handling units (300 T.R).
B. Uncle Sam Hotel - El-Giza. Central cooling 300 T.R.
C. Residential, Offices, Shops, etc.)
Installation and maintenance the window, split, packaged air conditioning types.

HVAC Engineer at The Elecon Company for Electrical, Cooling and Air Conditioning Service”
  • Egypt - Cairo
  • March 1986 to March 1992

HVAC Engineer, Working on the PREPRATION OF COST ESTEMATION, calculations and shop drawing for the following projects:

A. National Cancer Institute Cairo
(400 T.R). Central cooling, central heating.
B. October Pharma Manufactory 6TH of October City (300T.R).
C. Gymnasium Building (Sporting police union) (60 T.R).
D. Orocuarzo Manufactory for Modern Paint 10TH of Ramadan City (Ventilation and humidification).
E. Bany-Swif Communication Center (60 T.R).
F. Taliy cold stores (Monofia) 1000 Tons Potatoes.
G. Sidy Gaber Communication Center (40 T.R).
H. El-Wasta Communication Center (54 T.R).
I. Mido Manufactory for Sweet Meats (36 T.R).
J. Microwaves Hall at Nasr City Communication Center. “Shopra communication center, Maadi communication center and Roda communication center”.(60 T.R).
K. Cide Pharmaceutical Factory (Beverage dept.)(15 T.R).

Education

Bachelor's degree, power
  • at Mechanical Engineering. Cairo University
  • July 1985

(Good) (70,7%) & Project (Distinction)

Specialties & Skills

Air Conditioning
Programmer for air conditioning programs such as(DUCTLATOR Program, DUCTWIGHT Program.)
HVAC Load Estimation Programs (Carrier, Elite)
AutoCAD 2004 2D&3D, Winword, Excel.

Languages

English
Expert
Arabic
Expert