mohamed fouad, Construction Manager

mohamed fouad

Construction Manager

ABR

Location
Egypt - Alexandria
Education
Bachelor's degree, Civil
Experience
18 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 4 Months

Construction Manager at ABR
  • Saudi Arabia - Jeddah
  • My current job since January 2024
project manager at Egy star for construction
  • Egypt - Cairo
  • January 2020 to September 2023

 Schedule the project in logical steps and budget time required to meet deadlines
 Determine labor requirements and dispatch workers to construction sites
 Inspect and review projects to monitor compliance with building and safety codes, and other regulations.
 Interpret and explain plans and contract terms to administrative staff, workers, and clients.
 Direct and supervise workers.
 Study job specifications to determine appropriate construction methods.
 Select, contract, and oversee workers who complete specific pieces of the project.
 Selecting Plans and creating work methods, work procedures, work flow and standards of work quality.
 Determining staffing needs and schedules for crew events.
 Monitoring budget for each event and advising appropriate party if approaching budgetary limits.
 Time schedule monitoring.
 Study new tenders, projects and analyses all details to ensure good work.

construction manger at Shapoorji Palonji Mideast
  • Saudi Arabia - Khobar
  • August 2015 to August 2017

construction manger for Raziza tower (a 24 floor tower building )

 Selecting Plans and creating work methods, work procedures, work flow and standards of work quality.
 Coordinating and supervising engineers, contractors and staffs.
 Supervising and monitoring all the activities of subordinates.
 Determining staffing needs and schedules for crew events.
 Monitoring budget for each event and advising appropriate party if approaching budgetary limits.
 Reviewing event evaluation, summaries and daily activity reports of staff.
 Cost evaluation techniques and calculations to ensure that the project cost is kept the minimum without losing quality and efficiency.
 Responsible for the site safety (staff, equipment and materials).
 Time schedule monitoring.
 Study new tenders, projects and analyses all details to ensure good work.

construction senior project engineer at shaporgy palongy
  • Saudi Arabia - Khobar
  • March 2014 to July 2015

senior project engineer for Abdulkarim tower (a 44 floor tower building )

Responsibilities:
 Giving Daily reports for the project Manger.
 Supervising and monitoring all the activities of subordinates.
 Determining staffing need and schedules for crew events.
 Studying new tenders, projects and analyzing all details to ensure good work.
 Recommending purchase of new or replacement equipment.
 Training, supervising and evaluating the activities of subordinates.
 Preparing reports such as event evaluation, summaries and daily activity reports of staff.
 Taking place as manager on duty in the absence of other management representative.
 Performing on-site supervision at events to ensure technical production requirements are met.

senior project engineer at shaporgy palongy
  • Saudi Arabia - Riyadh
  • September 2013 to March 2014

senior project engineer for new commander collage project
responsible for water tank, transformers building , two arcade & accommodation building

Responsibilities:
 Giving Daily reports for the Executive Manger.
 Supervising and monitoring all the activities of subordinates.
 Determining staffing need and schedules for crew events.
 Studying new tenders, projects and analyzing all details to ensure good work.
 Recommending purchase of new or replacement equipment.
 Training, supervising and evaluating the activities of subordinates.
 Preparing reports such as event evaluation, summaries and daily activity reports of staff.
 Taking place as manager on duty in the absence of other management representative.
 Performing on-site supervision at events to ensure technical production requirements are met.

Construction Project Manager at sag for construction
  • Egypt - Alexandria
  • March 2011 to August 2013

• HIlton King's ranch Hotel, Spa and Water Treatment Station with total cost 30 million LE, working as Construction Project Manager.
Responsibilities:
➢ Select Plans and create work methods, work procedures, work flow and standards of work quality.
➢ Coordinate and supervise engineers, contractors and staffs.
➢ Supervising and monitoring all the activities of subordinates.
➢ Determines staffing needs and schedules for crew events.
➢ Monitoring budget for each event advising appropriate party if approaching budgetary limits.
➢ Reviewing event evaluation, summaries and daily activity reports of staff.
➢ Cost evaluation techniques and calculations to ensure that the project cost is kept the minimum without losing quality and efficiency.
➢ Responsible for the site safety (staff, equipment and materials)
➢ Time schedule monitoring.
➢ Study new tenders, projects and analyses all details to ensure good work.
• Antoniadis Residential Compound (6 building) with total coast 50 million Egyptian pound, working as Executive Manger,

working as Executive Manger at  Sag for construction
  • Egypt - Alexandria
  • January 2010 to March 2011

• Antoniadis Residential Compound (6 building) with total cost 50 million Egyptian pound, working as Executive Manger, from January 2010 to March 2011.
Responsibilities:
 Giving Daily reports for the project manager.
 Supervising and monitoring all the activities of subordinates.
 Determining staffing need and schedules for crew events.
 Studying new tenders, projects and analyzing all details to ensure good work.
 Recommending purchase of new or replacement equipment.
 Training, supervising and evaluating the activities of subordinates.
 Preparing Reports such as event evaluation, summaries and daily activity reports of staff.

working as senior site engineer at  Sag for construction
  • Egypt - Alexandria
  • December 2008 to January 2010

• Sigma 307 project installation for Air Liquid Company with total cost 25 million Egyptian pounds, working as senior site engineer, from December 2008 to January 2010.
Responsibilities:
 Giving Daily reports for the Executive Manger.
 Supervising and monitoring all the activities of subordinates.
 Determining staffing need and schedules for crew events.
 Studying new tenders, projects and analyzing all details to ensure good work.
 Recommending purchase of new or replacement equipment.
 Training, supervising and evaluating the activities of subordinates.
 Preparing reports such as event evaluation, summaries and daily activity reports of staff.
 Taking place as manager on duty in the absence of other management representative.
 Performing on-site supervision at events to ensure technical production requirements are met.

Site engineer in Golf Porto Marina project at Amer Group
  • Egypt
  • December 2007 to November 2008

❖ Delmar (Amer Group) for tourism development, Alexandria, from December 2007 to November 2008 with total cost 100 million Egyptian pounds, working as Site engineer in Golf Porto Marina project, Porto bay section.
Responsibilities:
➢ Daily reports for the Executive Manger.
➢ Supervising and monitoring all the activities of subordinates.
➢ Determines staffing need and schedules for crew events.
➢ Study new tenders, projects and analyses all details to ensure good work.
➢ Recommends purchase of new or replacement equipments.
➢ Train, supervise and evaluates the activities of subordinates.
➢ Prepare reports such as event evaluation, summaries and daily activity reports of staff.
➢ Take place as manager on duty in the absence of other management representative.
➢ Performs on-site supervision at events to ensure technical production requirements are met.

Engineering Consultant, at Al Nawah office
  • Saudi Arabia - Altaif
  • January 2006 to September 2007

❖ Al Nawah office for engineering & consultation, El Taif at kingdom Saudi Arabia. Working as Engineering Consultant
Responsibilities:
➢ Designed of three floors buildings according to the mayor requests.
➢ Supervised and monitoring for the owners on contractors.
➢ Study new projects and analyses all details required to ensure good work for clients.
➢ Surveying and landscaping designs for clients.

site engineer at El Faehaa Company for Construction
  • Egypt - Alexandria
  • April 2003 to December 2005

working as Site engineer in el faehaa tower
Responsibilities:
➢ Supervised and monitored all the activities of subordinates.
➢ Supervised the restoration of Alexandria Port building.
➢ Shop drawing for the site.

Education

Bachelor's degree, Civil
  • at Alexandria University
  • November 2003

B.S., Civil (Faculty of Engineering. Alexandria University), November 2003

Specialties & Skills

Project Management
Civil Works
Infrastructure Projects
Inspection
Finishing
CLIENTS
ENGINEER
PROJECT MANAGER
SITE SAFETY
STAFFING
WATER TREATMENT
WORK FLOW
Microsoft office tools word and excel
autocade 2d

Languages

Arabic
Expert
English
Expert
French
Beginner

Memberships

Egyptian syndicate of engineers
  • civil engineer
  • December 2003
Saudi council of engineers
  • civil engineer
  • September 2013

Training and Certifications

 Primavera (Certificate)
Date Attended:
October 2003
Valid Until:
January 9999
 AutoCAD 3D (Certificate)
Date Attended:
May 2006
Valid Until:
January 9999
 AutoCAD 2D (Certificate)
Date Attended:
August 2003
Valid Until:
January 9999
site works (Training)
Training Institute:
El Faehaa Company for Construction
Date Attended:
June 2000
civil (Training)
Training Institute:
Alexandria petroleum company
Date Attended:
August 2002
welding field (Training)
Training Institute:
Devco group company for welding inspection
Date Attended:
June 2001

Hobbies