Project Engineer
SHAHID TECHNICAL CONTRACTING COMPANY
Total des années d'expérience :12 years, 8 Mois
• Survey for the ETISALAT and DU waiters (Customers) and FDH, planning for connecting through proper way
• Supervising civil work implementation on site
• Supervising cable work implementation on site
• Guiding and supervising Technical team for Splicing and termination in OSP and ISP
• Coordinating for all projects with ETISALAT and DU
• Preparation of STIE DIARY
• Assisting Project Manager in all officials meeting and tasks
• Final check at all as built civil and cable drawings
• Joint visits of FDH and waiter sites with ETISLAT and DU inspector for final checking
• Trouble shooting of Technical tools and technical problems
• Supervising implementation of FTTH PROJECTS of MOBILY Civil work (survey, designing and implementation according to standard) and Fiber work (FOC pulling, splicing, termination and trouble shooting. ODB, OSB, FTB, and Patch Panel installation and termination.
• Coordination with vendors and attending all meetings
• Quality and Quantity checking at subcontractors site according to standard
• Supervising FTTx Projects of INTEGRATEC TECLECOM (ITC) Civil work (survey, designing and implementation according to standard) and Fiber work (FOC pulling, splicing, termination and trouble shooting. ODB, OSB, FTB, and Patch Panel installation and termination.
• Project Manager for Operation and Maintenance of INEGRATEC TECLECOM (ITC) Riyadh region.
Management of Optical Fiber Cable Backbone Network Project (300Km in Riyadh region) starting from Planning, Surveying, BOQ Preparation, PAT Binder preparation, drawing preparation and arrangement, Cost Estimates and Designing of Technical Specifications, Execution, Monitoring, Quality assurance, Financial evaluation and handing over to O&M teams.
Supervision of patrolling team throughout the fiber optic network line
Providing of FOC Technical team for emergency work 24 hours
Guiding FOC technical teams in splicing, termination and trouble shooting
Preparation of all necessary reports, documents, binders and BOQs for ITC Management
• Preparation of Purchase orders (PO) for all projects.
• Quality checks and review of design work packages for civil and cable works.
• Surveying, drawings, binder and Documents preparation and arrangements.
• Supervising Technical team in Splicing, terminations and trouble shooting.
• Assisting General Manager in different tasks and meetings.
• Preparation of feasibility reports, technical and management planning, costing, proposals, technical surveys, Testing reports, Execution/progress reports and project documentation
• Resolving coordination issues between the field staff and the design team.
• Heading the testing, development, pulling, installation team both technically and administratively
• Supervise and assures that the design has been precisely carried out on site during project execution.
• Ensure project deployment quality is delivered in compliance with industry standards
• Quality and technical check up of all devices use for Splicing, testing and termination e.g. OTDR, Power meter, laser source, live Fiber detector etc.
Operation & Maintenance ZTE Exchange.
• One Year Experience as Assistant Engineer
• Survey and Design roots for connecting ZTE Exchange.
• Supervising implementation on site (Civil Work).
• Supervising Technical team in Splicing and Fiber works.
• Trouble shooting fiber optics problems through OTDR.