Engineer
NESPAK
Total years of experience :15 years, 9 Months
• Worked on the Planning and Design of different Projects, the main activities include Coordination with the Client, Preparation of Design Methodology, Financial Proposals, Inception Report, Feasibility Studies, Project Planning, Preliminary and Detailed Engineering Design, PC-I, Engineer’s Estimates and Tender Documents. Maintenance of Project Record as per QMS (Quality Management System) and Preparation for Internal as well as External Audit conducted by UKAS and Moody International.
• The designs of Storm Drainage System include Road Drainage, Lift Stations by using different Computer software like SWMM, WinTR-32 and EXCEL Spread Sheets. Prepare Technical Specifications, Construction and Tender Drawings for different areas by using their required Design Standards.
• To Design Sewerage Schemes and Sewerage Systems including Hydraulic Design of Pipe, Conduit and Disposal Stations by using EXCEL Spread Sheets and to perform Life Cycle Cost Analysis based on currently available Pumping Machinery and different arrangements used in Pumping Stations, Prepare Technical Specifications, Construction and Tender Drawings for different areas by using their required Design Standards.
• Design Work and Coordination with clients and site staff regarding design Input and give Presentations to Higher Management of Government level.
M.Sc. Environmental Engineering: (Thesis in progress) University of Engineering & Technology, Lahore-Pakistan
B.Sc. Civil Engineering: 1st Division University of Engineering & Technology, Taxila-Pakistan