JOB DESCRIPTION
I am Accountable for timely completion of all milestone access dates during various site operation phase as per base line schedule and with zero Cost of Poor Quality .
I will be responsible for management of staff and subcontractors, as well as contributing to the commercial success of the project and involvement in technical aspects of the projects .
I will assist the Project Manager in the development of the construction programme including the production of the planning reports, equipment and materials schedules .
Preparation of Daily Reports, Weekly Reports and any other such reporting as may be required .
Responsible for completion of site works with zero snags.

Electrical Site Manager in CERCON GENERAL CONTRACTING CO - Riyadh - KSA from JAN 2015 till now:
Certified safety engineer from Saudi Electricity Company.
Working in PROJECT of: Construction New 132 KV D/C UGTL as Replacement to Existing 132 KV D/C OHTL Portion of Abha East BSP-Khamis South SS.
Brief Description of Work Completed:
Construction of new 132 KV. D/C UGTL Using one (1) Cable per Phase, Single Core 1200 mm2 XLPE Copper Cables, as Replacement to Existing 132 KV D/C OHTL Portion of Transmission Line Suppling Power to KHAMIS South 132/13.8 KV SS. the installation shall include two (2) Communication Cables having 36-core UGNFOC To
Re-establish full power and communication Links between the Substations of ABHA EAST and KHAMIS SOUTH.
Overseeing the Safety and Healthy Plan & Follow up and Implementation in Project.

Project Manager à CERCON
  • Arabie Saoudite - Riyad
  • janvier 2015 à novembre 2018

I am Accountable for timely completion of all milestone access dates during various site operation phase as per base line schedule and with zero Cost of Poor Quality .
I will be responsible for management of staff and subcontractors, as well as contributing to the commercial success of the project and involvement in technical aspects of the projects .
I will assist the Project Manager in the development of the construction programme including the production of the planning reports, equipment and materials schedules .
Preparation of Daily Reports, Weekly Reports and any other such reporting as may be required .
Responsible for completion of site works with zero snags

safety engineer à CERCON
  • Arabie Saoudite - Riyad
  • janvier 2005 à novembre 2018

Saudi Electricity Company.
•Working in PROJECT of: Construction New 132 KV D/C UGTL as Replacement to Existing 132 KV D/C OHTL Portion of Abha East BSP-Khamis South SS.
•Brief Description of Work Completed:
Construction of new 132 KV. D/C UGTL Using one (1) Cable per Phase, Single Core 1200 mm2 XLPE Copper Cables, as Replacement to Existing 132 KV D/C OHTL Portion of Transmission Line Suppling Power to KHAMIS South 132/13.8 KV SS. the installation shall include two (2) Communication Cables having 36-core UGNFOC To
Re-establish full power and communication Links between the Substations of ABHA EAST and KHAMIS SOUTH.
•Overseeing the Safety and Healthy Plan & Follow up and Implementation in Project.

•Working in REMAH HOUSING PROJECT (MINISTRY OF HOUSING) - INFRASTRUCTURE) - Riyadh.
•Implementation of all of the terms of electrical works
•Brief Description of Work Completed:
•Working in Electric Substation (17 TRANSFORMS ROOM) 36kv/400V - LVDP) and street lighting system Indoor & Outdoor.
•Installation and Testing for MV, LV Under Ground Cables including Joint Kits &Terminations Kits.
•Designing and implementation of all low-voltage works such as lighting circuits, Power circuits, low voltage cables and design single line diagrams.
•Working in central air conditioning (electrical loads accounts for central air conditioning units, design and implementation of their own electrical panels) and the work of fire-fighting.
•Review and calculate all the electrical loads of projects and work plans and schedules loads distribution and preparation of all shop drawings by AutoCAD.
•Overseeing the Safety and Healthy Plan & Follow up and Implementation in Project.

Site Engineer à ALrowad For Real Estate Developmen
  • novembre 2013 à janvier 2013

in Project of Arrowed Residential Compound - Khartoum.
•Implementation of all of the terms of electrical works projects, and include the following:
Working in Electric Substation and Switchgears (RMU-Transformers -Generators - MDP).
Designing and implementation of all low-voltage works such as lighting circuits Power circuits, low voltage cables and design single line diagrams.
Working in central air conditioning (electrical loads accounts for central air conditioning units, design and implementation of their own electrical panels ) and the work of fire-fighting.
Designing and implementation of the light current work safety, fire alarm, central network - computer network - a network Acoustics - surveillance cameras.
Review and calculate all the electrical loads of projects and work plans and schedules loads distribution and preparation of all shop drawings by AutoCAD.
Overseeing the Safety and Healthy Plan & Follow up and Implementation in Project.

Site Engineer à AL-ANDALOS company for designs & Construction
  • Egypte
  • mai 2009 à octobre 2009

Initial planning for the supervision and coordination with the contractor before handing over the site
•Review and adoption timetable and updated
•Delivery of the site to the contractor
•Adoption of shop drawings to ensure compliance with the approved standards and general requirements for the design.
•Technical follow-up of the project
•Design and implementation of all the electrical low Voltage works for projects and make load calculations for Central Air Condition works
•Low Voltage Works (lighting, power circuits, AC)
•Light Current (Tel, Data, TV, CCTV, Fire Alarm).

Electrical Engineer à TRUST for Engineering Services
  • Egypte
  • août 2008 à avril 2009

Maintenance services and engineering consultancy for electrical works.
•Implementation of electrical infrastructure works include the following
1. The extension of medium voltage cables for electrical substation distribution networks
Extension of the low-voltage cables for street lighting
Extension of telecommunications networks and the information net works
Ensure that the system is stable and safe and planning of city streets for Electrical Works.
•Electrical engineer during the military service

Éducation

Baccalauréat, Electrical and automotive
  • à Minufiya University
  • mai 2005

Grade: Pass. •Graduation project: Design a program to expect future consequences via the currently available values. •Project evaluation: Excellent.

Baccalauréat, Electrical and automotive
  • à Minufiya University
  • janvier 2005

Grade: Pass. •Graduation project: Design a program to expect future consequences via the currently available values. •Project evaluation: Excellent.

Etudes secondaires ou équivalent, Electrical and automotive
  • à Minufiya University
  • janvier 2005

Grade: Pass. •Graduation project: Design a program to expect future consequences via the currently available values. •Project evaluation: Excellent.

Specialties & Skills

Civil Works
Health and Safety
Automatic Control
Maintenance Planning
LIGHTING
MICROSOFT WORKS
AUTOCAD
TRANSMISSION
DELIVERY
ENGINEERING

Profils Sociaux

Langues

Arabe
Langue Maternelle
Anglais
Expert

Formation et Diplômes

PMP (Formation)
Institut de formation:
Insector: Emad Mostafa Hegazy / PMI,PMP #1828891
Date de la formation:
February 2016
Durée:
35 heures
• CERTIFICATE for participation in HRO Traning – Working at Height. (Formation)
Institut de formation:
Saudi Electricity Company
Date de la formation:
May 2018
Durée:
16 heures