Work Experience

Total years of experience :14 years, 0 Months

Mechanical QC Inspector at BL Harbert International
  • Niger - Niamey
  • September 2016 to October 2021

• Directly report to my immediate superior regarding project status compliance and noncompliance work carried out by the contractor at site.
• Coordinates to Field Supervisor for supervision of work.
• Ensure that the methods statement, shop drawing and material submittals are approved intended for mechanical system.
• Supervise day to day site activities to ensure work is executed in accordance with the project specification.
• Attending QC weekly meeting with OBO Engineers and BLHI Manager & Engineer to tackle quality issues.
• Gathered all the data of Mechanical Equipment

• Raise a notification of non-conformity (NNC) when works carried out deviated from project specification, methods statement and approved shop drawing.
• Conduct inspection on all pumps and valves to be use in the project to ensure as per approved manufacturer and supplier.
• Conduct inspection with Client Representative of all the installation and testing of Plumbing, HVAC, Fire, Fueling and Drainage system, check invert elevation and location as per approved shop drawing.
• Record all the installation and testing of all Mechanical System.
• Conduct material inspection, installation and testing for HVAC system, fire protection system and water system as per approved methods statement and shop drawing.
• Conduct inspection of AHU’s and Chiller with accessories upon material delivery, installation and testing.
• Conduct inspection for WWTP, Sewage Pumping Station and its complete assembly of pipes, valves and pumps upon material delivery, installation and testing.
• Witnessing Pressure and Pneumatic testing.
• Conduct Pre Functional Test inspection of all Mechanical equipment.
• Review shop drawing prior to submission to A/E.
• Review material submittals prior to submission to A/E.
• Review As-Built drawing prior to submission to Client.

Mechanical Inspector at Railway Project Management Company
  • Saudi Arabia - Riyadh
  • June 2014 to August 2016

• Directly report to my immediate superior regarding project status compliance and noncompliance work carried out by the contractor at site.
• Coordinates to the contractor site engineer for supervision of work.
• Ensure that the methods statement, shop drawing and material submittals are approved intended for mechanical system.
• Supervise day to day site activities to ensure work is executed in accordance with the project specification.
• Attending regular site meeting with ISC Engineers and Contractor Engineer to tackle quality issues.
• Raise a notification of non-conformity (NNC) when works carried out deviated from project specification, methods statement and approved shop drawing.
• Conduct inspection on all pumps and valves to be use in the project to ensure as per approved manufacturer and supplier.
• Check all the installation and testing of Plumbing, HVAC, Fire, Fueling and Drainage system, check invert elevation and location as per approved shop drawing.
• Conduct material inspection, installation and testing for HVAC system, fire protection system and water system as per approved methods statement and shop drawing.
• Conduct inspection of Boiler and Chiller with accessories upon material delivery, installation and testing.
• Conduct inspection for STP and its complete assembly of pipes, valves and pumps.
• Witnessing Pressure, Light, Sound and Smoke testing.
• Witnessing Pre Start Up and Start Up of all equipment.
• Witness Testing and Commissioning for mechanical system.
• Review submitted As-Built drawing.
• Review handover documents.

Elevator/Escalator Technician at Hive Company
  • Saudi Arabia - Hail
  • October 2011 to December 2013

• Development of specific tasks and procedures customized to the elevator and escalator equipment.
• Perform preventive maintenance in accordance with published schedules, operating procedures and equipment warranties; provide input to upgrade content and frequency of preventive maintenance.
• Maximized equipment reliability.
• Minimized equipment and repair costs.
• Increased labor productivity.
• Reduced equipment downtime.
• Increased equipment efficiency and life expectancy.
• Optimized overall maintenance program efficiency.
• Tracked and analyzed equipment information and history.
• Analyzed historical maintenance issues and help predict future events.

Mechanical QC Engineer at F.R Sevilla Industrial & Development Corporation
  • Philippines - Taguig
  • July 2011 to October 2011

• Attending QC meeting with Gen. Contractor Engineers and Sub-Contractor Engineers to tackle quality issues.
• Conduct Material/Equipment inspection upon delivery at site.
• Interface with the Gen. Contractor Engineer prior to joint inspection for installed pipe lines, ducting, supports and fittings.
• Performing Pressure, Light, Sound and Smoke testing.
• Preparing some document such as RFI, MIR and daily activities.
• Assist our project manager and engineers to improve our workmanship.

ESCALATOR TECHNICIAN at HYUNDAI – Elevator Services Phil’s Inc
  • Philippines - Manila
  • May 2009 to June 2011

Development of specific tasks and procedures customized to the elevator and escalator
equipment.
• Perform preventive maintenance in accordance with published schedules, operating
procedures and equipment warranties, provide input to upgrade content and frequency of
preventive maintenance.
• Maximized equipment reliability.
• Minimized equipment and repair costs.
• Increased labor productivity.
• Reduced equipment downtime.
• Increased equipment efficiency and life expectancy.
• Optimized overall maintenance program efficiency.
• Tracked and analyzed equipment information and history.
• Analyzed historical maintenance issues and help predict future events.

QUALITY CONTROL INSPECTOR at MIKADO Philippines Corporation
  • Philippines - Rosario
  • November 2007 to October 2008

Calibrating measuring tools and equipment; inspections and record the gathered data.
• Analyzing and checking the chemical composition of materials to be use in molding small or
large propellers and/or boss cap fins.
• Checking the mechanical composition of the materials to be mold like hardness and
strengthens of product using universal testing machine and hydraulic compressed hardness
tester (BHN).
• Make decision for some minor problem regarding the product defects and production
matters.
• Conduct quality checking like die penetrate testing and compressed hydro testing on
propellers boss cap fins.
• Analyzing the drawings, measure and check the product dimensions.
• Check the final product appearance.

QUALITY CONTROL ENGINEER at BM Fabula Enterprises
  • Philippines - Batangas
  • September 2006 to July 2007

• Attending QC meeting with Gen. Contractor Engineers and Sub-Contractor Engineers to tackle quality issues.
• Conduct Material inspection upon delivery at site.
• Interface with the Gen. Contractor Engineer prior to joint inspection for installed pipe lines, valves, pumps and supports.
• Preparing some document such as RFI, MIR and daily activities.
• Inspection of fit-up joint preparation and visual inspection of weld joint prior to commence full welding.
• Checking the quality of pipes and fittings according to specification.
• Performing hydro Testing of Piping system.
• Assist our project in charge to improve our workmanship.

Education

Bachelor's degree, Mechanical Engineering
  • at EARIST
  • April 2006

Specialties & Skills

ENGINEERING
SUPERVISORY SKILLS
MECHANICAL
QUALITY
SPECIFICATION

Languages

English
Intermediate

Hobbies

  • playing basketball