Eusebio Liwag, Surveyor

Eusebio Liwag

Surveyor

Al Alfia Holding

Location
Qatar - Doha
Education
High school or equivalent, Marine Engineering
Experience
30 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :30 years, 5 Months

Surveyor at Al Alfia Holding
  • Qatar
  • My current job since December 2014
Surveyor at Qatar Petroleum District Project, 9 Towers + Hotel
  • December 2012 to November 2012
Surveyor at Leighton Contracting
  • United Arab Emirates
  • April 2011 to October 2011

2012
Projects : Khalifa Port Industrial Zone Project, - Roads, Bridges, Structures,
and Utilities (Roads and Infrastructure

Surveyor at Qatari Diar Vinci Construction
  • Qatar
  • February 2011 to April 2011
Surveyor at Leighton Contracting Qatar WLL
  • November 2006 to January 2011
Surveyor at Al Habtoor Engineering Enterprises LLC
  • United Arab Emirates
  • October 2005 to September 2006
Consultant at Beach Residence Properties
  • September 2004 to October 2005
Surveyor at Hazama Philippines Corporation
  • February 2003 to August 2004
Site Engineer at Hazama Philippines Corporation
  • February 2001 to February 2003
Surveyor
  • March 1998 to February 2001
Surveyor at Taisei Corporation Pakistan
  • February 1997 to March 1998
Surveyor at Engineering Equipment Incorporation
  • June 1995 to February 1997
Surveyor at Engineering Equipment Incorporation
  • March 1995 to June 1995
Surveyor at Engineering Equipment Incorporation
  • August 1993 to February 1995
Project at K-Line Shipping
  • Philippines
  • July 1992 to August 1993
Assistant Surveyor
  • United Arab Emirates
  • September 1990 to June 1992
Owner at Qatar Petroleum
  • Qatar
  • to
Consultant at Astad - KEO International Consultan
  • Qatar
  • to
Consultant at International Bechtel Company Limited
  • United Arab Emirates
  • to
Owner at Sheraton Hotel
  • Qatar
  • to
Consultant at Parsons International Consultan
  • Qatar
  • to
Owner at Al Shaqab Academy, Qatar Foundation, Education City Project (Civil works, Roads
  • to
Consultant at KEO International Consultant, Al Shaqab, Al Rayyan
  • Qatar
  • to
Project
  • to

Business Bay Towers Project, 3B+LG+UG+Podium+MEZZ. +48
Floors

Owner at Business Bay Properties
  • United Arab Emirates
  • to
Consultant at Dar Consult International
  • to
Surveyor at Al Habtoor Engineering Enterprises LLC
  • United Arab Emirates
  • to

Project : Jumairah Beach Residence Project, 4B+PODIUM+52
Floors

Project
  • to

Subic-Clark-Tarlac Expressway Project (Roads and Infrastructure

Consultant at BCDA Consulting Engineers
  • to
Consultant at Hazama Philippines Corporation
  • to
Project
  • to

Luisita Industrial Park 2 Project (Roads and Infrastructure

Project at Metropolitan Water Supply
  • Pakistan
  • to
Consultant at Mitsubishi Heavy Industries
  • United Arab Emirates
  • to
Project
  • to

Kingswood Twin Towers 3B+LG+UG+MEZZ+28Floors

Consultant at East West Consultants Inc
  • to
Project at Solid Cement Plant Project, Antipolo City
  • to
Consultant at Solid Cement Plant Inc
  • to
Project
  • to

Science Park of the Philippines Project, (Roads and Infrastructure

Surveyor at Asiakonstrukt Philippines
  • to
Project at Philippine Rice Research Institute
  • Philippines
  • to

Roads and Infrastructure Works:

Able to handle High Rise Buildings, Topographic survey, Road and Infrastructure works, Site development, Oil Refinery, Pipe Lines, Steel Structural works.
Responsible in all surveying works and As-Built of finished structures like bridges and culverts as required by the Consultants and Engineers.
Approving of Inspection Request if the site preparations are as per approved drawing.
Issuing (NCN) Non Conformance Notice or (NCR) Non Conformance Report if the contractors are not complying with the specification requirements as per QCS 2010/2014.
Site inspection of backfilling layer thickness as per QCS 2010/2014 specification requirements. (Earthworks)
Setting out of boundary fence and site inspection.
Preparing weekly and monthly progress report as clients required.
Taking site progress photos.
As-Built and volume calculation of Backfilling materials, Raw materials, and Processed materials.
Responsible in Structures, Infrastructures, and Utility works setting out.
GPS works Real Time Kenetic and Static Techniques.
Setting out of gantry posts for signage’s. Underground pipe lines, and light poles in the KPIZ main roads.
Khalifa Port Industrial Zone main roads, setting out of curb stones and concrete fixed barriers. Setting out of storm water drainage and spillways.
Vertical curve calculations and alignments.
Setting out of the bored piles for Bridges, Abutments, and Piers foundation.
Check wall alignments of abutment, culvert structures, roads alignment setting out and marking levels.
Worked independently or as part of team to provide Drawings for all buildings with coordination to the Engineers and Consultants. Land Survey Management and able to process survey data (coordinates) using AutoCAD for Structures setting out.


Civil and High Rise Building works:

Site inspection of Villas setting out of columns, walls, elevations, thickening and mat foundations prior to concrete blinding.
Checking setting out of columns, walls and verticality of shuttering’s, beam elevations and slab levels and limit prior to concrete pouring.
Supervision and checking of Facade and Architectural works setting out and Alignments and Levels.
Responsible as a Team Leader of the Surveyors.
Checking of subcontractor’s works and inspections.
Prepare and process data of (UCW) Unitized Curtain Wall and brackets for setting out.
Setting out of glass panels (Curtain Walls) alignment and leveling.
Setting out and Alignments, leveling of Screen Arms for external screen decors.
Responsible for all mullions and brackets setting out of terracotta tiles on roof towers (8 Towers).
As-built of finish installed mullions of terracotta tiles prior for inspection.
Able to prepare written survey reports.
Plotting as-built data in AutoCAD as required by the Engineers and Consultants.
Bored piles setting out at Maintenance and Service Facilities in Sheraton Park Project.
Worked at multi packages and responsible to all site survey works both structural and architectural. In charge of the survey finishing works at the packages: D1, D2, D3, D4, D5, D7, Package-H, and Package-F1 in Al Shaqab, Education City Project, Doha, Qatar.
Worked independently or as part of team to provide Drawings for all buildings with coordination to the Engineers and Consultants. Land Survey Management and able to process survey data (coordinates) using AutoCAD for Structures setting out.

QA at Control
  • United Arab Emirates
  • to

of the high rise buildings in Jumairah Beach Residence Project -

Project Management Consultant
  • United Arab Emirates
  • to

Education

High school or equivalent, Marine Engineering
  • at Mariners’ Polytechnic Colleges Foundation
  • January 1990

courses: Baras, Canaman,

Specialties & Skills

Languages

Arabic
Expert
English
Expert
Hindi
Expert
Tagalog
Expert