Project Manger
B-Films
Total years of experience :10 years, 6 Months
In charge of all the projects for Director Bader Alhummod and B films Company.
I mange and supervise on current and upcoming events and digital projects
Work With the Sanitation department to develop the Integrated Waste Management Plan ( Zero Waste), by working with ATKINS consultants.
Also Work on the Waste Awareness Campaign to help increases recycling in Jubail Industrial City.
SceenTV is a youtube channel with over a million Subscriber.
I worked as a General Manger, which under my responsibility is project management and project finance.
Also oversee the studios and team coordinator
- Coop Program
In my Coop Program with MFMU and Preventing medicine, I have done and achieved a lot.
1- Provided 100% time efforts with Industrial Hygiene unit for the teaching and testing of Respirator Fitting for nursing staff at DHC.
2-Conducted an evaluation process of Xylene and Formaldehyde Exposures to Lab workers.
3-Tasked to update the Emergency Exit Plan in DHC. This has been achieved with 100% complete.
4-Conducted Joint inspections with EOC members in the weekly EOC Rounds in DHC including visits to Shaybah medical centers.
5-Conducted Joint inspections with medical facility maintenance for the weekly MER Rounds.
6-Provided a search for Decontamination Equipments and Prices, and visited the Decontamination facility in baqieq.
7-Participated full time in the GCC Traffic Week in March 2010.
8-Participated in 2010 Information Technology Safety Campaign.
9-Assisted in the hands on training for fire extinguisher for Pathology & Clinical Laboratory Services Division in May 2010.
10-Conducted Joint inspections with the Dhahran Fire Protection Dept. for the Annual Fire Extinguishers at DHC.
(Desalination Station-Khobar)
Assist in Desalinated Water Evaluation in Lab
Sea water Monitoring and Sampling.
(1/2010 -2/2010)
Assist in Industrial Inspection, Occupational Health & Safety.
Assist in Collecting Samples (water & Soil).
For 6 weeks in RGME, I have been working with Air, Water Section and Lab Unit.
1-In Air Section:
Assist in the Air Quality Monitoring And Sampling in 9 Stations.
Assist in Calibration PM Device and Changing filters.
2-In Water Section:
Assist in water and wastewater Sampling and Monitoring.
Assist in Industrial Inspections for any illegal discharges and behaviors.
3-In Lab Section:
Assist in water and wastewater chemistry evaluating & microbiology lab.
Hospital/ EH Dept.
I spend 6 weeks in Saad Hospital with EH Dept.
1- Conducted Joint Rounds And Inspections with Environment Dept.
2- Assist Infection Control & Quality Control Unit.
3-Assist in Waste management collection.
Graduation project title: Evaluating dust control methods to determine the most effective for a desert environment.
Graduation project title: Study of roads re-design as a control measure for reduction of traffic air pollution.