Control Room Operator (Power & Utilities)
Rabigh Arabian Water & Electricity Company
Total years of experience :18 years, 4 Months
Control Operate and maintain Plant equipment's to Generate Power, Steam and
water that ensure capacity and availability of the client's requirements for utilities (as per Petro Rabigh Agreement)
through system Monitoring and efficient Operation of the Power Plant Facilities, Applying knowledge, Policies and
Procedures. Job Description and Objectives • To ensure ease of operations and maximize plant efficiency. • To minimize
maintenance requirements and auxiliary power equipment. • To maximize revenue producing Energy while minimizing
capital and operational costs. • To Ensure compliance with environmental and safety Regulations. • Achieve zero operator
error in the execution of LOTO process, usage PPE, Operational procedure, and check list, walk around checks, Plant
Operational values under approved control limits (Technical vender, Manual or MOC) and shift turnover, excellent plant
housekeeping, • Strict Follow up of planned operational activities (Changeover and Equipment test) and plant operation
manoeuvres. • Maintain DCS Alarm system under KPI (300Alarms/Day). • Strict Control of Maintenance, Supply of Bulk
Chemicals (Trucks in Chemical Discharge area) activities, updates Data in OCEN & SAP operation log of every activity
including communication with client. • Achieve ZERO injuries in the Power Plant and ZERO damage on the Plant
Equipment. • Achieve 100% of reliability in Operator Duties/Responsibilities. • Resolved all non-Conformities resulted from
any ISO audit within 1 month after issuance.
Project Specifications: • Boilers 13x470 t/h MHI (Mitsubishi Heavy Industries)-NAGASAKI Boiler 100% B-MCR, FD,
Mitsubishi Water Tube Boiler outdoor, single-drum, natural circulation, Bottom supported type model MB-RBP, PM
Burner, OFA system, 112 kg/cm2(ga) x 508 DegC. • Turbines 7x120 MW MHI, 100% T-MCR, MITSUBISHI Single
Cylinder, Single Flow Extraction Exhaust Condensing Type (SC1F-25), 4 Extractions, 105 kg/cm2(ga) x 500 DegC.
MITSUBISHI Totally Enclosed Direct Coupled, Air Cooled Stator, Air Cooled Rotor, Brushless Excitation System. • FGDs
B-MCR of 5, 1 unit/ 3Boilers, Total 3 units, ONCE-THROUGH, WET, LIMESTONEGYPSUM PROCESS, 3.7wt% SULFER
CONTENT, Outlet SO2210 mg/Nm3 ppm (3%O2, dry/dry) ABSORBER (100%x1) RECIRCULATION PUMP (33%x4),
OXIDATION BLOWER (50%x3), LIME SLURRY PREPARATION SYSTEM GYPSUM HANDLING SYSTEM. • RO Trains
24x504 t/h, 3 pass RO, 1st Hollow Fibre 2nd & 3rd Spiral Wound, Gravity Type Dual Media Filtration +Micron Cartridge. •
BFWs Turbine Driven 5x1350 t/h, BFW Motor Driven 4x1350 t/h attached with single shaft Booster Pumps. (157kg/cm2). •
BFWPs HHP 4x550 t/h with 157 kg/cm2 along with Minimum recirculation flow control. • BFWPs HP 4x550 t/h with 86
kg/cm2 along with Minimum recirculation flow control. • DEAERATOR FWPs 1350t/h with Level Control system
•Well Familiar with SIEMENS SPPA T3000 along with Gas Turbines,
Fully Command & Controls on GE-7FA, GE Mark VI
•Fully aware with OVATION (Emerson) Control System.
Worked on 4x80MW GTG’s of SGT 2000E (Siemens).
•Well Familiar with ABB x800A along with WTS.
•Understanding of multidiscipline engineering functions, interfacing and protocols.
•Installation, Inspection, Commissioning, Operation and Maintenance of process control and Industrial
•Commissioning, Testing and Start-up
•Operation of Gas Turbines along with BOP, auxiliaries and Black Start.
•Assistance to maintenance staff.
•Isolation of electric power during outages.
•Initiation of Daily Reports.
•Coordination with vendors and suppliers.
•Start the engine of the turbine and control its speed and temperature, pressure levels as required.
•Oversee the mechanism of the turbine and make certain the amount of fuel and air released.
Operation of steam Turbines along with MV, LV and BOP and auxiliaries.
•Co-ordination with field and maintenance staff.
•Isolation and Synchronization of Plant after and before Outage.
•Complete log books and daily event, alarm and activity reports.
•Communication with management according to work.
Start or stop generators, auxiliary pumping equipment, turbines, and other power plant equipment,
•Inspect records and log book entries, and communicate with other plant personnel, in order to assess
Equipment operating status.
•Control and maintain auxiliary equipment, such as pumps, fans, compressors, condensers, feed water
Heaters, filters, and chlorinators, to supply water, fuel, lubricants, air, and auxiliary power.
•Preparation for start-up and shutdown.
•Complete Command and control of Gas fired Engine and generator through DCS and PLC system.
•MV, LV and auxiliaries control.
•Make adjustments or minor repairs, such as tightening leaking gland and pipe joints; report any needs for Major repairs.
•Control generator output to match the phase, frequency, and voltage of electricity supplied to panels.
•Place standby emergency electrical generators online in emergencies and monitor the temperature, output, and lubrication of the system.
•Receive outage calls and call in necessary personnel during power outages and emergencies.
Completed with 1st Division Marks
I have passed my all exam with more than 85% marks. Now i hold Final Degree