Faisal ahmed Mohammed, Electrical Construction Manager

Faisal ahmed Mohammed

Electrical Construction Manager

Arabian Est.

Location
Saudi Arabia
Education
Bachelor's degree, Electrical engineer
Experience
13 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 9 Months

Electrical Construction Manager at Arabian Est.
  • Saudi Arabia
  • My current job since August 2017

A Qualified ELECTRICAL ENGINEER having experience of 13+ years in various fields related to Oil & Gas Industry, Simple & Combined Cycle Power plants for Saudi Electricity Company (SEC), Saudi Aramco, Petrochemical plants for SABIC.

Responsible for Studying all the scope of work, tender documents and preparing Technical & Commercial Proposals, preparing the bid proposals, Quotations, RFQ for subcontractors.
Estimating all the project cost, preparing the project Design(If applicable), Preparing Project BOQ/MTO And involving in all the Project Execution works.
Reviewing of the Engineering Packages as per the project specifications and issuing IFC Drawings for the Contractor.

Sr. Electrical Engineer at Medad Arabia
  • Saudi Arabia - Dammam
  • August 2015 to July 2017

My good Experience and Involvement for carrying out Installation and Inspection activities for all the Electrical MV & HV Activities which involves Switch gears, MCC’s, Transformers, Cables, Lighting System, Grounding, Cathodic Protection, Motors, Cable trays, Duct Banks, Small power System, Termination, testing and commissioning of all the equipment’s

Expert in understanding the project scope of work and can Estimate all the project cost, preparing the project Schedules as per the client requirements, preparing BOQ required for the project, co ordinating with the vendors for the required materials.

Developing good relations and co ordinating with the client in order for the smooth running and successful completion of the project.

Document Review of Quality Procedures, Quality Control Plan, Method of Statements, ITP and Scope of work. Quality Inspection of Electrical Equipment/Materials Receiving, Installation, Testing, Pre-commissioning& Commissioning of Power Systems.

Electrical Quality Control Engineer at Mcc
  • Saudi Arabia
  • March 2014 to July 2015

Implemented and adhered to a three-step procedure for Quality Inspection, as follows:

Understanding the scope of work and co ordinating with the site engineers and supervisors.

Coordinating with the procurement team for the project required material as per the standards and specifications and delivery of the material on time to site.

Coordinating with the Engineering team for the IFC drawings and Shop Drawings.

A preparatory inspection to verify that the planned materials, etc. and safety auxiliaries meet the submittal and contract requirements. Also, to verify that the required previous activity was completed and accepted, along with complete documentation.

An initial inspection along with the Construction team at the start of each new phase of construction to verify that methods, techniques and standard of workmanship are in strict compliance with the contract requirement and also to verify that adequate manpower, equipment and calibrated tools are available.

Follow-up inspection along with the Client / representative in conjunction with the construction team performed on a daily recurring basis as necessary, to verify & document the construction & other activities in accordance with contract requirements.

Project Electrical Engineer at GULF SAF Groups
  • Saudi Arabia
  • June 2013 to February 2014

Developing good relations and co ordinating with the client in order for the smooth running and successful completion of the project.

Material Receiving and Preservation Inspection as per Approved ITP, Project Specifications and Standards.

Carrying Inspection of Material Listing/Labeling, Dimensions, Verification of Vendor Documents with Materials, Material Test Certificates, and Approved Vendor Lists based on Purchase

Installation& Inspection of Low Voltage Cables (Power, Control & Instrumentation)

Installation and inspection of MV/HV Cables (380kv) using Direct Buried Cable & Conduit Trenches, Above Grade Conduits and Cable Trays from Source to Load.

Installation and inspection of LV/MV/HV Cables Duct banks.

Inspection of Continuity and Insulation Resistance Test for Cables Prior to the Installation and Commissioning.

Review of Manufacturer/Vendor documents, Factory Accepted Test Reports and Witness for testing of Medium Voltage and High Voltage cables (380kv) prior to High Potential Withstand Testing.

Installation and Inspection of Iso Phase Busducts (IPBD), High Potential Testing of IPBD Connecting to HV Transformers and Generators.

Inspection / Witness the High Potential Withstand Test for MV and HV (380kv) cables / Cable Bus In Accordance With Standard Procedures and Safety Precautions.

Electrical Conduit (PVC, RGS, EMT, LTFMC) Installation Inspection with Conduit Fittings (LB’s, Seal Fittings) according to the IFC and Electrical Area Classification Drawings.

Above Grade Conduit (RGS, EMT) and Below Grade Conduit (PVC Coated RGS, PVC) Installation Inspection of Conduit routings, Conduit Duct Banks and Electrical Manholes according to the Standards and Approved Drawings.

 Witness Installation/Pre-commissioning Inspection for Hazardous Location Conduit Sealing and Fire Retardant Seal for all conduit and Cable Tray entries through Wall Penetrations of Plant Buildings and Control Cabin entries.

Cable Tray Installation, Supports, Bonding, Expansion Splice Plates and Installation of the Cables on the Cable Trays according to the NEC and NEMA Standards

Erection, Testing and Commissioning of the LV and MV Motors with Approved Installation and Testing Procedures.

Conducting Quality Inspection according to the Electrical Area Classification Drawings and NEC for the Installation of Electrical Equipments using at Classified areas.

Inspection of Area lighting, Perimeter Lighting, Task lighting and Indoor Lighting Installation and Illumination Testing with Photo Cell according to the Standard Drawings and Procedures.

Inspection of Receptacle Outlets (Weather Proof) Installation Indoor and Outdoor and Power Outlets for Maintenance Purpose.

Inspection/Winteness the Pre-commissioning Tests of Lighting Panel, Power Panel Boards, LV Switch Boards (Non-Industrial Purposes) LV Motor Control Centers (MCC) and LV/MV Switchgears.

Installation and Inspection/Witness for Installation of Transformers, GSU (Generator step-up transformer 18/380 KV), Auxiliary Transformers, Liquid Filled and Dry Type Transformers.

Witness for Testing and Commissioning of Transformers, GSU (Generator step-up transformer 18/380 KV), Auxiliary Transformers, Station Transformers, Liquid Filled and Dry Type Transformers.

Installation, Testing and Commissioning of Cathodic protection (Plant) System includes Galvanic Anodes, 3-Point Test Station, Thermite Welding for CP Cables,

Welding/Coating the CP cables to Underground Hydro-carbon Pipelines with Approved Methods and Standards.

Inspection of Grounding/Earthing Installation and Pre-commissioning for all Electrical Equipment's, Systems and Structures, Ground Grid, Ground Pit & Ground Well Installation, Ground Grid to Equipment, System and Structures, Gates and Fence connections, Ground Resistance Resting and Torque Testing. Grounding/Bonding for Direct Buried Conduits, Above Grade Conduits and Cable Tray.

Quality control and Assurance Engineer at Arabian Bemco Contracting Company Ltd.
  • Saudi Arabia - Khobar
  • October 2012 to June 2013

Implemented and adhered to a three-step procedure for Quality Inspection, as follows:

Understanding the scope of work and co ordinating with the site engineers and supervisors.

Coordinating with the procurement team for the project required material as per the standards and specifications and delivery of the material on time to site.

Coordinating with the Engineering team for the IFC drawings and Shop Drawings.

A preparatory inspection to verify that the planned materials, etc. and safety auxiliaries meet the submittal and contract requirements. Also, to verify that the required previous activity was completed and accepted, along with complete documentation.

An initial inspection along with the Construction team at the start of each new phase of construction to verify that methods, techniques and standard of workmanship are in strict compliance with the contract requirement and also to verify that adequate manpower, equipment and calibrated tools are available.

Follow-up inspection along with the Client / representative in conjunction with the construction team performed on a daily recurring basis as necessary, to verify & document the construction & other activities in accordance with contract requirements.

Quality Control Engineer at Sejong Corporation
  • Saudi Arabia
  • January 2012 to October 2012

Implemented and adhered to a three-step procedure for Quality Inspection, as follows:

Understanding the scope of work and co ordinating with the site engineers and supervisors.

Coordinating with the procurement team for the project required material as per the standards and specifications and delivery of the material on time to site.

Coordinating with the Engineering team for the IFC drawings and Shop Drawings.

A preparatory inspection to verify that the planned materials, etc. and safety auxiliaries meet the submittal and contract requirements. Also, to verify that the required previous activity was completed and accepted, along with complete documentation.

An initial inspection along with the Construction team at the start of each new phase of construction to verify that methods, techniques and standard of workmanship are in strict compliance with the contract requirement and also to verify that adequate manpower, equipment and calibrated tools are available.

Follow-up inspection along with the Client / representative in conjunction with the construction team performed on a daily recurring basis as necessary, to verify & document the construction & other activities in accordance with contract requirements.

Electrical QA/QC Engineer at SATORP
  • Saudi Arabia
  • April 2011 to November 2011

Implemented and adhered to a three-step procedure for Quality Inspection, as follows:

Understanding the scope of work and co ordinating with the site engineers and supervisors.

Coordinating with the procurement team for the project required material as per the standards and specifications and delivery of the material on time to site.

Coordinating with the Engineering team for the IFC drawings and Shop Drawings.

A preparatory inspection to verify that the planned materials, etc. and safety auxiliaries meet the submittal and contract requirements. Also, to verify that the required previous activity was completed and accepted, along with complete documentation.

An initial inspection along with the Construction team at the start of each new phase of construction to verify that methods, techniques and standard of workmanship are in strict compliance with the contract requirement and also to verify that adequate manpower, equipment and calibrated tools are available.

Follow-up inspection along with the Client / representative in conjunction with the construction team performed on a daily recurring basis as necessary, to verify & document the construction & other activities in accordance with contract requirements.

Electrical Engineer at Saudi Bin Laden
  • Saudi Arabia
  • June 2010 to March 2011

Engineering and designing.
Load calculation of Lightning & Power Systems
Selection of Circuit Breakers & disconnecting switches
Calculation of Bill of Quantities
Interaction with the supplier for the selection of best quality materials
Preparation of material comparison sheet Submission of shop drawings for consultant approval.

Education

Bachelor's degree, Electrical engineer
  • at kakatiya university
  • April 2010

Kakatiya Thermal Power Station - India Electrical Design Engineer (Trainee)

Specialties & Skills

Preparation
Materials
Power Systems
Switches
computer
Management
Electrical engineer

Languages

English
Expert
Hindi
Expert
Arabic
Intermediate
Urdu
Native Speaker

Memberships

Saudi Council of Engineers
  • Technical Engineer
  • June 2019

Training and Certifications

Saudi Council of Engineers Certificate (Training)
Training Institute:
SEC
Engineering degree (Certificate)
Date Attended:
May 2010

Hobbies

  • Cricket
    Am an expert in it, i am playing since an 9 years old.