Work Experience

Total years of experience :19 years, 9 Months

MEP Project Manager at EGICAT
  • Egypt - Asyut
  • My current job since September 2021

petrojet - ANOPC

Project Manager at Sraco
  • Saudi Arabia - Abha
  • March 2019 to March 2022

Hospitals Facilities Management

MEP Area Manager at ECD
  • Egypt - Cairo
  • June 2020 to September 2021

banks, commercial renovation

Project Manager at Amer Group
  • Egypt - Cairo
  • October 2017 to May 2018

MEP Project Manager for Porto Pyramids project

consultant at Alexander Proudfoot
  • Egypt
  • April 2016 to October 2017

Participate in implementing lean six sigma - Lafarge Egypt.

Project Manager - Devolper at AZMEEL Contracting
  • Saudi Arabia - Jubail
  • November 2014 to April 2016

MEP Project Manager
SATORP - SAUDI ARAMCO TOTAL (Housing Ownership Program) Project.
106 villas (EPC)
Fully responsible to manage the design, Shop Drawings, construction and execution of the project.

Schedules, Budgets, Cost Control, Value Engineering, Specifications, Procurement, and Subcontractors are all under the scope of my role.

Manage Engineers & Project Team, Prepare and Present Reports to Management, Establish KPIs and monitoring them.
Manage as required project to ensure on time delivery, with the required specs and within budget.

Project Manager at Egyptian Airports Company (EAC) joint venture with French Aero ports De Paris [ADP] Management
  • Egypt - Luxor
  • March 2007 to July 2014

implementing the program for development LUXOR International Airport- Funded from the world bank (550 million EGP).
My role in the program - Electromechanical Project Manager - Key responsibilities include management and planning: -
1- All the new projects related to,
Generation stand by system
Pumping system
ABHS (Airport Baggage Handling System)
BMS (Building Management System)
HVAC, Child water System (Electricity and electronics)
Elevators
Escalators
Automatic sliding doors.
2- The operation and maintenance activities for the mentioned above systems, plus Analysis, plan and execute maintenance contracts effectively to ensure that the budgeted profitability is achieved.
3- team player with PMO team for needed Project Management Plans (PMP) -
Tracking current projects.
ON - THE- JOB TRANING
Allen Bradley PLC-5 (SLC 5/04), ROCKWELL Software for Allen Bradley
RS logix500 programming.
Schneider - electric UNITY PRO XL PLC programming
HMI, Allen Bradley Panel builder 32
TRAINING
Self-inspection for airports (Egyptian civil aviation authority)

Field Engineer at Islamic Group Companies
  • Egypt - Cairo
  • March 2005 to March 2007

Key responsibilities include troubleshooting and repair work for equipments including in Bi Oriented Polypropylene (BOPP) Films Production Lines for: Buckner & DMT, Kmpf & Atlas Slitters, Galileo & general Metelizer Machines, Factory Utilities Engineering.
ON - THE- JOB TRANING
Achieve Automation (Process Control) & Maintenance Work for:
MCC (Machine Control Center) With AC & DC Drives For:
Siemens simovert master drive \[MC, VC\], simoreg K.
Telemecanique Rectivar, Altvar 66, 68
Hand on skills In Signal & Power Electronics.
PLCS Hardware Configuration (commissioning & start up) for
Siemens S5, S7.
Telemecanique X-Tel
PLCS & SCADA Software:
PLC programming for Siemens s5, s7 (SIMATIC Manager).
PLC programming for X-Tel Pl7 (telemecanique).
CITECT (SCADA), Diagnostics & troubleshooting
Achieve Instrumentation & Calibration Works.
AchieveUtilities maintenance work (Boilers-chillers-Compressors-Cooling towers).

Project Engineer at Multinational (Japan) electromechanical constructions KINDEN corporation
  • Egypt - Cairo
  • September 2003 to March 2005

In The Pump Station Project of water Improvement for Northern
Pyramids Area. \[Japan's aid\].
Key responsibilities include Installation Work For:
\[Indoor & Outdoor Lighting - Underground Cables - Emergency and standby Systems - Circuit Breakers - Bus Bar and Bus Duct - Low Voltage Distribution Systems - Medium Voltage Power Supply and Distribution Systems - Power Factor Correction system-Earthing System - Fire Alarm System - Lightning System- Control Panels Commissioning\]
ON - THE- JOB TRANING
AutoCAD Shop drawing & as built for Electrical Systems in Electromechanical Projects

Education

Diploma, PMP
  • at Project Mangement institute
  • July 2012

PMP Number: 151561

Bachelor's degree, electrical power and machines
  • at cairo university
  • July 2003

[May, 2003] Faculty of Engineering, Cairo University. [63.63%] BS.c Electrical Power

Specialties & Skills

Facility Management
Electrical Engineering
project mangement , MS Project 2013 , Primavera P6
Time planning and maintaining
Communication skills
Computer skills [Hardware, Software]
Analyzing prob. skills
Self motivator
Data analysis with Minitab - MS Excel 2010
Presentation - Power Point 2010
Team Player
Project Management business development
Project Management infrastructure establishing,
Autodesk Revit MEP 2015
Implementing Lean Six Sigma (LSS) for Industrial & Contracting Business Processes.

Languages

Arabic
Expert
English
Expert
French
Beginner

Memberships

Project mangement institute ,USA
  • 2185449
  • July 2012
Egyptian Engineering Syndicate
  • Affiliate
  • August 2003
NSC OSHA
  • ID#OSC17093620
  • May 2015
Saudi Engineering syndicate
  • member
  • November 2015

Training and Certifications

Certified Six Sigma Green Belt (CSSGB) (Certificate)
Date Attended:
September 2012
Valid Until:
September 2012
PMP (Certificate)
Date Attended:
September 2011
Valid Until:
September 2011

Hobbies

  • read and search , football playing