فيصل صابر, Field Incharge

فيصل صابر

Field Incharge

Pakistan Oilfields Limited

البلد
باكستان
التعليم
بكالوريوس, Chemical Engineering
الخبرات
19 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 2 أشهر

Field Incharge في Pakistan Oilfields Limited
  • باكستان
  • أشغل هذه الوظيفة منذ ديسمبر 2013

Key Responsibilities:
● Operation of Gas Processing plants:
- Natural Gas Sweetening plants (using MEA and MDEA respectively)
- Natural Gas Dehydration (Absorption using TEG, Adsorption through Silica gel & Molecular sieves )
- Crude Oil / NGL separation operations
- LPG plant: 75 MMSCFD capacity plant using turbo expander for C3+ (LPG, Solvent oil & Gasoline) recovery using distillation towers
- Sulphur Recovery Units (using Claus’ process)
- Crude Stabilization Unit (CSU)
- Well head operations (Control panel operations i.e. well opening / shutting, well testing etc)
- Utilities & Custody transfer units
• Recommend changes in Process, develop SOPs and Monitor plant Key performance indicators (KPI) using software i.e. Historians (to record Flaring history, Propane slippage, off spec products etc)
• Monitor plants performance (Using Simulation models i.e. ASPEN HYSYS, Laboratory testing, feed gas GC analysis to monitor product yields and plant efficiency)
• Process Optimization, minimize chemical consumptions, identifies process-related problems and plans suitable cost effective solutions.
• Develop and design documents including training manuals, process outlines, flowcharts and implementation procedures.
• Assess non conformances, Hazard identification and risk assessment. Conduct H2S trainings and Participate in HAZOP, SIL, and HIRA studies, respond proactively and implement effective corrective and preventive actions.
• Member of team Incident/ accidents investigation team. Prepare and submit reports to the management committee.
• Implemented and maintained hazard reporting culture in the company employees.
• Ensure implementation of PTW System.
• Participate in the profit improvement program (PIP), member of project steering team.
• Economic Evaluation & comparison of Feasibilities, Process Audits & financial analysis. Develop and review Capital & Revenue Budgets
• Contract’s review of custody transfer of crude oil and Gas with respective customers
• Manage & Train Process engineers team to accomplish the corporate goals, competency gap and projects while keeping high morale of team during extended working hours and work pressure safely and efficiently.
• Chemical inhibition calculation and dosage during high winters through ASPEN HYSYS
• As a lead process engineer, have been part of annual appraisal/ranking
• Represent process department at OCM and TCM with JVP’s.
• Site Manager during Annual Turn Around
• Coordination with maintenance department for preventive and corrective maintenance schedule follow up
• Internal and External Audits

Achievements:
• Identified cause of high Propane slippage in LPG as improper regeneration of molecular sieves for drying the feed gas and adjusted the flow rate of dryer regeneration gasresulted in increased revenue from LPG production.
• Enhance process controls by designing automation loops for Gas processing plant (Meyal Production Facility) and successfully commissioned Honeywell PLC system.
• Save revenue in terms of chemicals consumption controls through plant optimization.
• Lead the team for planning/execution of developing Bela Oilfield (Well testing after work over job, line laying, 3/2 phase separations, compression and injection)
• Successfully commission New Separation Trains (2 Trains) at Pariwali Production Facility that includes HP separators, MP separators and LP separators for individual gauging of Jhandial-1 well and Khaur North-1 well.
• Developed HMI screen for PLC system installed at Pariwali Production Facility with inclusion of new pressure / temperature / flow loops and successfully commissioned PLC system.
• Successfully achieve goal of zero freezing in Pariwali-Meyal gas line by chemical inhibition after flow assurance study using Aspen HYSYS.
• Successfully achieve Pariwali Production Facility outlet sweet gas quality parameters at reduced operating pressure (from 800 psig to 700 psig) after detailed study using Aspen HYSYS.

Senior Process Engineer في PGNIG
  • باكستان
  • يونيو 2013 إلى ديسمبر 2013

•Erection/Commissioning of TEG based Natural Gas Dehydration Plant.
•Smooth operation of TEG based Natural Gas Dehydration plant.
•Erection/Commissioning of 3 phase water/condensate separator.
•Ensures effective PTW system implementation and disables overrides up on completion of maintenance jobs.
•Monitoring of Custody equipments (Flow computer, Moisture Analyzer)
•Joint Calibration of custody transfer equipment (online Flow computer, Gas chromatograph & Moisture Analyzer) with client and ensured contractual limitations of Sale Gas Quality
•Interpreting Process Flow Diagrams (PFD) & Piping & Instrumentation Diagrams (P&IDs)
•Manage expansion of project and debottlenecking, Correspond with contractors & vendors for on-going projects.
•Ensure Pre-commissioning and commissioning standard procedures implementation keeping in view of company’s HSE policy.
•Change Management and execution of debottlenecking within HSE standards. Participate in HAZOP.

Senior Process Engineer في Petroleum Exploration (Private) Limited
  • باكستان
  • سبتمبر 2006 إلى يونيو 2013

Key Responsibilities
● Operation of
* 35 MMSCFD gas processing plants with M/s Emerson DCS (Delta V)
* MDEA Gas Sweetening (make: M/s Presson Descon, Canada)
* TEG Gas Dehydration plants
* Well Surface Operation
* Wellhead Compression System
● Operation of NGL storage, stabilization, movement to National Oil Refinery, Karachi (NRL).
● Process engineering support in extension project of Gas sweetening plant in Hassan Gas field, Gas dehydration plant in Badar oilfield.
● Performed Excel spread sheets Calculations, Technical Calculations
● Well head Gas compression system project installation, commissioning and smooth operation using M/s Cameron &Ajex Compressor set.
● Technical Evaluations of New Gas Facilities, Chemicals, Utilities and Spares
● Manage Projects of expansion and debottlenecking, Correspond with contractors & vendors for ongoing projects as Project Manager (e.g Wellhead Compression System commissioning, Expansion of Facility etc)
● Participated in Annual Turn Around’ as Site Manager
● Interpreting Process FlowDiagrams (PFD), Piping & Instrumentation Diagrams (P&IDs)
● Planning / executing / technical assistance of the development projects of process / unit’s modifications, annual shut down and debottlenecking in process.
● Adheres to SOP's, routine operations and the monitoring of production equipment using DCS and PLC based systems.
● Supervise Process Control Philosophies, Logic checks and up gradation of DCS.

Achievements in M/s PEL:
● Selected as Plant Incharge
● Selected as Lead Process Engineer
● Trouble Shooting of Gas Sweetening Stripper section (offering better regeneration of MDEA)
● Project execution of commissioning and successful trial run of Natural Gas Compression System (M/s AJEX)
● Project Member of Plant Expansion (Up gradation) team

Process Engineer في Faras Combine Marketing Co. Pvt Limited
  • باكستان - لاهور
  • سبتمبر 2004 إلى يناير 2006

• Manage shift activities as per provided production schedule.
• Monitor and ensure process parameters.
• Prepare monthly reports i.e. production, process, material consumption and raise material demands accordingly.
• Ensure proper safety measures for storage of product.
• Participate in routine and preventive maintenance.

الخلفية التعليمية

بكالوريوس, Chemical Engineering
  • في University of Engineering Technology
  • أغسطس 2004

Specialties & Skills

Operation
Process Flow
Chemical Inhibition
LPG operations
Crude Oil Terminal Operations
Budget Development
Sulphur Recovery Units
Plant Optimization
Annual Turn Around
Natural Gas Processing
Staff Training
Staff Management
Crude Oil Processing
Excel based Calculation Reports
Aspen HYSYS
Plant Start-up / Shutdown
Production Forecasting
Microsoft Office
Team Building
Incident Investigation

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس

العضويات

Pakistan Engineering Council
  • Member
  • October 2004

التدريب و الشهادات

Internship (الشهادة)
تاريخ الدورة:
June 2002
صالحة لغاية:
July 2002
Internship (الشهادة)
تاريخ الدورة:
February 2006
صالحة لغاية:
April 2006

الهوايات

  • Cricket, Football