Faisal Shahbaz, Project Engineer Electrical

Faisal Shahbaz

Project Engineer Electrical

Larson and Toubro Saudi Arabia (LTSA)

Location
Pakistan
Education
Bachelor's degree, Electrical Engineering
Experience
17 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 5 Months

Project Engineer Electrical at Larson and Toubro Saudi Arabia (LTSA)
  • Saudi Arabia - Sakaka
  • My current job since April 2021

Main Contractor: LTSA
Client: National Grid

Project: 14KM, 132 KV Cable Laying from Sakaka SS/D to SS/C and to SS/Tuwair

Role and Responsibility:

Manage construction activities in coordination with main contractor and Client for 132KV cable laying. Procurement of materials for the construction of 1200 mm 2 cable trench, duct bank and FOC sub ducts laying. Manage and Lead cable pulling work according to method statements and SEC procedures. Interface with Local authorities for location ad protection of underground utilities and for rehabilitation of area after completion of each section and inspection.

Project Engineer at Industrial Symbols Co. (ISCO)
  • Saudi Arabia - Khobar
  • April 2019 to April 2021

1. New Engineering Conference Room, Shedgum Gas Plant,
2. Project Engineer at -Mud Plant Office Building in Marines Chemical Yard in Tanajib
Responsibilities:
• Manage the Construction activities (Civil, Mechanical, Electrical and Control).
• Review engineering design packages, Area Classification drawings. Review single line diagrams and detailed lay outs for Electrical, Grounding Protection, FADS and DCS to verify adherence to standards. Submit design packages to PMT for approvals.
• Supervise the site construction works and adherence to safety, quality and budget.
• Identification of project requirements and manage materials.
• Manage In house calibration/testing of instrumentation.
• Attend weekly meetings with client
• Pre-commissioning and Commissioning activities

Sr Electrical Engineer at Gulf Consolidated Contractors
  • Saudi Arabia - Dammam
  • November 2018 to March 2019

1. Sr. Engineer Electrical: (OMPP) -Oil &Gas Well Head-Ti-In Sites Southern Area Zone I and Zone IV. NO.:11-18000-8988, 11-18000-8972, 11-18000-8974, 11-18000-8715, 11-18000-8994
HRDH-523 TIE-IN- GOSP2, HRDH-524 TIE-IN-GOSP2, HRDH-339 SURFACE EQUIPMENT AND CP, GHZL-56 TIE-IN-GHZL-57.
Responsibilities:
• Manage and Supervise the Installation activities for Electrical and Instrumentation.
• Review engineering design packages, Area Classification drawings. Review single line diagrams and detailed lay outs for Electrical, Grounding Protection and prepare MR packages for approval.
• Study Logic Diagrams, Cause and effect diagrams and lead the termination supervisors.
• Dispatch Instruments for calibration (XI, PI, TI, FDTs, H2S/LEL Indicators and RTDs).
• Supervision of Installation teams for Power Distribution Equipment, AJBs, DJBs, UG Ground, Power & Control cables, ESD, RTU Cabinets and Equipment Sheltecrs and Field Instruments.
• Cold and hot Loop tests for field instruments. Installation of CP for pipe lines.
• Coordination with Pre commissioning team for MCC.

Electrical Engineer at IKAN Engineering Services Pvt Ltd.
  • Afghanistan - Tarinkot
  • March 2014 to May 2018

1. Electrical Engineer at PARCO Project -NEW HRL GAS COMPRESSION. Project involved development of a 30 MMSCFD gas and 100 BBL condensate facility including two wellhead facilities, gas gathering, feed gas compression and gas metering at Sui Gas Field.
2. Construction Engineer at LNG Gas Pipe line Project (SNGPL) Mechanical, E&I, CP.
3. Construction Engineer at New Water Supply Pipeline (Gharibwal Cement) Mechanical Assembly, Welding Works.
4. Construction Engineer at Telenor Solar Project -Northern Region: Civil Construction, Power and Grounding Protection, TI Installation and Solar System.
Where major responsibilities were to review design packages, SLDs, ILDs, manage materials and execution teams. Site management/supervision of construction and Coordination with client for progress meetings and pre commissioning activities.

Site Manager at North America Construction Company
  • Afghanistan
  • September 2011 to May 2013

1. Site Manager at Marines Corp Project -Afghan Adobe Barracks Phase II. 6.5 MW Diesel Start Generator Power Plant. Civil, Mechanical, Electrical, E&I.
2. Site Manager at Marines Corp Project- Afghan Abode Barracks Phase I: Troops Housing -Civil, Electrical and Mechanical.
Where major Responsibilities were to manage the project construction from initial design stage to mechanical completion on turnkey basis. To lead a team of Multi Discipline Engineering staff and sub-contractors for successful completion, pre-commissioning and turnover. Coordinate with design contractor to address design issues to the satisfaction of client and applicable standards.

Project Engineer Electrical at Task Force Innovation Intl. (Afghanistan)
  • Afghanistan
  • October 2009 to April 2011

• Project Manager at USAF/DynCorp Intl./KBR Projects -TROOP HOUSING at Kandahar Air Field:
Major responsibilities were to manage the Installation of RLB structure, pre-fabricated of roof, platforms and stair cases. Water proofing, Interior Electrification and Power Supply System. Coordination with Pre-Fab manufactures and liason with client for delivery schedules and completion schedules. Supervise installation of HVAC and Fire Detection System.

Electrical Site Engineer at Pakistan Power Construction
  • Pakistan - Islamabad
  • May 2007 to September 2009

• Project Engineer at PPC/Habib Rafiq - 132/11.5 KV Gas Insulation Switchgear Substation.
• Project Engineer at ZTE/Telenor GSM Project Phase II Northern Areas. TI Installation, Power and Grounding
Major responsibilities were site management and supervision of construction and erection works, Installation of grounding grid and exothermic joints. Maintain weekly reports and project documentation. Coordination with consulting department to attend inspection activities. Testing and Commissioning activities.

Electrical Site Engineer at NileCo General Contracting
  • Kyrgyzstan
  • June 2005 to April 2007

• Site Engineer US Air Force Project -Base Support Facilities (BSF):
• Site Engineer US Air Force Project -Base Civil Engineering (BCE):

Major responsibilities are as team lead for construction and installation MV/LV 11KV/0.4KV OHPL, 0.4/220V, 220/110V step down XFR, Protection Equipment, Hoists, control cables, rails MCC, MDPs, SDBs, ATS/MTS, Install and Terminate UG cables and control wires. Pull, terminate and testing of data networking cables (CAT6, CAT4). Coordinate with client to clear punch lists.

Education

Bachelor's degree, Electrical Engineering
  • at Osh Technological University
  • September 2005

Electrification and Automation in Industry

Diploma, Pre Engineering
  • at Govt. Zamindar Degree Science College
  • September 1998
High school or equivalent, Science
  • at Govt Naseem High School, BISE Gujranwala
  • September 1995

Science Subjects

Specialties & Skills

Electrical Controls
Electrical Wiring
Instrumentation
Power Distribution
Telecommunication
Project Supervision
Teamwork
Cost and Estimation
Project Managemnt
Design and Estimation

Languages

English
Intermediate
Russian
Intermediate

Training and Certifications

Contractor Work Permit Receiver Prerequisite (Training)
Training Institute:
Human Assets Training
Date Attended:
January 2020
Duration:
32 hours

Hobbies

  • Book Reading