Faiyaz Ahmed, Electrical Site Engineer/SITE MANAGER

Faiyaz Ahmed

Electrical Site Engineer/SITE MANAGER

Ministry Of Defence - MEDICAL SERVICES DIRRECTORATE- EWD

Location
Saudi Arabia - Khobar
Education
Bachelor's degree, ELECTRICAL ELECTRONICS ENGINEERING
Experience
23 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 11 Months

Electrical Site Engineer/SITE MANAGER at Ministry Of Defence - MEDICAL SERVICES DIRRECTORATE- EWD
  • Saudi Arabia - Dammam
  • My current job since March 2015

SUMMARY: Over 24 plus years of Experience in Managing Supervision and monitoring,
Coordination & implementation and Testing and Commissioning in All phases of construction
Field of ELECTRICAL & MEP in Green field Sustainability, and Leadership in Energy and
Environmental projects (LEED Certified Projects) ESTADAM, MOSTADA, GSUS.
SITE IMPLEMENTATION and conduct site inspections, witnessing testing & commissioning, monitoring progress on site, field reporting, reviewing technical submittals and design packages for constructability acquiring resources and coordinating the efforts of team members and third-party contractors or consultants in order to deliver projects according to plan. Implementing quality control and safety throughout its life cycle
To plan, execute, and finalize projects according to strict deadlines and within budget Roles and Responsibilities: Review of Design/Shop Drawing, Installation, Inspection, Implementation, Testing and Commissioning and Final Handover work activities of ELECTRICAL/MECHANICAL MEP Services System and Subsystems.

Electrical Low Voltage Distribution/Medium Voltage Distribution Network, Main Distribution Panel SMDB, EMDB Distribution Panel Board, Power Socket /Switches Various types of lighting Fixtures, Grounding Pit, Ring Main Unit, Switchgear Network, Automatic Transfer Switch, Package Substation, Transformer up to 2000KVA, Backup Generator and Uninterrupted Power Supply, Internal and External Power/lighting.
Supervised Installation of Equipment such as but not limited to MV, LV Switchgears, MDB panel board, UPS.

Reviews Shop Drawings and Material Submittal and given final approval.

Study design drawings & documents in accordance with BOQ and the project specification with required standard codes (NEC, ANSI, UL listed, NFPA, & SASO).

Closely Monitors Site Execution Works of Installation, & Controls for Quality
Provided feedback by submitting Weekly Progress Report to client & co-ordinate

Arranged regular meetings to finalize & resolve critical site issues, & observations.

Checked RFIs and advised corrections and amendments as per site situation

Witness of conventional performance tests equipment’s- circuit breakers, transformers, earthing system, switchgear, protection-primary & secondary injection test

Witnessed & validate Testing & Commissioning report for systems & equipments.

Reviewed & given approval for As Built drawing according to the site executions work.

Prepared punch/snag list on site for uncompleted or sub-standard installation work and issued to contractor to complete action. Follow up same until it closes.

To Ensure Execution of project as per the Project Scope of work, Time Schedule and Budget

To Ensure All Material to be used at Site should be approved by EWD Head office. To Check and Ensure that All Material and Equipment are installed are in accordance with Approved Submittals and Approved Shop Drawing.

To Access Work Progress and make technical report from therein specifying to up to Date Accomplishment and completion of Site

To Check and ensure that All Site works implementation should be in adherence to the Projects specification and Approved Shop drawings.

Preparing the Daily/Weekly and Monthly Report and Submit to Project Manager. Prepare/Review the QA/QC Monthly Report and submit to Project Manager

Witness the Testing and Commissioning and final Handover all of the above system to End user
Safety & Compliance Management,

Monitoring Daily labor and Manpower input of Contractors and subcontractors. Attending Site Meetings with Project Officer/Contractors and Site Engineers

Checking and Inspection of Site Work Activity as per RFI Request from contractor, Review of Material Submittal, Shop Drawing Tender drawing, and As Built drawing

Verification of AS Built Drawing as per Actual Project Site, Preparing SNAG List and Remaining works and Submitting to Higher Project Management

PROJECT MANAGER at InteGreat PMC India pvt ltd
  • India - Bengaluru
  • February 2013 to September 2013

Project Management, Construction Planning, Scheduling Supervision, Monitoring administration, Complete Cycle of Project Deliverables from Project Kick off till Handover

• Proven ability to priorities effectively & meet deadlines with leadership skills involving managing, developing & motivating teams to achieve objectives
• Conflict resolution skills and effective negotiating skills
• Verifiable track of record for the successful completion of multi-million dollar projects
• Dedicated, self-motivated, results oriented.
• Computer skills: Microsoft Project, Excel, PowerPoint.

Work History

1) InteGreat Project Management India Private Ltd.- From Feb 2013 - Sep 2013.

Client: Infosys technology Limited, Mysore.

Role: Project Manager

Responsible for the Complete Cycle of Project Deliverables from Project Kick off till Handover,
Manage and lead the Mechanical Electrical Plumbing teams in carrying out all Engineering activities for large Software Development Block-07(INFOSYS Technology Project.
Execute projects according to the Scope, Cost, Schedule and Budget.

Coordinate between the Mechanical Electrical and Plumbing Engineer and serve as the bridge between engineering, procurement and project management teams.

Coordinate activities and resolve issues among Consultants contractors and other parties to allow construction activities to progress according to plan and final completion.

Organizing projects with emphasis on quality control, Engineering, Planning, and Coordination.

Prepares/ reviews reports and forecast, including summary of construction progress, job manpower forecasts.

Monitor the activities of Sub contractors to ensure compliance with specifications and procedures.

Responsible for project development: preliminary engineering to detail designs to construction and the final safe turnover.

Prepares/ reviews reports and forecast, including summary of construction progress, job manpower forecasts.

Monitor the activities of Sub contractors to ensure compliance with specifications and procedures. Responsible for managing & monitoring project costs & for the revenue generations as per Contractual terms
Responsible for Delivering Multiple Projects.
Responsible for Customer and People Management.
Manage the vendors & suppliers who support the project progress, Manage Project Cash flows.


Project Name(1) Construction of Infosys, Mysore (SDB-07 Block) of about 110 Crores.
No of floors 1B+GF+7F+TF (Radiant Cooling Slab)
Built Up Area 39, 428 sqm
Client M/s Infosys
Civil Contractors M/s Sobha Developers Ltd.
PT Contractors M/s Utracon Structural System Pvt Ltd
Structural Consultants M/s TRC Engineering (I) Pvt Ltd.
Architect M/s Architect Hafeez Contractor.

Project Name(2) Construction of Infosys, Mysore (Driver’s Lounge) of about 3 Crores.
No of floors GF+TF
Built Up Area 390sqm
Client M/s Infosys
Civil Contractors M/s Sobha Developers Ltd.
Structural Consultants M/s TRC Engineering (I) Pvt Ltd.
Architect M/s Architect Hafeez Contractor.

Project Name(3) Construction of Infosys, Mysore (Facility Block) of about 8 Crores.
No of floors BF+GF+TF
Built Up Area 800 sqm
Client M/s Infosys
Civil Contractors M/s Sobha Developers Ltd.
Structural Consultants M/s TRC Engineering (I) Pvt Ltd.
Architect M/s Architect Hafeez Contractor.

Project Name(4) Construction of Infosys, Mysore (Lake-1 near HF-3) of about 55 Lakhs.
Built Up Area 6335 sqm
Client M/s Infosys

Project Name(5) Construction of Infosys, Mysore (Data center) of about 2 Crores.
No of floors GF
Built Up Area 1120 sqm
Client M/s Infosys
Civil Contractors M/s Sobha Developers Ltd.
Structural Consultants M/s TRC Engineering (I) Pvt Ltd.
Architect M/s Architect Hafeez Contractor.

Senior Project engineer at King Abdulla University of Science and Technology
  • Saudi Arabia - Jeddah
  • May 2009 to June 2012

Fire alarm specialist

at KING ABDULLA UNIVERSITY

Location: Jeddah, Saudi Arabia
Company Industry: Engineering
Job Role: Safety
May 2009 -June 2012

•Working under the direction of Maintenance manager to oversee the maintenance program of the fire alarm systems within the Academics, Administration Buildings and laboratories within the Main Campus.

•Track operation and maintenance, service and testing on electronic fire alarm systems within the Academic, Administration building and laboratories within the Main Campus.

•Read and interpret blueprint diagrams submittals specification software systems program, schematics and operational product manuals.

•Verify the alarm initiating and indicating devices are functioning properly, the sufficiency of power r supply (battery back-up).
•Monitor and verify points correctly (remote annunciates) and if signal reached monitoring center.
•Hands-on installation, operating and maintenance knowledge on fire alarm devices such as Smoke detectors, Heat detectors, Speaker strobes, Siren, Pull station, CO Sensor, etc…
•Ability to define fire related risk and recommend proper solutions with minimum financials impact.

•Lead team to analyze and report alarm trend and put action in place to improve wrong trends.
•Track and assure of proper operation and maintenance to all fire alarm systems are in place.
•Review operation and maintenance task vs. safety related codes and correct wrong.
•Hands-on working knowledge of test and calibration of equipment includes Digital multi meter, digital analyzers, battery analyzer, frequency meter, decibel meter, and communicating devices.


•Review sequence of operation and cause and effect matrix of Fire alarm system in coordination with Authority having jurisdiction.

•Operation and maintenance of fire alarm system and its equipment specification.
Ability to teamwork in office and job site with others staff and subordinates.
•The knowledge and ability to research local fire codes, NFPA and ISO standards

•Performing Quarterly, Semi-annual and Annual preventive/corrective maintenance of Main Campus Fire alarm system..
.

Senior Project Engineer at Saudi Oger LTD.
  • Saudi Arabia - Jeddah
  • May 1998 to March 2009

• Managed Fire Alarm, fire detection, fire suppression system, Security (CCTV/Access Control/Intrusion Systems) & BMS/BAS projects in complex facilities; delivered projects valued between $ 10 - 15 million.
• Managed the Fire Alarm maintenance service contract works in complex
• Participated in contract reviewing & tested procedures; managed installation and commissioned activities from engineered drawings of Electronic Systems at customer sites in a timely, cost-effective, professional manner relating to Code & Standards.Ensured project forecast reports, budget and plans are in accordance with company processes & procedures & the reporting requirements of the client
•Fire alarm and detection systems
•Established strategic plans & objectives for security & Life Safety management & Five year Security management plan.
•Performed ongoing security risk analysis within the facility with a focus on mitigating Security & Life Safety risks.
•Reviewed tender for the retrofit Fire Alarm installation & verification work performed by electrical & Fire Alarm contractors on a daily basis.
•Ensured the highest quality of work is conducted in accordance with the specification, codes & standards.
•Tenant Coordinating & attending regular site meetings.
•Ensured health, safety & environmental regulations are met.
•Solved technical problems of electro-mechanical issues with the consultation from engineers & contractors.
•Monitored all service costs to ensure that these are within agreed budget limits.
•Discussed service enhancements and potential variations to the contract .
•Maintained all necessary records to ensure the effective monitoring of contracts.
•Directed and control all maintenance staff to ensure that they are appropriately motivated and trained and carry out their responsibilities to the required standards.
•.

Education

Bachelor's degree, ELECTRICAL ELECTRONICS ENGINEERING
  • at Gulbarga university,Gulbarga
  • June 1995

Dear Sir, I am a B.E.Electronicsand communication, Graduated in 1995 from the Gulbarga university gulbarga,. Since Graduation, have been working in Saudi Arabia as Contractor, Consultant and Client Representative, i.e. Operation and maintanance, Construction, Consulting and Quality control of several types of buildings. I have been involved in project Management, as well as technical aspects of Project execution. I was very deeply involved in Project Management in terms of project planning,Operation and maintanance , time scheduling and quality assurance, handover procedures, snag listing handover forms, Operation and Maintenance Manuals, complete list of Equipment Suppliers, as built drawings & project close out, etc. Best regards Faiyaz

Bachelor's degree, Electronics And Communication Engineering
  • at GULBARGA UNIVERSITY GULBARGA
  • June 1995

Specialties & Skills

Handover
Administration
Management
Detectors
MS-OFFICE

Languages

English
Expert

Memberships

PROJECT MANAGEMENT INSTITUTE,USA
  • Membership
  • July 2011

Training and Certifications

saudi council of engineer (Training)
Training Institute:
registered engineer
Date Attended:
April 2015

Hobbies

  • Reading, playing, listening