FARESS TALA, Petroleum Engineers ' i want any opportunity'

FARESS TALA

Petroleum Engineers ' i want any opportunity'

sonatrach

Lieu
Algérie
Éducation
Master, service "prodution & drilling"
Expérience
4 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :4 years, 11 Mois

Petroleum Engineers ' i want any opportunity' à sonatrach
  • dz,4,0
  • septembre 2015 à septembre 2016

1/Management company oil & gas offshore & onshore
2/h2s awareness course ' basic and advanced'
3/ Well controil awareness course

Operator à sonatrach with halliburtoin
  • Algérie
  • juillet 2013 à mai 2015

•Work as directed by my immediate superior
•Experience on spotting the above on onshore On Spotting The Above On Onshore locations.
•Familiar with all testing safety and regulations procedures, such as gas detection systems, fire fighting & control sustems Etc
•Run the well testing Program Of Well Testing Calculation
•Hand Calculating Gas, Oil And Water Rates
•Can calibrate all measuring equipment such (Ranarex gravimeter- Senior deniels orifice meter- Pressure controllers- Transfer Pumps- Level controllers - Pressure and Level actuators)

mud logging operator à SONATRACH with schlumberge
  • Algérie
  • mai 2012 à avril 2013

•Collecting drill cuttings.
•Describing the cuttings (type of minerals present).
• Maintaining a record of drilling parameters (Master Log).
Operating and maintaining a real-time computer-based data acquisition system, the advanced logging system (ALS3B, Anax 500, Geolog), which records all aspects of rig activity
•Assisting the wellsite geologist during coring operations.

assistant spv 'mud logging date' à sonatrach& nabors
  • Algérie
  • juin 2011 à juin 2012

•Processing and interpretation of different types of borehole geophysics data particularly Vertical.
•Profile (VSP) which includes Check shots, Rig source, Offset VSP and related products such as sonic calibration and synthetic seismogram
•supporting and coaching team, and doing a technical review, also I am doing a follow up of a monthly BHS Activity in Algeria.
•Prediction of fracture orientation using Shear VSP data processing.
•Shear profile computation forme VSP data and Rock Types Analysis

Éducation

Master, service "prodution & drilling"
  • à university algerian API
  • juin 2015

I’m a petroleum engineer who graduated from Algerian university, faculty of engineering –petroleum department with very well (GPA 3.85)

Master, drilling
  • à university
  • juin 2013

Summary my dessertation All alternatives for drilling conventionally should be exhausted before committing to floating mud cap drilling, as it is a very high risk technique. The well is on the verge of being uncontrolled at any time during the drilling operation. When mud cap drilling is anticipated, specific well control procedures should be in place prior to penetrating the loss zone. It should be matched with the characteristics of the zone. Successful use of a floating mud cap can result in the penetration of the loss zone without setting an extra string of casing

Specialties & Skills

Production
English
Logging
senior loggin
senioe mudlogging
Drilling
logging
logging
engineer petroleum
DUEA english
DUEA production
floorman
senior well testing
derrickman
roustabout

Langues

Anglais
Expert

Adhésions

ANADARCO
  • SUPERVISURE
  • March 2014

Formation et Diplômes

world learning (Certificat)
Date de la formation:
March 2012
Valide jusqu'à:
May 2013

Loisirs

  • career petroleum drilling
    Mud logging Engineering surveys Logging tools: Induction and later log (HDIL-DLL-RTEX) Coring& DST Well testing & coiled tubing onshore site investigation Liner cementing guidelines.