Project manager of precommisssioning and commissioning of polypropylene petrochemical plant
Sazeh farfan
Total years of experience :23 years, 4 Months
-Recruitment of efficient specialists in disciplines
piping, mechanical equipment, electrical and
instrument, process
-Using ICAPS system based on opercom methodology
-Identifying all system and subsystems for plant
-Preparing a puch data base in all desciplines
-Preparing precomm. Procedure
-Preparing commissioning procedure
-Preparing HSE procedure for precom. And com.
Duration
-Supervision in all precom. And com. Activities such as
piping flushing, piping reinstatement, electrical motors
solo run, fixed equipment box up, rotating equipment final alignment, cable meger test and hi pot test, switch
gear (MV-LV) test, instrument devices calibration, loop
check, function test, …..
-Preparing of master defect list for yatimtaq amine plant
and khojagogerdaq dehydration unit
- Preparing mechanical spare part list for yatimtaq amine
plant and khojagogerdaq dehydration unit
- Preparing mechanical and process optimization plan
for yatimtaq amine plant and khojagogerdaq
dehydration unit
- Preparing mechanical operation and maintenance
report for yatimtaq amine plant and khojagogerdaq
dehydration unit
-Hold a mechanical training course related to rotating
and fixed equipment for Afghan Gas Company’s staff
-Head of piping and civil and steel structure and
fix and rotating equipments and electrical &
instrument technical office and
precommissioning and commissioning manager
-Preparation of piping hydrotest Packages and
peforming cleaning and hydrotest and draining
and arying and also reinstatement, leak test of
piping system
-Switchgear boards Installation, adjustment and
cabling, termination and performing all required
test such as meger and hi pot test CT and PT
and relay setting and so on
-Coordination with commissioning Engineers
various disciplines and all the prescribed
activities to be carried out
-Preparation of the pre-commissioning and
commissioning result documents in ICAPS
-Instrument devices Calibration and Installation
and performing all related test such as loop
checking and function test
- Head of piping and civil and steel structure and
fix and rotating equipments and electrical &
instrument technical office and
precommissioning and commissioning manager
-Preparation of piping hydrotest Packages and
peforming cleaning and hydrotest and draining
and arying and also reinstatement, leak test of
piping system
- All Fix and rotating equipments installation,
prealignment, half grout and full grout, final
alignment
- Performing solo run test for all electrical motors
and obtaining MRT certificate
-Preparation of the pre-commissioning and
commissioning result documents in ICAPS
- site manager of steam company in South Pars
Phase 13 Rajab Gas Refinery Project
- Performing all site activities such as piping
fabrication and erection, pipe support fabrication
and erection, line checking and hydrotest,
flushing and reinstatement
-Preparation of the pre-commissioning and
commissioning result documents in ICAPS
- Coordination with all execution subcontractor for
performing the work based on project PMS and
master plan
- Coordination with commissioning Engineers
various disciplines and all the prescribed activities
to be carried out
- Calibration and testing voltage, current, active
power, reactive power, frequency transducers
-Testing and Commissioning of power and
transformers
-Erection and Installation of GIS equipment and
the assemblies
- Installation of relay and protection system
- Test and Commissioning of Protection and
Control circuits
- Measuring equipment testing and commissioning
-Preparation of piping hydrotest Packages and
performing cleaning and hydrotest and draining
and drying and also reinstatement, leak test of
piping system
- All Fix and rotating equipments installation,
prealignment, half grout and full grout, final
alignment
- Performing all site activities such as piping
fabrication and erection, pipe support fabrication
and erection, line checking and hydrotest,
flushing and reinstatement
-Coordination with all execution subcontractor for
performing the work based on project PMS and
master plan
-Review all subcontractors monthly invoices
- Preparing final dossiers packages
-Calculate the project’s BOQ based on project
data base and finalize the quantities with owner
-Review and rectify subcontractors contractual
claims
-Design the firefighting system(Co2 firefighting
system for industrial buildings)
- Execution of 44 km of feed pipeline based on
topographic drawings:
- Excavation of pipe line route
-Execution of pile line coating and holiday test
-Execution of pipe line Bending, fit-up, and welding
and all not destructive examinations
- Execution of Compressor station
- Execution of metering package
- Execution of pig receiver facilities
- Performing hydrostatic test