فرحان علام, Contractor Name

فرحان علام

Contractor Name

P.W.D

البلد
الهند - لكنو
التعليم
بكالوريوس, Gradutaion
الخبرات
4 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :4 years, 0 أشهر

Contractor Name في P.W.D
  • الهند
  • يناير 2012 إلى ديسمبر 2013

CAREER SKETCH

• Lucknow Infrastructures, Lucknow Engineer (Q.S, C.A.D. & Billing Engineering Dept.)
• N.K.G. Infrastructure Ltd., Lucknow Engineer (Q.S, C.A.D. & Billing Engineering Dept.)


PROJECT UNDERTAKING

• Project Name: Two laning with paved shoulder of Raebareilly to Allahabad Section of NH 24B From Km (82+000) to Km (188+600) in the state of Uttar Pradesh Through Public Private Partnership (PPP) on Design, Build, Finance, operate & Transfer (DBFOT) on the Toll Basis Under NHDP-IV A.
• Work Done: To Prepare the DPR, RFI, X-Section, L-Section, Bar Chart & Bill of the (Highway & Structure) Project as per BOQ and also prepare the Sheet.
• Contractor Name: VIL Ltd.
• Sub Contractor Name: Lucknow Infrastructures
• Client Name: National Highway Authority of India.

• Project Name: Strengthening and Widening of Hazratganj-Vikramaditya Chauraha- Ziamau Chauraha- Polytechnic (Lohiapath)
• Work Done: To Prepare the DPR, L-Section, X-Section, Bar Chart & Bill of the Project as per BOQ and also prepare the Sheet.
• Contractor Name: N.K.G. Infrastructure Ltd.
• Client Name: P.W.D
• Agreement No: 05/SE-PD/12-13
• Project Name: Rehabilitation of SH 13 from Barabanki (Ch. 96+750) to Bachhrawan (Ch. 175+000) & MDR 03 from Asandra (Ch. 0+000) to Ramsanehighat (Ch. 17+250)

• Work Done: Successfully Complete the Remaining Bill and Level Sheet of the (Shoulder) earth Work.

Contractor Name في P.W.D
  • يناير 2008 إلى ديسمبر 2009

• Contractor Name: N.K.G. Infrastructure Ltd.
• Client Name: P.W.D
• Agreement No: 01/SE/WBYC/2008-09
Accountabilities:
C.A.D Drawing

B.B.S Drawing
Quantity Surveying

D.P.R
Bill Prepare
Level Sheet
Quantity Sheet

Execution Work

• To Prepare the Typical Cross Section of Structures as required and Directed by the Client.

• To Prepare the Bar Bending Schedule as required and Directed by the Client Guiding and Contractors by BBS.
• Measurement of work done on daily basis as per drawing provided by client and compare with Site quantity used.
• Prepare the Daily Progress Report on the basis of site work done and also prepare the Detailed Project Report.
• Prepare the monthly Bill on the Basis of D.P.R.

• To prepare the level Sheet as per level given by Surveyor.

• To Prepare the Quantity Sheet as per level provided by the Surveyor.

• Acting Site In-charge for a month and done the Execution work like Drain Subgrade, PCC, Raft and Wall Construction & Laying of DBM.


SCHOLASTICS

الخلفية التعليمية

بكالوريوس, Gradutaion
  • في Integral University
  • يناير 2010
الثانوية العامة أو ما يعادلها,
  • في A.I.I.C. College
  • يناير 2005

• Intermediate from A.I.I.C. College, Lucknow in 2005.

الثانوية العامة أو ما يعادلها,
  • في A.I.I.C. College
  • يناير 2003

• SSC from A.I.I.C. College, Lucknow in 2003. I.T. SKILLS • Excel, MS Office, Auto CAD. Window XP, Window7, C, C++, SQL.

اللغات

الأوردو
متوسط